[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-164477-105":53,"doc-detail-164477-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","full-proposal-template-for-iap-5g-for-l-art-demonstration-project-introduction","Full Proposal Template for IAP-5G for L’ ART Demonstration Project - Introduction","","Full Proposal Template for IAP-5G for L’ART Demonstration Projects to support tenderers in preparing a comprehensive response to the 5G for L’ART Agency invitation for a demonstration project. The template assumes the Outline Proposal has been accepted and instructs tenderers to reuse provided elements while expanding as needed. It defines how suggested, mandatory, and guidance text should be treated, emphasizes keeping the table of contents unchanged, and limits the completed proposal length to 75 pages excluding annexes.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/full-proposal-template-for-iap-5g-for-l-art-demonstration-project-introduction/164477/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/full-proposal-template-for-iap-5g-for-l-art-demonstration-project-introduction/164477.png","ImageObject",442,249,{"name":88,"@type":89},"Seraphina","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-19","2026-08-31",true,{"@type":98,"interactionType":99,"userInteractionCount":73},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of this Full Proposal Template for IAP-5G for L’ART Demonstration Projects?","Question",{"text":108,"@type":109},"It helps the tenderer prepare a comprehensive Full Proposal in response to the 5G for L’ART Agency invitation for a demonstration project, following the required structure and guidance.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"When can the Full Proposal preparation start according to the template?",{"text":113,"@type":109},"Preparation can start only after ESA confirms that the corresponding Outline Proposal has been accepted; this template therefore assumes the Full Proposal will reuse and possibly expand information from the Outline Proposal.",{"name":115,"@type":106,"acceptedAnswer":116},"What rules apply to using the template and changing its structure?",{"text":117,"@type":109},"Use of the Full Proposal Template is mandatory, and the tenderer must not change the template structure, including keeping the table of contents unchanged.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},164477,1788153878,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":73,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":125,"read_time":25},962075114101,"https://ap-avatar.wpscdn.com/avatar/e000253a75eb197efd?x-image-process=image/resize,m_fixed,w_180,h_180&k=1780044092746381165","\u0013 docproperty \"Title\" \u0014Full Proposal Template for ARTES IAP-5G for L'ART Demonstration Projects\u0015\n\u000f\nINTRODUCTION\nThis Full Proposal Template is a tool to help the tenderer to prepare a comprehensive Full Proposal responding to the 5G for L’ ART AO for a Demonstration Project.\nPlease note that, in consideration to the fact that the preparation of the Full Proposal can be started only upon confirmation by ESA that the corresponding Outline Proposal has been accepted, for the purpose of this template it is assumed that several parts of the Full Proposal will be based on information, possibly expanded whenever required, that have been already provided in the Outline Proposal.\nConcerning the use of this template, please note the following styles and the related instructions:\nMaterial presented in this plain style is either suggested content for a Full Proposal, or describes the content to be inserted in the corresponding paragraph, as relevant. This is intended to be an example of a response to the related Agency requirements, which the Tenderer needs to properly complement by activity-specific information. The suggested material may be adopted as is, or modified at the Tenderer’s discretion. It remains the responsibility of the Tenderer to ensure that all of the Agency’s requirements of the present Call for Proposals are properly addressed.\nThis style is used to identify information that must be modified and/or completed by the Tenderer for the proposed activity. This supplementary information shall presented in plain typeface (i.e. not red) in the final version of the Full Proposal.\nThis style is used for explanatory notes and guidance to help you to develop the Full Proposal content (e.g. to indicate a selection between mutually-exclusive options). This information should be removed from the final version of the Full Proposal.\nParts with the paragraph title highlighted in green in this template shall correspond to the relevant sections provided in the Outline Proposal to be repeated “as is” in the full proposal for sake of completeness\nUse of this Full Proposal Template is mandatory. The Tenderer shall not change the structure of this Full Proposal Template (i.e. the table of contents must remain unchanged).\nPlease note that the Full Proposal is the only document that will be considered by the ESA Tender Evaluation Board, which will not have access to the Outline Proposal. Therefore, the Full Proposal shall be considered as a full self-contained document, and the contributions coming from the Outline Proposal shall be explicitly appearing in the Full Proposal.\nThe length of the completed Full Proposal without Annexes shall not exceed 75 pages (without changing font size or page margins).\nSome Participating State Delegations may require to access the full proposal to grant their Authorisation of Funding (AoF). Please timely coordinate with the relevant delegation(s) about the applicable process.\nPlease use this page as the cover page of the Full Proposal and remove the previous three pages (Template Title page and Introduction)\nProject Name\nFull Proposal for IAP-5G for L’ ART Demonstration Project\nDate: ……\nReference: ……\nESA Template Ref 1.0 issued \u0013 DOCPROPERTY  \"Issue Date\" \\@ \"dd/MM/yyyy\" \u001405/11/2019\u0015\n\u000f\n\u0013 TOC \\o \"1-3\" \\h \\z \\u \u0014\u0013 HYPERLINK \\l \"_Toc23954107\" \u0014INTRODUCTION\t\u0013 PAGEREF _Toc23954107 \\h \u00141\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc23954108\" \u0014A.\tCOVER LETTER\t\u0013 PAGEREF _Toc23954108 \\h \u00143\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc23954109\" \u0014B.\tPROJECT SUMMARY AND RATIONALE\t\u0013 PAGEREF _Toc23954109 \\h \u00143\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc23954110\" \u0014B.1\tBackground Information\t\u0013 PAGEREF _Toc23954110 \\h \u00143\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc23954111\" \u0014B.2\tService Description and Selling Point(s)\t\u0013 PAGEREF _Toc23954111 \\h \u00143\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc23954112\" \u0014B.3\t5G and Space Asset(s) and Rationale\t\u0013 PAGEREF _Toc23954112 \\h \u00143\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc23954113\" \u0014C.\tBusiness Plan\t\u0013 PAGEREF _Toc23954113 \\h \u00144\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc23954114\" \u0014C.1\tCustomer Segments\t\u0013 PAGEREF _Toc23954114 \\h \u00144\u0015\u0015\n\u0013 HYP","cbCaimGEJfcFYsC3","https://ap.wps.com/l/cbCaimGEJfcFYsC3","docx",661490,44,"English","# Introduction\n## Template purpose and assumptions\n## Styling instructions for inserted content\n## Mandatory use and structure requirements\n## Submission considerations and length limit\n## Cover page instructions\n# Table of contents overview\n## A. Cover letter\n## B. Project summary and rationale\n## C. Business plan\n## D. Technical proposal\n## E. Management and administrative proposal","[{\"question\":\"What is the purpose of this Full Proposal Template for IAP-5G for L’ART Demonstration Projects?\",\"answer\":\"It helps the tenderer prepare a comprehensive Full Proposal in response to the 5G for L’ART Agency invitation for a demonstration project, following the required structure and guidance.\"},{\"question\":\"When can the Full Proposal preparation start according to the template?\",\"answer\":\"Preparation can start only after ESA confirms that the corresponding Outline Proposal has been accepted; this template therefore assumes the Full Proposal will reuse and possibly expand information from the Outline Proposal.\"},{\"question\":\"What rules apply to using the template and changing its structure?\",\"answer\":\"Use of the Full Proposal Template is mandatory, and the tenderer must not change the template structure, including keeping the table of contents unchanged.\"}]","Full Proposal Template for IAP-5G for L’ ART Demonstration Project - Introduction | DOCX"]