[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-166008-en":3,"doc-seo-166008-105":30,"detail-sidebar-cat-1-en-105":90},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":4,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":15,"update_tm":28,"read_time":29},166008,16904993612988,"Olivia Brown","https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd",1,18,"Letters","Flood Emergency Response Plan (FERP)","Flood Emergency Response Plan (FERP) template for a district to define actions before, during, and after a pending flood event. The plan reduces physical loss to buildings, vehicles, machinery, and stock/supplies to enable faster operational recovery once floodwaters recede. It includes district facility flood exposure overview, 100-year/500-year flood definitions, monitoring and alert responsibilities, disaster recovery phone tree triggers, and detailed before/during precautions plus a 24–48 hour salvage and business resumption workflow.","Flood Emergency Response Plan (FERP)\nDistrict Name\nAddress\nAs of Date\n**This is a template to be used for your District’s needs. You may add and remove as you see fit.**\nPerson in charge of FERP:  Name/Title\nFERP Team Members:   Name/Title\nName/Title\nName/Title\nIntroduction:    This Flood Emergency Response Plan (FERP) has been established to clearly define actions that should be taken in the event of a pending flood event to our facilities. The plan is designed to proactively outline actions to be taken to reduce physical loss to buildings, vehicles, machinery and equipment and stock/supplies in order that we may resume operations as quickly as possible after the flood event is over. This plan is to be updated every year during the month of Month.\nOverview and flood threat:    The District’s facilities are exposed to flooding from Name of Rivers/Lakes/Creeks in Name of City/Town. The following is a list of the District’s buildings and their respective finished floor elevations. There are also columns to note if the building is in the 100-Year and 500-Year flood elevations. The 100-Year flood is the definition of a flood that statistically has a 1 in 100 or 1% chance of occurring in a given year. 500-Year has a 1 in 500 or .2% chance of occurring in a given year. **Floodplain levels can be located at \u0013 HYPERLINK \"http://www.fmglobal.com/research-and-resources/global-flood-map/flood-map\" \u0014fmglobal.com/research-and-resources/global-flood-map/flood-map\u0015.\nMonitoring Potential Flood Event:     The _______ Manager will advise the FERP leader when flood conditions are possible. When potential flooding goes beyond a flood alert stage, the FERP leader will assign personnel the responsibility to visually monitor the Rivers/Lakes/Creeks elevations each hour and record and report the findings to the FERP leader. The FERP leader will be responsible for implementing various components of the FERP based on river elevations.\nThe District’s facility and buildings are susceptible to flooding in the event of an extended period of rain.  When a rainfall event of more than 2 inches per hour of rain for a sustained period of two hours occurs, the FERP leader or designate (Shift Supervisor during off peak hours) shall initiate the District’s Disaster Recovery phone tree. The listing of essential employees is as follows:\nName\t\t\t\tTitle\t\t\t000-000-0000(H), 000-000-0000(C)\nName\t\t\t\tTitle\t\t\t000-000-0000(H), 000-000-0000(C)\nName\t\t\t\tTitle\t\t\t000-000-0000(H), 000-000-0000(C)\nName\t\t\t\tTitle\t\t\t000-000-0000(H), 000-000-0000(C)\nName\t\t\t\tTitle\t\t\t000-000-0000(H), 000-000-0000(C)\nBefore/during the rain event\nBuildings:    The following precautions will be taken by essential staff to ensure safety of the building. (Add rows as needed)**\nHeavy Equipment and Vehicles:    Tractors, Backhoes, Excavators and vehicles shall be moved to an area or height deemed to be outside of the 100-Year floodplain. The area should be secured in a way to minimize damage due to vandalism. (Add rows as needed)**\nTo give an example, before Hurricane Harvey, Houston Metro relocated a majority of their buses to the highway interchanges that were well above the floodplain. They were able to move the buses when the flood water receded.\nEquipment: All equipment (electrical; motors, drives, batteries, etc.) located below grade or in the floodplain needs to be secured, removed or protected in a manner that would prevent damage from water intrusion. (Add rows as needed)**\nAfter the flood:\nSalvage and Business Resumption Plan (24-48 hours)\nRemoval of remaining floodwater, mud and debris in and around any buildings by using wash down hoses, brooms, squeegees, mops, sump pumps and clean-up supplies.\nAnalyze all salvageable materials and equipment, begin discard/removal of all non-salvageable materials/equipment.\nContact the insurance company.\nContact a debris removal company.\nPhotograph or videotape all damage.\nThis will be useful for insurance claim submissions\nAccount for all damage related costs.