[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-199781-105":53,"doc-detail-199781-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","form-no-23-article-19-site-notice-for-planning-permission","Form No. 23 - Article 19 - Site Notice for Planning Permission","","Form No. 23 Article 19 provides structured instructions and required fields for issuing a Site Notice relating to an application for planning permission. It sets out allowable permission types (permission, retention, outline, and permission consequent on outline), the development description, relevant RED III/EU directive references, and how statutory periods for submissions or observations are calculated. It also includes office address and opening hours, fees, signature and erection date lines, and obligations to remove the notice after the planning authority’s decision.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":41,"@type":70,"position":76},"https://docshare.wps.com/template/letters/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/form-no-23-article-19-site-notice-for-planning-permission/199781/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/form-no-23-article-19-site-notice-for-planning-permission/199781.png","ImageObject",442,249,{"name":88,"@type":89},"Valentina","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-06","2026-09-04",true,{"@type":98,"interactionType":99,"userInteractionCount":76},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What permission types can be selected on this Site Notice form?","Question",{"text":108,"@type":109},"The notice allows Permission, Retention Permission, Outline Permission, and Permission consequent on the grant of outline permission. If the latter is sought, the related outline permission reference number should be included.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What information must be inscribed regarding the applicant and the site?",{"text":113,"@type":109},"The Planning Authority name, the applicant’s name (not the agent), and the location/townland/postal address of the land or structure must be recorded. A brief description of the development, including relevant RED III development type details, must also be included.",{"name":115,"@type":106,"acceptedAnswer":116},"When can submissions or observations be made, and what is the fee?",{"text":117,"@type":109},"A written submission or observation may be made to the planning authority on payment of the prescribed fee (€20) within either 5 weeks, or 2 weeks for specified small-scale solar or small-scale non-ground source heat pump cases, starting from receipt of the application.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},199781,1790508820,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":40,"category_name":41,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":76,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":76,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":9},13056703020460,"https://ap-avatar.wpscdn.com/avatar/be000253dac470eee5d?_k=1778207105932848923","Form No. 23                                                                                                                                                                                                                                     Article 19\nI/We\nIntend to apply for:\nPermission\nOutline Permission\nRetention Permission (not REDIII applicable)                        Permission consequent on\nthe grant of outline permission (Register    Reference No.: \t)\nFor development at this site address:\nThe development will consist / consists of:\nThis development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.\nThe Planning Application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority during its public opening hours.\nOffice: Fingal County Council, Fingal County Hall, Main Street, Swords, Fingal, Co. Dublin\nOpening Hours 9.30 - 16.30 Monday – Friday. (Cash Office opening hours are 9.30 to 15.30 p.m.)\nA submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee, €20, within the period of—\n[    ] 5 weeks, or\n[    ] 2 weeks, in the case of a planning application for small-scale solar energy equipment development or                                        development that is the installation of a small-scale non-ground source heat pump,\nbeginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission.\nSignature:\n(If signed by an agent, the agent’s address must be provided below.)\nDate of erection of Site Notice: _____________________________________\nNotice to Applicant: Please ensure that your application is submitted within two weeks from the date the Site Notice is erected.\nTHIS SITE NOTICE SHALL BE REMOVED AFTER NOTIFICATION OF PLANNING AUTHORITY DECISION\nNote to Third Parties: \u000bPlanning applications received by Fingal County Council are available for public inspection online.\nTo view applications or make a submission/objection, please visit the Planning Portal at \u0013 HYPERLINK \"http://www.fingal.ie/planning\" \u0014www.fingal.ie/planning\u0015.\nAll submissions and objections are published on the Council’s website in accordance with statutory requirements.\nDirections for completing this notice\nThe name of the Planning Authority to which the planning application will be made should be inscribed.\nThe name of the applicant for permission (and not his or her agent) should be inscribed.\nThe types of permission that may be sought are – Permission, Retention Permission, Outline Permission, and Permission Consequent on the Grant of Outline Permission. If Permission Consequent on the Grant of Outline Permission is being sought, the reference number on the planning register of the relevant outline permission should be included. (Tick box as appropriate on sample notice).\nThe location, townland or postal address of the land or structure to which the application relates should be inscribed.\nThe present tense should be used where Retention permission is being sought.\nA brief description of the nature and extent of the development should be inscribed, the description shall include-\nto which type of RED III development the application relates (e.g. co-located energy storage; relevant solar energy development; renewable energy development; repowering development; small-scale non-ground source heat pump; small-scale solar energy equipmen","cbCaiaCtXVgi37di","https://ap.wps.com/l/cbCaiaCtXVgi37di","docx",132501,"English","# Form No. 23\n## Article 19\n## Intended Application Types and Development Description\n## Submission Periods, Fees, and Statutory References\n## Planning Authority Details and Opening Hours\n## Signature, Erection Date, and Applicant Instructions\n## Removal and Third-Party Notice Requirements\n## Directions for Completing the Site Notice","[{\"question\":\"What permission types can be selected on this Site Notice form?\",\"answer\":\"The notice allows Permission, Retention Permission, Outline Permission, and Permission consequent on the grant of outline permission. If the latter is sought, the related outline permission reference number should be included.\"},{\"question\":\"What information must be inscribed regarding the applicant and the site?\",\"answer\":\"The Planning Authority name, the applicant’s name (not the agent), and the location/townland/postal address of the land or structure must be recorded. A brief description of the development, including relevant RED III development type details, must also be included.\"},{\"question\":\"When can submissions or observations be made, and what is the fee?\",\"answer\":\"A written submission or observation may be made to the planning authority on payment of the prescribed fee (€20) within either 5 weeks, or 2 weeks for specified small-scale solar or small-scale non-ground source heat pump cases, starting from receipt of the application.\"}]","Form No. 23 - Article 19 - Site Notice for Planning Permission | DOCX",1788507009]