[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-166703-105":3,"detail-sidebar-cat-1-en-105":80,"doc-detail-166703-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","gcp-registration-form-section-3-registration-summary","GCP Registration Form - Section 3 Registration Summary","","Registration requires completing facility tables and providing a structured Registration Summary describing the site, its process, and any proposed modifications. The form collects facility type, written details of routine operations, and how startup, shutdown, maintenance (SSM) emissions and malfunction emissions are accounted for, including separation from other event categories. It also verifies stack parameter requirements using the provided Stack Calculator guidance, covering engines, turbines, flares, enclosed combustion devices, heaters, and reboilers through equipment-specific emission rate and parameter calculations.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/forms/","Forms",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/gcp-registration-form-section-3-registration-summary/166703/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/gcp-registration-form-section-3-registration-summary/166703.png","ImageObject",442,249,{"name":42,"@type":43},"Putri","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-23","2026-08-31",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What information must be provided in the Registration Summary?","Question",{"text":62,"@type":63},"The Registration Summary must include a brief description of the facility and its process, and if the facility is being modified, the proposed changes.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"How should SSM and malfunction emissions be handled in this registration?",{"text":67,"@type":63},"The registration must provide an overview of how SSM emissions and malfunction emissions are accounted for, keep SSM and malfunction separate in the allowable emissions table, and note that the permit does not authorize combining them as a single 10 TPY VOC quantity.",{"name":69,"@type":60,"acceptedAnswer":70},"What does stack parameter verification require for different equipment types?",{"text":71,"@type":63},"For each selected equipment type, the form requires calculating the applicable NOx or SO2 rates, determining minimum stack parameters or heights from the referenced tables, and completing the verification tables to show whether minimum stack parameters are met; if not met, detailed explanations and calculations are required.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},166703,1788198448,{"code":4,"msg":81,"data":82},"success",[83,88,93,98,103,108,112,117,122],{"id":84,"doc_module":22,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},11,"Presentations",90,"presentations",{"id":89,"doc_module":22,"doc_module_name":25,"category_name":90,"show_sort_weight":91,"slug":92},12,"Resumes",80,"resumes",{"id":94,"doc_module":22,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},14,"Invoices",70,"invoices",{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},15,"Posters",60,"posters",{"id":104,"doc_module":22,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},16,"Social Media",50,"social-media",{"id":109,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":110,"slug":111},17,40,"forms",{"id":113,"doc_module":22,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},18,"Letters",30,"letters",{"id":118,"doc_module":22,"doc_module_name":25,"category_name":119,"show_sort_weight":120,"slug":121},21,"Paper Templates",5,"papers-templates",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":4,"slug":125},158,"General","general-158",{"code":4,"msg":81,"data":127},{"doc_id":78,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":109,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":135,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":79,"read_time":140},962085571259,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Section 2\nTables\n_____________________________________________________________________________________________\nInsert Excel spreadsheet with applicable tables filled out. If applicable to the facility all tables must be filled out completely.\nThe unit numbering system must be consistent throughout this Registration\n_____________________________________________________________________________________________\nSection 3\nRegistration Summary\n______________________________________________________________________________________________________\nThe Registration Summary: Provide information about the registration submittal. The Registration Summary shall include a brief description of the facility and its process.  In case of a modification to a facility, please describe the proposed changes.