[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-161260-105":53,"doc-detail-161260-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","generic-template-for-final-engineering-report-certifications","Generic Template for Final Engineering Report - Certifications","","Generic, non-site-specific template for preparing a Final Engineering Report (FER) for NYSDEC, Division of Environmental Remediation projects. The guide accelerates FER development by standardizing format and general content, improving draft quality, and reducing both applicant preparation and NYSDEC review time. It instructs how to handle blue text, green guidance text, and variable bracketed items, and recommends using track-changes redlines with a clean copy submission. The certifications section includes site, engineer, and submission compliance attestations, with optional additions for specific site conditions and financial assurance.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/generic-template-for-final-engineering-report-certifications/161260/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/generic-template-for-final-engineering-report-certifications/161260.png","ImageObject",442,249,{"name":88,"@type":89},"Aditya","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-21","2026-08-30",true,{"@type":98,"interactionType":99,"userInteractionCount":73},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of this Final Engineering Report template?","Question",{"text":108,"@type":109},"It provides format and general content guidelines to expedite development of an FER under NYSDEC oversight, increase predictability for agency approval, improve draft quality, and streamline review and approval.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"How should blue, green, and bracketed items be treated in the FER?",{"text":113,"@type":109},"Blue text should be retained for site-specific use with minimal changes, green guidance text should be deleted prior to submittal, and blue-bracketed items should be replaced with self-explanatory, case-specific entries. Highlights and brackets should be removed.",{"name":115,"@type":106,"acceptedAnswer":116},"What certifications are included and when do they apply?",{"text":117,"@type":109},"The template includes an engineer’s certification of substantial conformance and data compliance, plus FER-only certifications regarding restrictions/controls and site management plan submission. It also adds optional financial assurance and required electronic submission attestations for both CCRs and FERs.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},161260,1789963161,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":73,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":20},962085564549,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","Generic Template for Final Engineering Report\nInstructions\nThis document is a generic template for development of a Final Engineering Report (FER) for projects performed under the management of NYSDEC, Division of Environmental Remediation. This document is intended to expedite development of the FER. By providing format and general content guidelines, it is intended to increase the predictability of format and content required for agency approval; shorten the document preparation time by Applicants in the program; improve the quality of draft FER submittals; shorten the review time by NYSDEC; and streamline and expedite the process for FER approval by NYSDEC. This is a generic and non-site-specific guide that does not address all possible NYSDEC or NYSDOH issues. It is not intended to replace DER-10 (Tech Guide), DER-31 Green Remediation, or to act as a substitute for the agency review and comment process.  This template may also be used for development of a Construction Completion Report (CCR).\nThis document contains blue text, green text and highlighted bracketed items. Blue text indicates text that is generally acceptable to NYSDEC for use in the site-specific FER. While it must be applied to each site in a manner that is suitable for site-specific conditions, use of this blue text with minimal changes will generally promote a more timely acceptance of the FER by NYSDEC. Green text provides guidance on the recommended content in each of the specific sections of the FER and should be deleted from this template prior to submittal.  Items highlighted in blue brackets are variable and should be entered in a manner that is self-explanatory and specific to each case.\nIt is strongly recommended that the draft FER submittal to NYSDEC adhere to the following conventions:\nRetain the original blue text color for all blue text that is not changed.\nUse black text for all new text, including any changes to blue text.\nDelete all green text\nRemove highlights and brackets\nA track changes redline/strikeout method should be used for all removal and replacement of blue text.\nThe redline/strikeout document should be submitted (with blue text strikeouts in the text and not in the margins) along with a clean copy of the draft FER to NYSDEC.\nWhile this approach is not mandatory, it may greatly shorten the review time required by NYSDEC staff and approval of the document.\nThe following document is a draft and will be modified and improved periodically. Comments and suggestions for improvement are welcome. Redline/strikeout edits of the template are also welcome. Contact the NYSDEC’s project manager if you would like to make sure that you have the most recent version.\n\u000f\n[Site Name]\n[County], New York\nFinal Engineering Report\nNYSDEC Site Number: xxxxxx\nPrepared for:\n[Remedial Party Name]\n[Address]\nPrepared by:\n[Name]\n[Address]\n[Phone]\n[Month Year]\n\u000fCERTIFICATIONS\nI, ________________________, am currently a registered professional engineer licensed by the State of New York, I had primary direct responsibility for implementation of the remedial program activities, and I certify that the [Remedial Action Work Plan or Remedial Design] was implemented and that all construction activities were completed in substantial conformance with the Department-approved [Remedial Action Work Plan or Remedial Design].\nThe following certifications are only required for Final Engineering Reports, and are not applicable to Construction Completion Reports\nI certify that the data submitted to the Department with this Final Engineering Report demonstrates that the remediation requirements set forth in the [Remedial Action Work Plan or Remedial Design] and in all applicable statutes and regulations have been or will be achieved in accordance with the time frames, if any, established for the remedy.\nFor sites other than Track 1 or unrestricted cleanups, include the following two certifications:\nI certify that all use restrictions, Institutional Controls, Engineering Controls,","cbCaihr1g8e80x7V","https://ap.wps.com/l/cbCaihr1g8e80x7V","docx",74141,41,"English","# Instructions\n## Text color handling and required edits\n## Submission and redline guidance\n# Certifications\n## Core engineer certification\n## Additional FER-only certifications\n## Track 1 or unrestricted cleanup exceptions","[{\"question\":\"What is the purpose of this Final Engineering Report template?\",\"answer\":\"It provides format and general content guidelines to expedite development of an FER under NYSDEC oversight, increase predictability for agency approval, improve draft quality, and streamline review and approval.\"},{\"question\":\"How should blue, green, and bracketed items be treated in the FER?\",\"answer\":\"Blue text should be retained for site-specific use with minimal changes, green guidance text should be deleted prior to submittal, and blue-bracketed items should be replaced with self-explanatory, case-specific entries. Highlights and brackets should be removed.\"},{\"question\":\"What certifications are included and when do they apply?\",\"answer\":\"The template includes an engineer’s certification of substantial conformance and data compliance, plus FER-only certifications regarding restrictions/controls and site management plan submission. It also adds optional financial assurance and required electronic submission attestations for both CCRs and FERs.\"}]","Generic Template for Final Engineering Report - Certifications | DOCX",1788095236]