\nKeep","cbCaimVoeD78CDwD","https://ap.wps.com/l/cbCaimVoeD78CDwD","docx",23201,5,"English","en",105,"# Introduction\n# Overview and flood threat\n# Monitoring potential flood event\n# Before/during the rain event\n## Buildings\n## Heavy equipment and vehicles\n## Equipment\n# After the flood","[{\"question\":\"When does the district initiate the disaster recovery phone tree?\",\"answer\":\"When rainfall exceeds 2 inches per hour for a sustained period of two hours, the FERP leader (or designate/Shift Supervisor off peak) initiates the district’s Disaster Recovery phone tree.\"},{\"question\":\"How is flooding risk defined for the plan’s facilities?\",\"answer\":\"The plan lists each building’s finished floor elevation and notes whether facilities fall within the 100-Year and 500-Year flood elevations, defined statistically as 1% chance (100-Year) and 0.2% chance (500-Year) in a given year.\"},{\"question\":\"What key actions are included in the 24–48 hour salvage and business resumption plan?\",\"answer\":\"Actions include removing remaining floodwater and debris, analyzing salvageable materials, discarding non-salvageable items, contacting insurance and debris removal, photographing damage, maintaining detailed cost records and receipts, separating damaged from undamaged property, and performing cleanup and safety walkthroughs.\"}]","Flood Emergency Response Plan (FERP) | DOCX",1788180941,2,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":14,"keywords":34,"description":15,"schema_data":35,"social_meta":85,"head_meta":87,"extra_data":89,"updated_unix":28},"flood-emergency-response-plan-ferp","",{"@graph":36,"@context":84},[37,53,67],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,47,50],{"item":41,"name":42,"@type":43,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":29},"https://docshare.wps.com/template/","Template",{"item":48,"name":13,"@type":43,"position":49},"https://docshare.wps.com/template/letters/",3,{"item":51,"name":14,"@type":43,"position":52},"https://docshare.wps.com/template/flood-emergency-response-plan-ferp/166008/",4,{"url":51,"name":14,"@type":54,"author":55,"headline":14,"publisher":57,"fileFormat":60,"inLanguage":23,"description":15,"dateModified":61,"datePublished":61,"encodingFormat":60,"isAccessibleForFree":62,"interactionStatistic":63},"DigitalDocument",{"name":9,"@type":56},"Person",{"url":41,"name":58,"@type":59},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-08-31",true,{"@type":64,"interactionType":65,"userInteractionCount":4},"InteractionCounter",{"@type":66},"ViewAction",{"@type":68,"mainEntity":69},"FAQPage",[70,76,80],{"name":71,"@type":72,"acceptedAnswer":73},"When does the district initiate the disaster recovery phone tree?","Question",{"text":74,"@type":75},"When rainfall exceeds 2 inches per hour for a sustained period of two hours, the FERP leader (or designate/Shift Supervisor off peak) initiates the district’s Disaster Recovery phone tree.","Answer",{"name":77,"@type":72,"acceptedAnswer":78},"How is flooding risk defined for the plan’s facilities?",{"text":79,"@type":75},"The plan lists each building’s finished floor elevation and notes whether facilities fall within the 100-Year and 500-Year flood elevations, defined statistically as 1% chance (100-Year) and 0.2% chance (500-Year) in a given year.",{"name":81,"@type":72,"acceptedAnswer":82},"What key actions are included in the 24–48 hour salvage and business resumption plan?",{"text":83,"@type":75},"Actions include removing remaining floodwater and debris, analyzing salvageable materials, discarding non-salvageable items, contacting insurance and debris removal, photographing damage, maintaining detailed cost records and receipts, separating damaged from undamaged property, and performing cleanup and safety walkthroughs.","https://schema.org",{"og:url":51,"og:type":86,"og:title":14,"og:site_name":58,"og:description":15},"article",{"robots":88,"canonical":51},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":91},[92,97,102,107,112,117,122,125,129],{"id":93,"doc_module":11,"doc_module_name":46,"category_name":94,"show_sort_weight":95,"slug":96},11,"Presentations",90,"presentations",{"id":98,"doc_module":11,"doc_module_name":46,"category_name":99,"show_sort_weight":100,"slug":101},12,"Resumes",80,"resumes",{"id":103,"doc_module":11,"doc_module_name":46,"category_name":104,"show_sort_weight":105,"slug":106},14,"Invoices",70,"invoices",{"id":108,"doc_module":11,"doc_module_name":46,"category_name":109,"show_sort_weight":110,"slug":111},15,"Posters",60,"posters",{"id":113,"doc_module":11,"doc_module_name":46,"category_name":114,"show_sort_weight":115,"slug":116},16,"Social Media",50,"social-media",{"id":118,"doc_module":11,"doc_module_name":46,"category_name":119,"show_sort_weight":120,"slug":121},17,"Forms",40,"forms",{"id":12,"doc_module":11,"doc_module_name":46,"category_name":13,"show_sort_weight":123,"slug":124},30,"letters",{"id":126,"doc_module":11,"doc_module_name":46,"category_name":127,"show_sort_weight":21,"slug":128},21,"Paper Templates","papers-templates",{"id":130,"doc_module":11,"doc_module_name":46,"category_name":131,"show_sort_weight":4,"slug":132},158,"General","general-158"]