\n______________________________________________________________________________________________________\nSpecify Facility Type:  Check the appropriate box below:\n\u0013 FORMCHECKBOX \u0014\u0015 Production Site\n\u0013 FORMCHECKBOX \u0014\u0015 Tank Battery\n\u0013 FORMCHECKBOX \u0014\u0015 Compressor Station\n\u0013 FORMCHECKBOX \u0014\u0015 Natural Gas Plant\n\u0013 FORMCHECKBOX \u0014\u0015 Other, please specify:______________\nRegistration Summary:   Provide Registration summary here.  See above instructions.\nWritten description of the routine operations of the facility:  Include a detailed description of how each piece of equipment will be operated, how controls will be used, and the fate of both the products and waste generated.\nRoutine or predictable emissions during Startup, Shutdown and Maintenance (SSM):  Provide an overview of how SSM emissions are accounted for in this Registration.\nMalfunction Emissions (M): Provide an overview of how malfunction emissions are accounted for in this Registration. The permit does not authorize combustion emissions for malfunctions.\nThe permit does not authorize emissions from SSM and Malfunction to be combined as 10 TPY VOC. However, they may be permitted separately.  In the allowable emissions table in Section 2, these two events are separate line items and must be kept separate.\nAllowable Operations:  Check the appropriate box below:\n\u0013 FORMCHECKBOX \u0014\u0015 Facility operates continuously (8760 hours per year)\n\u0013 FORMCHECKBOX \u0014\u0015 The following regulated equipment will operate less than 8760 hours per year.  Add additional rows as necessary. These units are subject to Condition A108.C of the Permit.\nTable A – Equipment Operating Less Than 8760 hours per year\nVerification of Compliance with Stack Parameter Requirements:\nPlease use the Stack Calculator and Stack Requirements Explained Guidance on our website: All of the verification information below is required to be filled out.\n\u0013 HYPERLINK \"http://www.env.nm.gov/air-quality/air-quality-oil-and-gas-gcp-application-forms/\" \u0014www.env.nm.gov/air-quality/air-quality-oil-and-gas-gcp-application-forms/\u0015\nCheck the box for each type of equipment at this facility:\n\u0013 FORMCHECKBOX \u0014\u0015 Engine(s)\n\u0013 FORMCHECKBOX \u0014\u0015 Turbine(s)\n\u0013 FORMCHECKBOX \u0014\u0015 Flares(s)\n\u0013 FORMCHECKBOX \u0014\u0015 Enclosed Combustion Device (s)\n\u0013 FORMCHECKBOX \u0014\u0015 Heater(s)\n\u0013 FORMCHECKBOX \u0014\u0015 Reboiler(s)\nFor each type of equipment checked above, complete the applicable section below.\nEngines\nCalculate the pound per hour (lb/hr) NOx emission rate according to GCP O&G Condition A202.I Step 1 on page 15 of the GCP O&G. Enter this value in the top row of the table below.\nBased on the calculated facility total NOx emission rate, determine the minimum stack parameter requirements for engines and heaters from Table 1: Engines (page 17) of the GCP O&G and enter the minimum parameters from Table 1 (page 17) of the GCP O&G in the bottom row of the table below.\nEnter the stack parameters from each engine and heater in the blank rows of the table below.  Add rows as necessary.\nTable B: Engine/Generator/Heater/Reboiler Stack Parameter Verification:\nDo all engines and heaters comply with the minimum stack parameters from Table 1 (page 17) of the GCP O&G?\n\u0013 FORMCHECKBOX \u0014\u0015   Yes. Skip step 5 below.\n\u0013 FORMCHECKBOX \u0014\u0015 ","cbCaimwo5IQQAI9o","https://ap.wps.com/l/cbCaimwo5IQQAI9o","docx",250672,22,"English","# Section 2 - Tables\n# Section 3 - Registration Summary\n## Specify Facility Type\n## Registration Summary and Facility Description\n## Routine Operations and Equipment Fate\n## Emissions Accounting for SSM and Malfunctions\n## Allowable Operations\n## Verification of Compliance with Stack Parameter Requirements\n### Engines\n### Turbines\n### Flares","[{\"question\":\"What information must be provided in the Registration Summary?\",\"answer\":\"The Registration Summary must include a brief description of the facility and its process, and if the facility is being modified, the proposed changes.\"},{\"question\":\"How should SSM and malfunction emissions be handled in this registration?\",\"answer\":\"The registration must provide an overview of how SSM emissions and malfunction emissions are accounted for, keep SSM and malfunction separate in the allowable emissions table, and note that the permit does not authorize combining them as a single 10 TPY VOC quantity.\"},{\"question\":\"What does stack parameter verification require for different equipment types?\",\"answer\":\"For each selected equipment type, the form requires calculating the applicable NOx or SO2 rates, determining minimum stack parameters or heights from the referenced tables, and completing the verification tables to show whether minimum stack parameters are met; if not met, detailed explanations and calculations are required.\"}]","GCP Registration Form - Section 3 Registration Summary | DOCX",8]