[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-199833-105":53,"doc-detail-199833-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","fy27-capital-budget","FY27 Capital Budget","","FY27 Capital Budget document outlines outstanding and proposed capital projects with itemized locations, costs, and implementation notes. It includes an acoustical theater curtain project tied to original configuration and sound quality improvements, a capital needs assessment study funded to evaluate building requirements, and a proposed leasehold improvements lighting project. The FY27 proposal specifies reconfiguring rooms 132, 134, 136, and 203 to create space for the Theater Department and improve the Music classroom, including demolition, electrical, flooring, painting, and furnishings.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/fy27-capital-budget/199833/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/fy27-capital-budget/199833.png","ImageObject",442,249,{"name":88,"@type":89},"Skyler","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-11","2026-09-04",true,{"@type":98,"interactionType":99,"userInteractionCount":47},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What projects are listed under the FY27 Capital Budget document?","Question",{"text":108,"@type":109},"The document lists outstanding projects and FY27 proposed capital needs, including an acoustical theater curtain, a capital needs assessment study, and leasehold improvements such as lighting and room reconfiguration.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What is the purpose of reconfiguring rooms 132, 134, 136, and 203 in FY27?",{"text":113,"@type":109},"The reconfiguration is meant to create space for the Theater Department and improve the Music classroom, with related demolition, electrical work, flooring, painting, and furnishings included.",{"name":115,"@type":106,"acceptedAnswer":116},"Which FY27 item is associated with lighting and how is it described?",{"text":117,"@type":109},"The leasehold improvements section includes a Lighting Project with a listed cost, contributing to the overall total proposed capital projects for FY27.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},199833,1788507144,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":135,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":125,"read_time":4},2336464648746,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","PVPA Capital Budget (updated 3‐4‐26)  \nOutstanding:  \nFY20, FY24 & FY26  \nLocation  Item   Cost  Comments  \nTheater Accoustical Theater Curtains for Side Wall 18,850 Part of original configuration ‐ increased sound quality & sound proofing  \nCapital Needs Assessment w/FOPVPA  30,000  Study to evluate building needs/construction  \n48,850  \n (18,850)  Accoustical Theater Curtain  \n30,000  \nLeashold Improvements  \nLighting Project  112,000   \n 142,000 Total Projects Outstanding  \nCapital Budget ‐ FY27 Proposed 3‐3‐26  \nLeashold Improvements    \nReconfiguring of rooms 132, 134, 136 & 203  120,000  Creates space for the Theater Deparment and improves Music classroom  \n(includes all demolition, electrical, floring, paint and furnishings)","cbCaiukmYM6KFfEx","https://ap.wps.com/l/cbCaiukmYM6KFfEx","pdf",100677,10,"English","# FY27 Proposed Capital Budget\n## Outstanding Projects\n## FY27 Proposed Leasehold Improvements\n### Reconfiguring Rooms 132, 134, 136, 203","[{\"question\":\"What projects are listed under the FY27 Capital Budget document?\",\"answer\":\"The document lists outstanding projects and FY27 proposed capital needs, including an acoustical theater curtain, a capital needs assessment study, and leasehold improvements such as lighting and room reconfiguration.\"},{\"question\":\"What is the purpose of reconfiguring rooms 132, 134, 136, and 203 in FY27?\",\"answer\":\"The reconfiguration is meant to create space for the Theater Department and improve the Music classroom, with related demolition, electrical work, flooring, painting, and furnishings included.\"},{\"question\":\"Which FY27 item is associated with lighting and how is it described?\",\"answer\":\"The leasehold improvements section includes a Lighting Project with a listed cost, contributing to the overall total proposed capital projects for FY27.\"}]","FY27 Capital Budget | PDF"]