[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-241456-105":53,"doc-detail-241456-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","generation-quality-control-plan-template-approval-and-final-acceptance","Generation Quality Control Plan Template - Approval and Final Acceptance","","Generation Quality Control Plan (QCP) template covering end-to-end governance for project, outage, and maintenance work. Includes approval sections for unit/area details, QCP identification numbers, preparation and revision/addendum tracking, and defined roles for executor, inspection, surveillance, review, hold, witness, and verification. Provides a structured activity register with acceptance standards, responsible parties, signatures, and dates. Concludes with final acceptance outcomes after work execution and data book entry instructions, including controlled disclosure and documentation control center archiving/upload via OpenText.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/generation-quality-control-plan-template-approval-and-final-acceptance/241456/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/generation-quality-control-plan-template-approval-and-final-acceptance/241456.png","ImageObject",442,249,{"name":88,"@type":89},"Lucas Vance","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-07","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":9},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What information is required in the “Approval for Use” section of the QCP template?","Question",{"text":108,"@type":109},"It captures unit/area, project/outage/maintenance ID, component, QCP number, functional location, and date.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"How does the template define inspection and control roles for activities?",{"text":113,"@type":109},"A legend maps codes such as IP (Intervention Point), I (Inspection), S (Surveillance), R (Review), W (Witness), H (Hold), and V (Verification) to their responsibilities.",{"name":115,"@type":106,"acceptedAnswer":116},"What steps does the template include after completing the databook?",{"text":117,"@type":109},"After completion, an authorised copy of the form must be sent to the site Documentation Control Centre for archiving/uploading on OpenText (Records Management).","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},241456,1791408391,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":47,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":73,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":9},549768064622,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","| APPROVAL FOR USE |  |  |  |\n| --- | --- | --- | --- |\n| Unit/ Area |  | Project / Outage / Maintenance ID |  |\n| Component |  | QCP No. |  |\n| Functional location |  | Date |  |\n\n\n| Task/ SOW |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| Section |  |  |  |  |  |  |  |  |  |  |\n| Service Provider/Eskom Maintenance: |  |  |  |  |  |  | Contract/Order No.: |  | Rev No: |  |\n| QCP Prepared By: | Name: |  |  | Designation: |  | Sign: | Review and Approval by: |  |  |  |\n| Revision / Addendum Details |  |  |  |  |  |  | Name: |  | Signature: |  |\n| Date | Add QCP /Rev | QCP NO: |  |  | Signature |  | Designation: |  | Date: |  |\n|  |  |  |  |  |  |  | Name: |  | Signature: |  |\n|  |  |  |  |  |  |  | Designation: |  | Date: |  |\n|  |  |  |  |  |  |  | Name: |  | Signature |  |\n|  |  |  |  |  |  |  | Designation: |  | Date: |  |\n\n\n| Legend: |  | IP-Intervention Point | I -Inspection | S-Surveillance |  |  |  | R-Review |  |  | W-Witness |  |  | H-Hold |  |  | V-Verification |  |  |  |  | E-Executor |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| Act\u003Cbr>No | Description of Activity |  | Specification/\u003Cbr>Procedure/\u003Cbr>Acceptance\u003Cbr>Standard | Service Provider Executor/Eskom Maintenance |  |  | Service Provider Representative/QC\u003Cbr>Rep. |  |  |  |  | Employer\u003Cbr>Representative |  |  |  | System Engineer |  |  | QA/QC |  |  |  | Remarks/ Inspection Record Reference |\n|  |  |  |  | IP | Sign | Date | IP |  | Sign | Date |  | IP | Sign |  | Date | IP | Sign | Date | IP | Sign | Date |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n\nControlled Disclosure  \n\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n\n\n|  | FINAL ACCEPTANCE (After Work Execution) |  |  |  | Final Acceptance into Data Book |\n| --- | --- | --- | --- | --- | --- |\n|  | Service Provider | Employer Rep | System Engineer | QC Rep/Tech | QA /QC |\n| Name: |  |  |  |  |  |\n| Signature: |  |  |  |  |  |\n| Date: |  |  |  |  |  |\n| Additional Remarks/Notes: |  |  |  |  |  |\n\n\n| PLEASE NOTE:\u003Cbr>After completion of the Databook – send an authorised copy of this form through to site Documentation Control Centre for Archiving/uploading on OpenText (Records Management) |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- |\n| DOCUMENTATION CONTROL CENTRE OFFICER/SNR CLERK |  |  |  |  |  |  |\n|  |  | Name & Surname |  | Signature | Date |  |\n|  |  |  |  |  |  |  |\n| Date Uploaded |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n\nControlled Disclosure","cbCait5IyWcwPmXE","https://ap.wps.com/l/cbCait5IyWcwPmXE","pdf",220466,"English","# Approval for Use\n## QCP Identification and Prepared By\n## Revision / Addendum Details\n# Activity Plan and Legend\n## Legend of Quality Control Actions\n## Activity Record Table\n# Final Acceptance and Archiving","[{\"question\":\"What information is required in the “Approval for Use” section of the QCP template?\",\"answer\":\"It captures unit/area, project/outage/maintenance ID, component, QCP number, functional location, and date.\"},{\"question\":\"How does the template define inspection and control roles for activities?\",\"answer\":\"A legend maps codes such as IP (Intervention Point), I (Inspection), S (Surveillance), R (Review), W (Witness), H (Hold), and V (Verification) to their responsibilities.\"},{\"question\":\"What steps does the template include after completing the databook?\",\"answer\":\"After completion, an authorised copy of the form must be sent to the site Documentation Control Centre for archiving/uploading on OpenText (Records Management).\"}]","Generation Quality Control Plan Template - Approval and Final Acceptance | PDF",1789175641]