[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-166683-105":3,"detail-sidebar-cat-1-en-105":80,"doc-detail-166683-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","highway-design-checklist-dotpf-central-region-final-pse-review","HIGHWAY DESIGN CHECKLIST - DOT&PF Central Region - Final PS&E Review","","Highway Design Checklist is an official DOT&PF Central Region form used before delivering Final Plans, Specifications, and Estimate (Final PS&E) to the Contracts Section at the ATA milestone. It standardizes how the design team documents that every required plan sheet category is reviewed, completed, and formatted per DOT&PF policy and design procedures. The checklist includes reviewer responsibilities, sign-off rules for included or excluded plan sheets, and detailed requirements across A to F sheet sets plus rounding and quantity-computation guidance.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/forms/","Forms",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/highway-design-checklist-dotpf-central-region-final-pse-review/166683/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/highway-design-checklist-dotpf-central-region-final-pse-review/166683.png","ImageObject",442,249,{"name":42,"@type":43},"Margaret","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-24","2026-08-31",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"When must the Highway Design Checklist be completed and submitted?","Question",{"text":62,"@type":63},"It must be filled out before delivering the Final Plans, Specifications, and Estimate (Final PS&E) to the Contracts Section at the ATA milestone. A completed copy is required with the Final PS&E.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"Who signs the “designed” and “checked” columns for in-house and consultant projects?",{"text":67,"@type":63},"For in-house projects, each section’s Lead Designer initials the “designed” column and an Engineer of Record (or another qualified designer) initials the “checked” column. For consultant projects, the consultant Lead Designer initials the “designed” box, and the consultant Engineer of Record initials the “checked” box, with the DOT&PF consultant coordinator ensuring checklist compliance.",{"name":69,"@type":60,"acceptedAnswer":70},"What should the Engineer of Record do when plan sheet categories are not included?",{"text":71,"@type":63},"The Engineer of Record must sign off that excluded sheet categories were considered and found irrelevant and/or not pertinent. Sheets marked “NO” can be removed from the checklist, and the EOR must provide a reason for any omitted categories.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},166683,1788197969,{"code":4,"msg":81,"data":82},"success",[83,88,93,98,103,108,112,117,122],{"id":84,"doc_module":22,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},11,"Presentations",90,"presentations",{"id":89,"doc_module":22,"doc_module_name":25,"category_name":90,"show_sort_weight":91,"slug":92},12,"Resumes",80,"resumes",{"id":94,"doc_module":22,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},14,"Invoices",70,"invoices",{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},15,"Posters",60,"posters",{"id":104,"doc_module":22,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},16,"Social Media",50,"social-media",{"id":109,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":110,"slug":111},17,40,"forms",{"id":113,"doc_module":22,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},18,"Letters",30,"letters",{"id":118,"doc_module":22,"doc_module_name":25,"category_name":119,"show_sort_weight":120,"slug":121},21,"Paper Templates",5,"papers-templates",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":4,"slug":125},158,"General","general-158",{"code":4,"msg":81,"data":127},{"doc_id":78,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":109,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":135,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":79,"read_time":140},137451207643,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","State of Alaska\nDepartment of Transportation\n&\nPublic Facilities\nCentral Region\nHighway Design\nP.O. Box 196900\nAnchorage, Alaska   99519-6900\nHighway Design Checklist\n\u000f\nDEPARTMENT OF TRANSPORTATION\n&\nPUBLIC FACILITIES\n(Central Region)\nHIGHWAY DESIGN CHECKLIST\nThis form shall be filled out prior to delivering the Final Plans, Specifications, and Estimate (Final PS&E – ATA Milestone) to the Contracts Section.  It is recommended that the Design Team use this checklist throughout the design process to ensure the Final PS&E is complete and formatted in accordance with DOT&PF policy and design procedures.