[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-239857-105":53,"doc-detail-239857-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","higgins-lake-utility-authority-monthly-client-report-november-2017","Higgins Lake Utility Authority - Monthly Client Report - November 2017","","Monthly client report for Higgins Lake Utility Authority covering operations and maintenance activities for November 2017. Prepared by Wade Trim Operations Services and addressed to the Business Manager, it summarizes flow and utility statistics, including monthly influent totals and minimum/maximum weekly flow values, along with W.W.T. F. performance figures for influent and effluent. The report also records monitor well sampling status, absence of E-one call outs and miss dig activities, ongoing algae and weed control, generator maintenance, board items for standby generator service, and prioritized winterization tasks.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":41,"@type":70,"position":76},"https://docshare.wps.com/template/letters/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/higgins-lake-utility-authority-monthly-client-report-november-2017/239857/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/higgins-lake-utility-authority-monthly-client-report-november-2017/239857.png","ImageObject",442,249,{"name":88,"@type":89},"Aladdin","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-23","2026-09-11",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",7,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What flow and utility statistics are reported for November 2017?","Question",{"text":109,"@type":110},"The report provides 1st–7th, 8th–14th, 15th–21st, and 22nd–31st flow figures, plus minimum and maximum weekly flows and the monthly influent total for 2017 compared with 2016.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What happened regarding E-one call outs and miss dig activities in November 2017?",{"text":114,"@type":110},"There were no E-one call outs during November, and there were no miss digs during the month of November.",{"name":116,"@type":107,"acceptedAnswer":117},"What maintenance and planning actions are included for the month?",{"text":118,"@type":110},"Maintenance items include ongoing algae and weed control and flushing irrigation heads before resuming discharge. Strategic planning includes replacement of a failed E-One pump for spare inventory, and priorities focus on winter storage and standby generator load testing pending board approval.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},239857,1790727917,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":40,"category_name":41,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":73,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":9},2336478503145,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","Monthly Client Report for Higgins Lake Utility Authority  \nNovember 2017  \nTo: Mr. Paul Tatro, Higgins Lake Utility Authority Business Manager  \nFrom: Theron Scharffe, Operations & Maintenance Specialist  \nWade Trim Operations Services (WTOS)  \nDate: December 1, 2017  \nSubject: Monthly Report for November 2017  \nIn order to provide the Higgins Lake Utility Authority (HLUA) with a summary of our activities for the month, Wade Trim Operations Services has prepared this report for your review. We welcome any suggestions to improve the information contained in these reports. Please contact us if you believe this report contains errors, or if you have any questions about it.  \nFlow and Utility Statistics  \n\n| Parameters | 2016 | 2017 | Difference |\n| --- | --- | --- | --- |\n| 1st-7th flow | 38,701 | 46,725 | + 8,024 |\n| 8th-14th flow | 42,700 | 43,475 | +775 |\n| 15th-21st flow | 34,101 | 57,416 | +23,315 |\n| 22nd-31st flow | 40,797 | 49,346 | +8,549 |\n| Minimum Weekly flow | 34,101 | 43,475 | +9,374 |\n| Maximum Weekly flow | 42,700 | 57,416 | +14,716 |\n| Monthly influent total | 158,202 | 196,962 | +38,760 |\n\nW.W.T. F. Performance  \n\n| Parameters | Influent | Effluent | Difference |\n| --- | --- | --- | --- |\n| 2016 yearly totals | 3,129,900 | 3,686,677 | +556,777 |\n| 2017 year to date totals | 3,166,566 | 3,426,386 | +259,820 |\n| November Totals | 196,962 | 0 | -196,962 |\n\nMonitor Well Status  \n• Wells were sampled in November  \nMonthly E-one Activity Summary  \n• There were no Eone call outs during the month of November  \nMonthly Miss Dig Activity Summary  \n• There were no miss digs during the month of November.  \nStrategic Planning  \n• Replacement of one (1) failed E-One pump for spare inventory.  \nMaintenance  \n• Algae and weed control efforts are ongoing.  \n• Clear weeds and flush irrigation heads before resuming discharge.  \nCummins Backup Generator  \n• Monthly and weekly inspections and required maintenance activities were completed. Super Z Lawn Mower-  \n• Monthly and weekly inspections and maintenance activities were completed.  \nBoard Considerations  \n• Need Board approval to service the standby generator  \n• Two quotes have been provided to perform necessary repairs to standby generator  \nOther Noteworthy Events or Activities  \n• Aerators taken out of ponds and winterized  \n• Fields were drained and winterized  \n• Pond switched over to winter operation as required.  \nPriorities for this month  \n• Remove Sprinkler heads drain, clean, and store for winter season.  \n• Perform required standby generator load testing per board approval. Quotes for recommended work are attached for Board review.  \n• Continuation of repairing Eone pumps.  \n• Test snow blower for winter operation.  \nTheron Scharffe  \nOperations & Maintenance Specialist Wade Trim Operations Services (WTOS)  \ncc: Ken Schaut, Senior Project Manager, WTOS  \nProject File","cbCailAjsAltZzcQ","https://ap.wps.com/l/cbCailAjsAltZzcQ","pdf",283119,"English","# Flow and Utility Statistics\n## W.W.T. F. Performance\n## Monitor Well Status\n## Monthly E-one Activity Summary\n## Monthly Miss Dig Activity Summary\n## Strategic Planning\n## Maintenance\n## Cummins Backup Generator\n## Super Z Lawn Mower\n## Board Considerations\n## Other Noteworthy Events or Activities\n## Priorities for this month","[{\"question\":\"What flow and utility statistics are reported for November 2017?\",\"answer\":\"The report provides 1st–7th, 8th–14th, 15th–21st, and 22nd–31st flow figures, plus minimum and maximum weekly flows and the monthly influent total for 2017 compared with 2016.\"},{\"question\":\"What happened regarding E-one call outs and miss dig activities in November 2017?\",\"answer\":\"There were no E-one call outs during November, and there were no miss digs during the month of November.\"},{\"question\":\"What maintenance and planning actions are included for the month?\",\"answer\":\"Maintenance items include ongoing algae and weed control and flushing irrigation heads before resuming discharge. Strategic planning includes replacement of a failed E-One pump for spare inventory, and priorities focus on winter storage and standby generator load testing pending board approval.\"}]","Higgins Lake Utility Authority - Monthly Client Report - November 2017 | PDF",1789153936]