[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-163295-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-163295-en":127},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","georgias-pre-k-program-instructional-quality-iq-guide-for-planning-instruction","Georgia’s Pre-K Program - Instructional Quality (IQ) Guide for Planning Instruction","","The Georgia’s Pre-K Program Instructional Quality (IQ) Guide for Planning Instruction is a document designed for lead teachers to assess and plan instructional quality. This guide should be completed by lead teachers within 30 school/business days of reporting for duty, utilizing a week of completed lesson plans. For teachers using the 12-week lesson plan titled “Off to a Good Start,” the IQ guide completion is expected within two weeks after they begin developing their own lesson plans. The completed guide, along with corresponding lesson plans, must be submitted to the Director/Principal for review, support, and feedback. The Director/Principal will then complete their section of the guide, sign, date, and file it with the Grant Requirement Checklist. A copy of the lesson plan used for the IQ guide assessment must also be included. The document recommends the consistent use of the IQ Guide throughout the academic year as an integral part of the written plan for monitoring lesson plans. It also refers to the FAQ for Planning Instruction for further clarification on instructional activities that should be reflected in lesson plans.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/forms/","Forms",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/georgias-pre-k-program-instructional-quality-iq-guide-for-planning-instruction/163295/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/georgias-pre-k-program-instructional-quality-iq-guide-for-planning-instruction/163295.png","ImageObject",442,249,{"name":42,"@type":43},"Caleb Sterling","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-30","2026-08-31",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",7,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"When should the Instructional Quality (IQ) Guide be completed by lead teachers?","Question",{"text":63,"@type":64},"Lead teachers should complete the IQ Guide within 30 school/business days from when teachers report using a week of completed lesson plans. For those using the \"Off to a Good Start\" 12-week plan, it should be completed within two weeks after starting their own lesson plans.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What is the process for submitting and reviewing the IQ Guide?",{"text":68,"@type":64},"The teacher signs, dates, and submits the guide to the Director/Principal with corresponding lesson plans. The Director/Principal reviews it, provides support and feedback, completes their section, and then files it.",{"name":70,"@type":61,"acceptedAnswer":71},"What other documents should be submitted with the IQ Guide?",{"text":72,"@type":64},"The IQ Guide should be submitted with corresponding lesson plans. A copy of the lesson plan used to complete the IQ guide must also be included. Additionally, the completed guide is filed with the Grant Requirement Checklist.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},163295,1788140956,{"code":4,"msg":82,"data":83},"success",[84,89,94,99,104,109,113,118,123],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":86,"show_sort_weight":87,"slug":88},11,"Presentations",90,"presentations",{"id":90,"doc_module":22,"doc_module_name":25,"category_name":91,"show_sort_weight":92,"slug":93},12,"Resumes",80,"resumes",{"id":95,"doc_module":22,"doc_module_name":25,"category_name":96,"show_sort_weight":97,"slug":98},14,"Invoices",70,"invoices",{"id":100,"doc_module":22,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},15,"Posters",60,"posters",{"id":105,"doc_module":22,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},16,"Social Media",50,"social-media",{"id":110,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":111,"slug":112},17,40,"forms",{"id":114,"doc_module":22,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},18,"Letters",30,"letters",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":121,"slug":122},21,"Paper Templates",5,"papers-templates",{"id":124,"doc_module":22,"doc_module_name":25,"category_name":125,"show_sort_weight":4,"slug":126},158,"General","general-158",{"code":4,"msg":82,"data":128},{"doc_id":79,"user_id":129,"nickname":42,"user_avatar":130,"doc_module":22,"category_id":110,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":26,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":80,"read_time":22},962084925290,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","Georgia’s Pre-K Program\nInstructional Quality (IQ) Guide for Planning Instruction\nToday’s Date:  \u0013 FORMTEXT \u0014     \u0015\nSite Name: \u0013 FORMTEXT \u0014\t\u0015\nTeacher Name: \u0013 FORMTEXT \u0014\t\u0015\nLead teacher will complete within 30 school/business days from when teachers report using a week of completed lesson plans. If the teacher is using the 12 week lesson plan “Off to a Good Start”, the IQ guide should be completed within two weeks after the teacher has begun writing their own lesson plans. Sign, date and submit to the Director/Principal with corresponding plans. Director/Principal will review using the same set of lesson plans/provide support and feedback. Complete director column, sign, date, and file with the Grant Requirement Checklist. Also include a copy of the lesson plan that was used to complete the IQ guide**Refer to the FAQ for Planning Instruction for explanation of instructional activities which should be reflected in lesson plans.\nTeacher Signature:\nDate: \u0013 FORMTEXT \u0014     \u0015/\u0013 FORMTEXT \u0014     \u0015/\u0013 FORMTEXT \u0014     \u0015\nDirector/Principal Signature: _______________________________________________________\tDate:  \u0013 FORMTEXT \u0014     \u0015/\u0013 FORMTEXT \u0014     \u0015/\u0013 FORMTEXT \u0014     \u0015\nIt is recommended this IQ Guide be utilized throughout the year as part of your written plan for monitoring lesson plans.","cbCaie6UVkcxEm7e","https://ap.wps.com/l/cbCaie6UVkcxEm7e","docx",82641,"English","# Georgia’s Pre-K Program\n# Instructional Quality (IQ) Guide for Planning Instruction","[{\"question\":\"When should the Instructional Quality (IQ) Guide be completed by lead teachers?\",\"answer\":\"Lead teachers should complete the IQ Guide within 30 school/business days from when teachers report using a week of completed lesson plans. For those using the \\\"Off to a Good Start\\\" 12-week plan, it should be completed within two weeks after starting their own lesson plans.\"},{\"question\":\"What is the process for submitting and reviewing the IQ Guide?\",\"answer\":\"The teacher signs, dates, and submits the guide to the Director/Principal with corresponding lesson plans. The Director/Principal reviews it, provides support and feedback, completes their section, and then files it.\"},{\"question\":\"What other documents should be submitted with the IQ Guide?\",\"answer\":\"The IQ Guide should be submitted with corresponding lesson plans. A copy of the lesson plan used to complete the IQ guide must also be included. Additionally, the completed guide is filed with the Grant Requirement Checklist.\"}]","Georgia’s Pre-K Program - Instructional Quality (IQ) Guide for Planning Instruction | DOCX"]