[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-358698-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-358698-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","haulage-management-plan-wollar-northern-access-road-version-4-approved-use","Haulage Management Plan Wollar Northern Access Road - Version 4 - Approved use","","Haulage Management Plan for the Wollar Solar Farm Sub Station Bench Earthworks Project defines how construction logistics are planned and controlled. It specifies the haulage plan scope, vehicle classification legend, truck details and required quantities, movement schedules for float movements and quarry products, and designated routes including dust control, biosecurity, and roadwork safety zones. It also covers OSOM permits, example daily movements, vehicle movement register sample, impacts on others, light-vehicle route alternatives, route diagrams, and appendices for traffic control and conduct requirements.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/presentations/","Presentations",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/haulage-management-plan-wollar-northern-access-road-version-4-approved-use/358698/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/haulage-management-plan-wollar-northern-access-road-version-4-approved-use/358698.png","ImageObject",442,249,{"name":42,"@type":43},"Guten tag","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-19","2026-09-23",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",5,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What does the haulage plan define and control for the project?","Question",{"text":63,"@type":64},"It defines the haulage plan scope, vehicle details and quantities, truck movement schedules, and designated haulage routes. It also includes requirements for dust control, biosecurity, wildlife considerations, and roadworks zones.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which haulage routes are specified in the plan?",{"text":68,"@type":64},"The plan provides routes from Mudgee to the project and back, routes from the quarry to the project and back, and separate routes for light vehicles. It also includes an alternate light-vehicle route from Mudgee.",{"name":70,"@type":61,"acceptedAnswer":71},"What supporting material is included in the appendices?",{"text":72,"@type":64},"Appendix A contains a traffic control diagram, and additional appendices include a driver’s code of conduct, A1EMC cardinal rules, and the NHVR chain of responsibility content.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},358698,1791914019,{"code":4,"msg":82,"data":83},"success",[84,88,93,98,103,108,113,118,122],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":86,"slug":87},11,90,"presentations",{"id":89,"doc_module":22,"doc_module_name":25,"category_name":90,"show_sort_weight":91,"slug":92},12,"Resumes",80,"resumes",{"id":94,"doc_module":22,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},14,"Invoices",70,"invoices",{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},15,"Posters",60,"posters",{"id":104,"doc_module":22,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},16,"Social Media",50,"social-media",{"id":109,"doc_module":22,"doc_module_name":25,"category_name":110,"show_sort_weight":111,"slug":112},17,"Forms",40,"forms",{"id":114,"doc_module":22,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},18,"Letters",30,"letters",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":55,"slug":121},21,"Paper Templates","papers-templates",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":4,"slug":125},158,"General","general-158",{"code":4,"msg":82,"data":127},{"doc_id":79,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":85,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":135,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":140,"read_time":141},687212321768,"https://ap-avatar.wpscdn.com/avatar/a0010bdbe886d2fe77?x-image-process=image/resize,m_fixed,w_180,h_180&k=1789897067658708522","HAULAGE PLAN  \nWollar Solar Farm Sub Station Bench Earthworks Project  \n\n| Document Preparation and Control | Document Review |\n| --- | --- |\n| Justin Edwards\u003Cbr>Sally Mullinger- | Ian James – |\n| Document Approval | Signature |\n| Chris Pilley- |  |\n\n\n| Document Version History |  |  |  |\n| --- | --- | --- | --- |\n| Version No. | Date | Document Status | Brief Description of Change(s) from Previous Version |\n| 1.0 | 11/05/2021 | DRAFT | Initial draft |\n| 2.0 | 15/11/21 | DRAFT | Changes made to 3.2\u003Cbr>Wording changes to 7.0\u003Cbr>Appendix A-Traffic control Diagram updated.\u003Cbr>Appendix G-Removed |\n| 3.0 | 24/11/2021 | Approved for Use | 8.1 added to include the Alternate route for roadworks |\n| 4.0 | 26/1/2021 | Approved for Use | Appendix A-Traffic control Diagram updated to include safety zones |\n\n\n| | Haulage Management Plan Wollar Northern Access Road | Category: Plan\u003Cbr>Doc ID: A1-WSS-PLA-0005\u003Cbr>Version: 4.0 |\n| --- | --- | --- |\n\nTable of Contents  \nTable of Contents .................................................................................................................................... 2  \n1. Purpose ............................................................................................................................................... 4  \n2. Document Scope................................................................................................................................. 4  \n3. Haulage Plan Scope............................................................................................................................. 5  \n3.1 Legend of vehicle classification proposed for associated works.................................................. 6  \n3.2 Truck Details.................................................................................................................................. 6  \n3.3 Quantities of trucks required........................................................................................................ 7  \n3.3.1 Loads Per Day: Float Movements ≥ 19 meters.......................................................................... 8  \n3.3.2 Loads Per Day: Quarry Products................................................................................................ 8  \n3.4 Quarry Product truck movement schedule.................................................................................. 8  \n4 Designated Haulage Routes ................................................................................................................. 9  \n4.1 Route from Mudgee to Project and return................................................................................... 9  \n4.2 Route from Quarry to Project and return..................................................................................... 9  \n4.3 Dust Control .................................................................................................................................. 9  \n4.4 Biosecurity..................................................................................................................................... 9  \n4.5 Flora, Fauna and Wildlife .............................................................................................................. 9  \n4.6 Road Works Zones ........................................................................................................................ 9  \n4.7 OSOM Permit .............................................................................................................................. 10  \n5. Example Daily Vehicle Movements ................................................................................................... 10  \n5.1 Approximate total amount of movements per week ................................................................. 10  \n5.2 Estimated truck requirements per week.................................................................................... 11  \n6. Vehicle Movement Register Sample ..........................","cbCaifgB8EwUiT6e","https://ap.wps.com/l/cbCaifgB8EwUiT6e","pdf",2005170,28,"English","# Purpose\n# Document Scope\n# Haulage Plan Scope\n## Legend of vehicle classification proposed for associated works\n## Truck Details\n## Quantities of trucks required\n## Quarry Product truck movement schedule\n# Designated Haulage Routes\n## Dust Control\n## Biosecurity\n## Flora, Fauna and Wildlife\n## Road Works Zones\n## OSOM Permit\n# Example Daily Vehicle Movements\n# Vehicle Movement Register Sample\n# Delivery Impacts on Others\n# Route from Mudgee to Project and return. (Light vehicles)\n## Alternate Route from Mudgee to Project and return. (Light vehicles)\n# Haulage Route diagrams\n## Appendix A - Traffic Control Diagram\n## Appendix B - Driver’s Code of Conduct\n## Appendix C - A1EMC cardinal rules\n## Appendix D - NHVR Chain Of Responsibility","[{\"question\":\"What does the haulage plan define and control for the project?\",\"answer\":\"It defines the haulage plan scope, vehicle details and quantities, truck movement schedules, and designated haulage routes. It also includes requirements for dust control, biosecurity, wildlife considerations, and roadworks zones.\"},{\"question\":\"Which haulage routes are specified in the plan?\",\"answer\":\"The plan provides routes from Mudgee to the project and back, routes from the quarry to the project and back, and separate routes for light vehicles. It also includes an alternate light-vehicle route from Mudgee.\"},{\"question\":\"What supporting material is included in the appendices?\",\"answer\":\"Appendix A contains a traffic control diagram, and additional appendices include a driver’s code of conduct, A1EMC cardinal rules, and the NHVR chain of responsibility content.\"}]","Haulage Management Plan Wollar Northern Access Road - Version 4 - Approved use | PDF",1790135007,10]