[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-239986-105":53,"doc-detail-239986-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","final-scope-certification-form-template","Final Scope Certification - Form template","","Final Scope Certification form template for documenting project scope, schedule, budget, and approvals across multiple organizational roles. It collects project identifiers and routing fields, records concurrence and approval sections, and captures milestones and detailed bid-item and non-let estimate links. The template also provides structured certification areas for safety, bridges/structures, pavement design, environmental risk scoping, Native American lands determinations, and resiliency scope, plus risk and performance management inputs including program effectiveness measures.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/final-scope-certification-form-template/239986/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/final-scope-certification-form-template/239986.png","ImageObject",442,249,{"name":88,"@type":89},"Violet","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-11-02","2026-09-11",true,{"@type":98,"interactionType":99,"userInteractionCount":8},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What information does the Final Scope Certification form capture for a project?","Question",{"text":108,"@type":109},"It captures project identifiers and scope details, purpose and need, summary of scope of work, milestones, schedule and budget links, and multiple certification sections including safety, bridges/structures, pavement design, and environmental items.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"How are milestone schedule items organized in the template?",{"text":113,"@type":109},"The form provides a Milestone Schedule section listing key completion and certification milestones (e.g., LC00, proposed LC11, LC12, LC15), and prompts for related plan and real estate events plus detailed schedule link entries.",{"name":115,"@type":106,"acceptedAnswer":116},"Which certification areas are included in the template?",{"text":117,"@type":109},"Safety Certification (including SCD date and SSOP questions), Bridge or Structure Certification (including BOSCD and treatment recommendations), Pavement Design (report date and recommendations), Environmental (RBEST/draft dates, NALI determination, resiliency scope certification), and Risk and Performance Management inputs.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},239986,1790144570,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":8,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":79,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":73},4398048950312,"https://ap-avatar.wpscdn.com/avatar/400002538284de19e3c?_k=1778320343897328908","Final Scope Certification  \nPDS fills out form unless otherwise noted  \nDate: Phase 3 Meeting Date  \nProject I. D. (design/construction): Enter text.  \nRoute: Enter text.  \nTitle/Limits: Enter text.  \nBridge \\# (if applicable): Enter text.  \nCounty: Enter text.  \nImprovement Concept Code: From FIIPS construction ID or CDR  \nDesign Criteria: From FIIPS construction ID  \nHaving considered the criteria and documentation attached we concur and approve the Final Scope.  \nConcurrence:  \n\n| Region Project Development Chief or delegate: | Leave blank |\n| --- | --- |\n|  |  |\n| Region Technical Services Chief or delegate: | Leave blank |\n|  |  |\n| Region Operations Chief or delegate: | Leave blank |\n|  |  |\n| Bureau of Project Development – Design Standards and Oversight Chief or delegate: | Leave blank |\n\nApproval:  \nRegion Programming/Planning Chief Date  \nFinal Scope Certification location (enter path and link): Enter text.  \nProject Information  \nScope  \nPurpose and need:  \nRefer to project Scoping Agenda environmental appendix and guidance from Regional Environmental Coordinator  \nSummary of scope of work:  \n(For Perpetuation projects, list improvements beyond pavement that are included with this project. For Rehabilitation projects, list improvements beyond pavement and SCD identified mitigations that are included with this project):  \nRefer to Scoping Agenda and other improvements to be included that were added after Phase 2 meeting.  \nSchedule & Budget  \nMilestone Schedule (milestones shown in FDM 3-1 attachment 1.1)  \nProject Initiation Complete (LC00) Preliminary Scope Complete  \nFinal Scope Certification (proposed LC11) Final Resourcing/Start Final Delivery (LC12) Design Study Report (LC15)  \nPlat Complete/Real Estate Start  \nDT1078 Plan Submittal  \nReal Estate Complete/Utility Relocation Begin Early PS&E  \nPS&E  \nProject Let (Programmed)  \nProject Award (based on Programmed)  \nDate CDR Created Phase 2 meeting date  \nPhase 3 meeting date  \nSame as Phase 3 meeting date in most cases PDS PM updates between Phase 2 & 3 Check w/ Real Estate  \nCheck w/ Utilities  \nCheck w/ Real Estate Check in FIIPS or PMP  \nCheck in FIIPS or PMP  \nCheck in FIIPS or PMP  \nAdd 6 weeks to project LET date (from FDM)  \nDetail schedule (enter link):  \nEnter text.  \nMajor Bid Item estimate (enter link):  \nEnter text.  \nNon-Let schedule and estimates:  \nRE $ Enter text. Schedule date Enter date.  \nRR $ Enter text. Schedule date Enter date.  \nUTL $ Enter text. Schedule date Enter date.  \nMISC$ Enter text. Schedule date Enter date.  \nCertifications  \nSafety Certification  \nSafety Certification Document (SCD) date: Enter date.  \nHyperlink to location of SCD: Enter text.  \nIs there a Safety Site of Promise (SSOP) within the project limits? ☐Yes ☐No From FIIPS construction ID  \nRegardless of SSOP, were any safety mitigations approved and included in the project scope?☐Yes ☐No From FIIPS construction ID  \nBrief summary of recommended geometric improvements or countermeasures: Enter text.  \nBridge or Structure Certification  \n☐ No bridges or ancillary structures are located within project limits.  \n--OR--  \n☐ Bridges or ancillary structures within projects limits have been reviewed.  \n☐ There is no work needed on following bridges or ancillary structures within the project limits: Enter text.  \n☐ Bridge or ancillary structures work is being done under a separate project at the following locations: Enter text.  \n☐ Bridge or Structure Certification Document (BOSCD) was competed for the following locations: Enter text.  \nBOSCD date: Enter date.  \nHyperlink to location of BOSCD: Enter text.  \nBrief summary of treatment recommendations: Enter text.  \nPavement Design  \nPavement Design Report date: Enter date.  \nHyperlink to location of Pavement Design Report: Enter text.  \nBrief summary of treatment recommendations: Enter text.  \nEnvironmental  \nRisk Based Environmental Scoping Template (RBEST) or draft environmental document date: Enter date.  \nHyperlink to locatio","cbCaiiJw4VW5SJKG","https://ap.wps.com/l/cbCaiiJw4VW5SJKG","pdf",89517,"English","# Project Information\n## Scope\n## Purpose and need\n## Summary of scope of work\n# Schedule & Budget\n## Milestone Schedule\n## Detail schedule\n## Major Bid Item estimate\n## Non-Let schedule and estimates\n# Certifications\n## Safety Certification\n## Bridge or Structure Certification\n## Pavement Design\n## Environmental\n## Risk and Performance Management\n## Scope\n## Schedule\n## Budget","[{\"question\":\"What information does the Final Scope Certification form capture for a project?\",\"answer\":\"It captures project identifiers and scope details, purpose and need, summary of scope of work, milestones, schedule and budget links, and multiple certification sections including safety, bridges/structures, pavement design, and environmental items.\"},{\"question\":\"How are milestone schedule items organized in the template?\",\"answer\":\"The form provides a Milestone Schedule section listing key completion and certification milestones (e.g., LC00, proposed LC11, LC12, LC15), and prompts for related plan and real estate events plus detailed schedule link entries.\"},{\"question\":\"Which certification areas are included in the template?\",\"answer\":\"Safety Certification (including SCD date and SSOP questions), Bridge or Structure Certification (including BOSCD and treatment recommendations), Pavement Design (report date and recommendations), Environmental (RBEST/draft dates, NALI determination, resiliency scope certification), and Risk and Performance Management inputs.\"}]","Final Scope Certification - Form template | PDF",1789155750]