[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-240814-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-240814-en":127},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","grove-road-construction-management-plan-construction-traffic-management-plan-site-environmental-management-plan-january-2026","Grove Road Construction Management Plan - Construction Traffic Management Plan & Site Environmental Management Plan (January 2026)","","Grove Road Construction Management Plan defines how construction activities for 53 Grove Road, London E3 4PE will be managed, including the Construction Traffic Management Plan (CTMP) and Site Environmental Management Plan (SEMP). It sets objectives and scope to coordinate demolition and construction so impacts on the highway network, residents, businesses and public realm are minimised. The plan supports discharge of Planning Condition 3, aligns with Tower Hamlets Code of Construction Practice templates, and provides the framework for safe access, traffic routing, pedestrian and cyclist protection, noise, vibration, dust and air quality controls, and compliant waste handling.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/presentations/","Presentations",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/grove-road-construction-management-plan-construction-traffic-management-plan-site-environmental-management-plan-january-2026/240814/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/grove-road-construction-management-plan-construction-traffic-management-plan-site-environmental-management-plan-january-2026/240814.png","ImageObject",442,249,{"name":42,"@type":43},"Connor ","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-31","2026-09-11",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",22,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the purpose of the Grove Road CMP, CTMP and SEMP?","Question",{"text":63,"@type":64},"They provide a coordinated framework for managing construction activities at 53 Grove Road, including traffic and environmental controls, to minimise impacts on the surrounding area.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which planning condition does the Construction Management Plan support?",{"text":68,"@type":64},"It supports the discharge of Planning Condition 3, requiring completion and approval of the Council’s Code of Construction Practice Checklist and supporting documents.",{"name":70,"@type":61,"acceptedAnswer":71},"What key objectives are set for the CMP and CTMP?",{"text":72,"@type":64},"They focus on safe and efficient vehicle access, minimising disruption along Grove Road and Clinton Road, preventing congestion and unsafe highway conditions, protecting pedestrians and cyclists, and ensuring legislative and best-practice compliance.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},240814,1791718146,{"code":4,"msg":82,"data":83},"success",[84,88,93,98,103,108,113,118,123],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":86,"slug":87},11,90,"presentations",{"id":89,"doc_module":22,"doc_module_name":25,"category_name":90,"show_sort_weight":91,"slug":92},12,"Resumes",80,"resumes",{"id":94,"doc_module":22,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},14,"Invoices",70,"invoices",{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},15,"Posters",60,"posters",{"id":104,"doc_module":22,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},16,"Social Media",50,"social-media",{"id":109,"doc_module":22,"doc_module_name":25,"category_name":110,"show_sort_weight":111,"slug":112},17,"Forms",40,"forms",{"id":114,"doc_module":22,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},18,"Letters",30,"letters",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":121,"slug":122},21,"Paper Templates",5,"papers-templates",{"id":124,"doc_module":22,"doc_module_name":25,"category_name":125,"show_sort_weight":4,"slug":126},158,"General","general-158",{"code":4,"msg":82,"data":128},{"doc_id":79,"user_id":129,"nickname":42,"user_avatar":130,"doc_module":22,"category_id":85,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":136,"language":137,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":12,"update_tm":141,"read_time":142},687207022233,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","Grove Road  \nConstruction Management Plan (including Construction Traffic  \n          Management Plan) & Site  \n          Environmental Management  \n          Plan  \n            January 2026  \nCMP, CTMP and SEMP | 2  \nCONTENTS  \n1 Introduction 3  \n2 Context, Considerations and Challenges 7  \n3 Construction Management Plan: Construction Programme and Methodology 12  \n4 Construction Traffic Management Plan: Vehicle Routing and Access 15  \n5 Construction Traffic Management Plan: Strategies to Reduce Impacts 20  \n6 Construction Traffic Management Plan: Estimated Vehicle Movements 23  \n7 Site Environmental Management Plan: Assessment of Sensitive Receptors 25  \n8 Noise & Vibration Management Plan 28  \n9 Dust and Air Quality Management Plan 31  \n10 Dust Control Measures 36  \n11 Dust Monitoring– Scheme Proposals 38  \n12 Site Waste Management 41   \nAppendix 1 – Code of Construction Practice Checklist  \nAppendix 2 – Code of Construction Practice Construction Management Plan Template Appendix 3 – Code of Construction Practice Site Environmental Management Plan Template Appendix 4 – Site Location Plan  \nCMP, CTMP and SEMP | 4  \n1.1 Objectives  \nNRG Consulting have been appointed to prepare a Construction Management Plan (CMP), incorporating a Construction Traffic Management Plan (CTMP), and a Site Environmental Management Plan (SEMP) for the proposed development at 53 Grove Road, London, E3 4PE.  \nThe development benefits from full planning permission under London Borough of Tower Hamlets reference PA/24/01789 . The description of development is as follows:  \n‘ Demolition of existing structures and buildings associated with the petrol station (Sui Generis) and erection of 19 no. residential apartments (Use Class C3) together with associated amenity space, refuse store, cycle store, landscaping, and associated works (renewal of PA/21/01417).’  \nThis report has been prepared to support the discharge of Planning Condition 3 , which states:  \n3-No development shall take place, including any works of demolition, until the Council’s Code of Construction Practice Checklist (CoCP Checklist) has been completed, signed by the applicant and approved in writing by the Council, alongside all of the supporting documents, including:  \n• Construction Management Plan including Construction Traffic Management Plan  \n• Site Environmental Management Plan  \nPart A: Noise & Vibration Management Plan  \nPart B: Dustand Air Quality Management Plan  \nPart C: Site Waste Management Plan  \n• Application for consent under Section 61 of the Control of Pollution Act 1974  \nThe Construction Management Plan and Site Environmental Management Plan must follow the Tower Hamlets Council template which can be found on the Council’s website. The development must then be carried out in accordance with the approved CoCP Checklist, documents and plans, unless otherwise agreed in writing.  \nReason: In the interests of highway and pedestrian safety and to preserve the amenity of the area in accordance with the requirements of policies D14, SI1 and T7 of the London Plan (2021), and D. SG4, D. DH8, D. ES2, D. ES9, STR1, D. TR2 and  \nD. TR4 of the Tower Hamlets Local Plan 2031 (2020).  \nThe CMP and SEMP have been prepared in accordance with the London Borough of Tower Hamlets Code of Construction Practice (CoCP) templates and guidance. Upon approval, the development will be carried out in accordance with the approved CoCP Checklist and supporting documents, unless otherwise agreed in writing with the Local Planning Authority.  \n1.2 Scope and Objectives of the CMP and SEMP  \nThe objectives of this CMP and SEMP are to set out a clear, coordinated framework for managing construction activities associated with the proposed development, with particular emphasis on minimising impacts on the surrounding highway network, neighbouring residents, businesses and public realm.  \nThe site is located at the junction of Grove Road and Clinton Road, adjacent to Mile End Park, within a dense urban env","cbCaigVnJHPFisKa","https://ap.wps.com/l/cbCaigVnJHPFisKa","pdf",7743592,100,"English","# Contents\n## Introduction\n## Context, Considerations and Challenges\n## Construction Management Plan: Construction Programme and Methodology\n## Construction Traffic Management Plan: Vehicle Routing and Access\n## Construction Traffic Management Plan: Strategies to Reduce Impacts\n## Construction Traffic Management Plan: Estimated Vehicle Movements\n## Site Environmental Management Plan: Assessment of Sensitive Receptors\n## Noise & Vibration Management Plan\n## Dust and Air Quality Management Plan\n## Dust Control Measures\n## Dust Monitoring– Scheme Proposals\n## Site Waste Management\n## Appendix 1 – Code of Construction Practice Checklist\n## Appendix 2 – Code of Construction Practice Construction Management Plan Template\n## Appendix 3 – Code of Construction Practice Site Environmental Management Plan Template\n## Appendix 4 – Site Location Plan","[{\"question\":\"What is the purpose of the Grove Road CMP, CTMP and SEMP?\",\"answer\":\"They provide a coordinated framework for managing construction activities at 53 Grove Road, including traffic and environmental controls, to minimise impacts on the surrounding area.\"},{\"question\":\"Which planning condition does the Construction Management Plan support?\",\"answer\":\"It supports the discharge of Planning Condition 3, requiring completion and approval of the Council’s Code of Construction Practice Checklist and supporting documents.\"},{\"question\":\"What key objectives are set for the CMP and CTMP?\",\"answer\":\"They focus on safe and efficient vehicle access, minimising disruption along Grove Road and Clinton Road, preventing congestion and unsafe highway conditions, protecting pedestrians and cyclists, and ensuring legislative and best-practice compliance.\"}]","Grove Road Construction Management Plan - Construction Traffic Management Plan & Site Environmental Management Plan (January 2026) | PDF",1789166111,35]