[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-170770-105":53,"doc-detail-170770-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","grid-connection-agreement-for-connection-with-limited-grid-access-purpose-and-scope-of-the-agreement","Grid connection agreement for connection with limited grid access - Purpose and scope of the Agreement","","Grid connection agreement defining rules and conditions for establishing demand facilities with limited grid access and granting access to the public electricity grid. The agreement sets out the relationship hierarchy between indicative provisions, the DSO’s connection provisions, and additional DSO terms, including precedence in case of conflicts. It specifies invoicing settlement under Danish energy legislation, outlines responsibilities for engineering works and compliance, and describes procedural requirements such as submitting Appendix 1 and signing before start-up.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":51,"@type":70,"position":76},"https://docshare.wps.com/template/general/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/grid-connection-agreement-for-connection-with-limited-grid-access-purpose-and-scope-of-the-agreement/170770/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/grid-connection-agreement-for-connection-with-limited-grid-access-purpose-and-scope-of-the-agreement/170770.png","ImageObject",442,249,{"name":88,"@type":89},"Caleb Sterling","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-29","2026-09-01",true,{"@type":98,"interactionType":99,"userInteractionCount":47},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of the Agreement for limited grid access?","Question",{"text":108,"@type":109},"To describe applicable rules and terms for grid connection of demand facilities with limited grid access, and to formalize any voluntary or statutory agreements between the DSO and the Facility Owner.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"Which document takes precedence if there is a conflict?",{"text":113,"@type":109},"The Agreement takes precedence over the DSO’s connection provisions in case of conflict, and provisions labeled as set out in the Agreement also take precedence over the DSO’s other terms and conditions.",{"name":115,"@type":106,"acceptedAnswer":116},"What must the Facility Owner do before establishing the demand facility?",{"text":117,"@type":109},"Complete and submit Appendix 1 to the DSO, and ensure the facility complies with technical rules and requirements in force.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},170770,1788275302,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":50,"category_name":51,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":47,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":125,"read_time":47},962084925290,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","Grid connection agreement for connection with limited grid access\nHereinafter referred to as the ’demand facility’\nbetween\nHereinafter referred to as the ‘Facility Owner’\nand\nHereinafter referred to as the ‘DSO’\n\u000f\n\u0003Table of contents\n\u0013 TOC \\o \"1-3\" \\h \\z \\u \u0014\u0013 HYPERLINK \\l \"_Toc44067830\" \u00141 .\tPurpose and scope of the Agreement\t\u0013 PAGEREF _Toc44067830 \\h \u00145\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc44067831\" \u00142 .\tEstablishment of the demand facility\t\u0013 PAGEREF _Toc44067831 \\h \u00145\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc44067832\" \u00143 .\tSpecial conditions and requirements for the grid connection\t\u0013 PAGEREF _Toc44067832 \\h \u00146\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc44067833\" \u00144 .\tGrid connection and verification\t\u0013 PAGEREF _Toc44067833 \\h \u00146\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc44067834\" \u00145 .\tOperation of the demand facility\t\u0013 PAGEREF _Toc44067834 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc44067835\" \u00146 .\tElectricity meter etc.\t\u0013 PAGEREF _Toc44067835 \\h \u00149\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc44067836\" \u00147 .\tMonitoring compliance with technical requirements\t\u0013 PAGEREF _Toc44067836 \\h \u001410\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc44067837\" \u00148 .\tRunning payments\t\u0013 PAGEREF _Toc44067837 \\h \u001410\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc44067838\" \u00149 .\tDuration, termination and renegotiation of the Agreement\t\u0013 PAGEREF _Toc44067838 \\h \u001411\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc44067839\" \u001410 .\tBreach and interruption of the electrical connection\t\u0013 PAGEREF _Toc44067839 \\h \u001411\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc44067840\" \u001411 .\tOther conditions\t\u0013 PAGEREF _Toc44067840 \\h \u001412\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc44067841\" \u001412 .\tDisputes\t\u0013 PAGEREF _Toc44067841 \\h \u001413\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc44067842\" \u001413 .\tCopies\t\u0013 PAGEREF _Toc44067842 \\h \u001413\u0015\u0015\n\u0015\u0004\nList of appendices\n\u000f\nDefinitions\n\u000f\nAbout the grid connection agreement\nVersion: 2.0\nThe change log describes changes made to the agreement, making it possible to follow the agreement history.\nThis grid connection agreement (hereinafter referred to as the ‘Agreement’) between the Facility Owner and the DSO describes the conditions for the establishment of demand facilities as well as access to the public electricity grid. The Agreement has been drawn up within the framework of the Danish Electricity Supply Act, the Danish Electricity Security Act and COMMISSION REGULATION (EU) 2016/1388 of 17 August 2016 establishing a network code on demand connection. Provisions of the Agreement which do not directly result from legislation, regulations and other terms and conditions have been sent to the Danish Utility Regulator pursuant to section 73b of the Danish Electricity Supply Act.\nThe Agreement has been drawn up in order to provide the Facility Owner with a comprehensive overview of the rules and conditions applicable to the grid connection in order to facilitate the grid connection process. As a result, the Agreement contains provisions explaining existing legislation, regulations etc. These provisions are to be regarded as indicative, as applicable rules and regulations take precedence over this Agreement.\nIn addition to the indicative provisions, the Agreement contains the additional terms and conditions of the DSO for demand facilities with limited grid access as well as voluntary or statutory agreements concluded between the parties to the Agreement which are necessary for the grid connection.\nThe individual provisions of the Agreement are categorised according to whether they are indicative, terms and conditions set out in the Agreement or agreements to be concluded between the parties.\nPurpose and scope of the Agreement\nThe aim of this Agreement is to describe the rules and terms and conditions applicable to grid connection of demand facilities with limited grid access. The Agreement also serves the purpose of formalizing any voluntary or statutory agreements concluded between the DSO and the Facility Owner.\nThe conditions for grid connection and use of the public electricity supply grid are laid down in the ‘DSO’s provisions for connection and use of the distribution grid’ (‘Connection provisions’). In addition, this Agreement also lays down specific conditions for the part of the demand facili","cbCaiaHVUDP3ya1k","https://ap.wps.com/l/cbCaiaHVUDP3ya1k","docx",54111,13,"English","# Purpose and scope of the Agreement\n## Establishment of the demand facility\n## Special conditions and requirements for the grid connection\n## Grid connection and verification\n## Operation of the demand facility\n## Electricity meter etc.\n## Monitoring compliance with technical requirements\n## Running payments\n## Duration, termination and renegotiation of the Agreement\n## Breach and interruption of the electrical connection\n## Other conditions\n## Disputes\n## Copies","[{\"question\":\"What is the purpose of the Agreement for limited grid access?\",\"answer\":\"To describe applicable rules and terms for grid connection of demand facilities with limited grid access, and to formalize any voluntary or statutory agreements between the DSO and the Facility Owner.\"},{\"question\":\"Which document takes precedence if there is a conflict?\",\"answer\":\"The Agreement takes precedence over the DSO’s connection provisions in case of conflict, and provisions labeled as set out in the Agreement also take precedence over the DSO’s other terms and conditions.\"},{\"question\":\"What must the Facility Owner do before establishing the demand facility?\",\"answer\":\"Complete and submit Appendix 1 to the DSO, and ensure the facility complies with technical rules and requirements in force.\"}]","Grid connection agreement for connection with limited grid access - Purpose and scope of the Agreement | DOCX"]