\nHow to fill out this document:\nFor in-house designed projects, the Lead Designer of each section initials, by hand, the “designed” column and ensures the Engineer of Record, or another designer familiar with project development and design standards, conducts an independent review and has initialed the “checked” column.\nFor consultant designed projects, the consultant Lead Designer of each section initials, by hand, the “designed” box and the consultant Engineer of Record initials the checked box.  The DOT&PF consultant coordinator will ensure that the Final PS&E has been done in accordance with this checklist.\nDO NOT fill this form out electronically!  This should not be an exercise in copy/paste but should be a thoughtful, careful, vigilant exercise in checking your work product.\nThe completed Highway Design Checklist should be included in the project file.  The Contracts Section requires a copy of the Highway Design Checklist to be submitted with the Final PS&E.\nREVIEWERS\n\u000fPLAN SHEETS\nINDEX\nA typical Final PS&E includes the following plan sheet categories. However, depending on the size and scope of a project, not all sheets may be included in the set.  The Engineer of Record (EOR) must sign off that the sheets not included in the plans have been considered and have been found irrelevant and/or not pertinent to the design of this project (this should be discussed with the DOT&PF Project Manager). Sheets marked ‘NO’ will not require the section to be included in the checklist and can be deleted.  The EOR must include a reason for not including the plan sheet categories below.\nReason for not including sheets in project:\nEngineer of Record’s Initials: __________\n\u000fShown below is an outline of items required to complete an acceptable Final PS&E.  Fill in each blank.  If an item is not applicable to the project, use “N/A”.\nALL SHEETS\nThe following items should be shown on each plan sheet*.  It’s recommended to do this check first.\n*Unless otherwise noted\n\u000f‘A’ SHEETS\nTITLE SHEET\n\u000fSHEET LAYOUT, SCHEMATIC, INDEX, GENERAL NOTES SHEET\nLEGEND\nSURVEY CONTROL\nAll Survey Control Sheets shall be checked and approved by the DOT&PF Survey Manager or their representative, prior to final placement in the Plan Set.\n\u000f‘B’ SHEETS\u000bTYPICAL SECTIONS\n\u000f‘C’ SHEETS\u000bESTIMATE OF QUANTITIES\u0005\n* Consider the following guidance when rounding:\nPlan quantities should never be more exact than can be reasonably measured in the field.\nUse the same rounding methodology for a bid item in multiple projects or categories.\nThe use of partial units is discouraged. However, partial units may be used for items measured by acre (AC) or mile (MI). Partial units may also be used for items such as signs (SF) & guardrail (LF) due to the method of measurement.\nDo not round quantities more than one percent to retain the accuracy of the estimated quantity.\n** Only the Pay Items that have calculations associated with them should be included in either a D sheet table or on P&Ps for storm drain networks or in the Quantity Computations Notebook. We do not want items that have no associated calculations, such as 640.0001 Mobilization & Demobilization or 641.0006 Withholding, included in the Quantity Computation Notebook.\n\u000f‘D’ SHEETS\u000bSUMMARY TABLES\nNote:  The ‘D’ Section should contain summary tables for all work items except those shown on the Traffic Sheets (Salvage Sign, Signing, Lighting ","cbCaivxUUro25ZjY","https://ap.wps.com/l/cbCaivxUUro25ZjY","docx",167609,37,"English","# How to fill out this document\n# REVIEWERS\n# PLAN SHEETS\n## ALL SHEETS\n## ‘A’ SHEETS\n## ‘B’ SHEETS\n## ‘C’ SHEETS\n## ‘D’ SHEETS\n## ‘E’ PLAN SHEETS","[{\"question\":\"When must the Highway Design Checklist be completed and submitted?\",\"answer\":\"It must be filled out before delivering the Final Plans, Specifications, and Estimate (Final PS\\u0026E) to the Contracts Section at the ATA milestone. A completed copy is required with the Final PS\\u0026E.\"},{\"question\":\"Who signs the “designed” and “checked” columns for in-house and consultant projects?\",\"answer\":\"For in-house projects, each section’s Lead Designer initials the “designed” column and an Engineer of Record (or another qualified designer) initials the “checked” column. For consultant projects, the consultant Lead Designer initials the “designed” box, and the consultant Engineer of Record initials the “checked” box, with the DOT\\u0026PF consultant coordinator ensuring checklist compliance.\"},{\"question\":\"What should the Engineer of Record do when plan sheet categories are not included?\",\"answer\":\"The Engineer of Record must sign off that excluded sheet categories were considered and found irrelevant and/or not pertinent. Sheets marked “NO” can be removed from the checklist, and the EOR must provide a reason for any omitted categories.\"}]","HIGHWAY DESIGN CHECKLIST - DOT&PF Central Region - Final PS&E Review | DOCX",13]