[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-244356-105":53,"doc-detail-244356-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","hazard-assessment-checklist-safe-work-procedure","Hazard Assessment Checklist - Safe Work Procedure","","Jobsite hazard assessment checklist covering site surroundings, overhead and underground services, vehicles and pedestrian traffic, buildings and assets, ground hazards, and environmental conditions such as wind, rain, and storms. Includes sections for trees requiring work, defects and hazard evaluation, machinery and equipment pre-start inspections, suitable setup location, and exclusion zone marking. Provides tick boxes for hazards controlled or requiring further action, with a dedicated comments area to record follow-up steps, supported by referenced SWMS and SOPs.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/hazard-assessment-checklist-safe-work-procedure/244356/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/hazard-assessment-checklist-safe-work-procedure/244356.png","ImageObject",442,249,{"name":88,"@type":89},"Lucas Martin","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-22","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",10,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What does the hazard assessment checklist require workers to do?","Question",{"text":109,"@type":110},"Workers place a tick in the Safe column if hazards are controlled, or mark an A when further action is required before the work can proceed. They use the comments area to record additional actions beyond existing SWMS and SOP controls.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"Which hazards are assessed around the site?",{"text":114,"@type":110},"The checklist covers overhead powerlines and services, underground services identification and marking, vehicles and pedestrian traffic exclusion zones, safe distances from buildings and assets, ground hazards and obstacles, and hot/cold and weather conditions such as wind, rain, and storms.",{"name":116,"@type":107,"acceptedAnswer":117},"How is tree work and machinery preparation checked?",{"text":118,"@type":110},"Tree sections require assessment of root stability, splits, decay and disease, creeper vines, insect colonies, animals, heavy leaning crowns, interlocked branches, and other hazards. Machinery and equipment require inspection, pre-start maintenance for listed tools, confirmation of suitable machine setup location, and marking of exclusion zones.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},244356,1789216463,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":73,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":126,"read_time":9},8796095360427,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","| Client’s name |  | Starting date |  |\n| --- | --- | --- | --- |\n| Job address |  |  |  |\n| Description of work |  |  |  |\n| Type of location | 􀂉 Private property 􀂉 Public property 􀂉 Roadside 􀂉 Other: |  |  |\n| Tree access | 􀂉 Ground 􀂉 Climber 􀂉 EWP 􀂉 Other: |  |  |\n| Machines | 􀂉 EWP 􀂉 Crane 􀂉 Excavator 􀂉 Stump grinder 􀂉 Chipper & tip truck |  |  |\n| Other workers | 􀂉 Groundsmen:   􀂉 Traffic controllers:   􀂉 Other: |  |  |\n\nHazard Assessment Checklist  \nPlace a tick in the ‘Safe’ column if hazards have been controlled, or an ‘A’ if further action is required before the work can proceed. Use the comments space to detail any actions that still need to be taken, over and above the control measures already listed in the SWMS and SOPs that apply to this job.  \n\n| Around the site |  | Safe |\n| --- | --- | --- |\n| Overhead powerlines and services lines | All work to be done is outside the specified safe approach distances for powerlines, and clear of telephone lines and other cables |  |\n| Underground services | Gas, water, power and other services have been correctly identified and marked before digging or grinding commences |  |\n| Vehicles and pedestrian traffic | Exclusion zones marked by cones and signs; pedestrians have alternative thoroughfares; traffic controllers organised (if required) |  |\n| Buildings and assets | Safe working distances have been maintained from buildings and other assets; heritage items, significant trees, etc have been identified |  |\n| Ground hazards and obstacles | Plant operators and truck drivers are alerted to sloping ground; warning signs are placed near drop-offs; trip hazards are removed |  |\n| Hot or cold conditions; wind, rain and storms | All workers have sunscreen available, plenty of drinking water, and are appropriately dressed; work can be stopped if conditions are unsafe |  |\n| Other: |  |  |\n| Comments (including further action required) | 􀂉 All hazards adequately controlled (see SWMS & SOPs for control measures) |  |\n\n\n| Tree (or trees) requiring work |  | Safe |\n| --- | --- | --- |\n| Defects and other hazards | Tree has been assessed for: unstable root system, splits, decay, disease, creeper vines, insect colonies, animals, heavy leaning crown, branches interlocked with other trees, all other hazards |  |\n| Comments (including further action required) | 􀂉 All hazards adequately controlled (see SWMS & SOPs for control measures) |  |\n\n\n| Machinery and equipment |  | Safe |\n| --- | --- | --- |\n| Equipment has been inspected and pre-start maintenance has been carried out:\u003Cbr>􀂉 Chainsaws 􀂉 Ropes and harnesses 􀂉 Rigging equipment 􀂉 EWP 􀂉 Excavator\u003Cbr>􀂉 Stump grinder 􀂉 Chipper 􀂉 Tip truck 􀂉 Crane 􀂉 Other: |  |  |\n| Set-up location is suitable for machine; ground is firm and stable; exclusion zone is marked out |  |  |\n| Comments (including further action required) | 􀂉 All hazards adequately controlled (see SWMS & SOPs for control measures) |  |\n\nToolbox Meeting Minutes  \n\n| Issues raised or discussed at meeting |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- |\n|  |  |  |  |  |  |\n| Follow-up action (where further action is required) |  |  |  |  |  |\n|  |  |  |  |  |  |\n| Name |  | Signature |  | Date |  |\n\nCrew member sign-on  \nStatement: I confirm that I have contributed to the risk assessment process and attended the toolbox meeting documented above. I agree to follow all company and site-specific procedures that apply to this job, including those listed in the SWMS and SOPs that are relevant to my job role.  \n\n| Name | Signature | Date | Job role / position |\n| --- | --- | --- | --- |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |","cbCaimsTOl3MZnaz","https://ap.wps.com/l/cbCaimsTOl3MZnaz","pdf",143143,"English","# Hazard Assessment Checklist\n## Around the site\n## Tree (or trees) requiring work\n## Machinery and equipment\n# Toolbox Meeting Minutes\n## Issues raised or discussed at meeting\n## Follow-up action\n# Crew member sign-on\n## Statement and confirmation","[{\"question\":\"What does the hazard assessment checklist require workers to do?\",\"answer\":\"Workers place a tick in the Safe column if hazards are controlled, or mark an A when further action is required before the work can proceed. They use the comments area to record additional actions beyond existing SWMS and SOP controls.\"},{\"question\":\"Which hazards are assessed around the site?\",\"answer\":\"The checklist covers overhead powerlines and services, underground services identification and marking, vehicles and pedestrian traffic exclusion zones, safe distances from buildings and assets, ground hazards and obstacles, and hot/cold and weather conditions such as wind, rain, and storms.\"},{\"question\":\"How is tree work and machinery preparation checked?\",\"answer\":\"Tree sections require assessment of root stability, splits, decay and disease, creeper vines, insect colonies, animals, heavy leaning crowns, interlocked branches, and other hazards. Machinery and equipment require inspection, pre-start maintenance for listed tools, confirmation of suitable machine setup location, and marking of exclusion zones.\"}]","Hazard Assessment Checklist - Safe Work Procedure | PDF"]