[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-173255-en":3,"doc-seo-173255-105":29,"detail-sidebar-cat-1-en-105":89},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":4,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":15,"update_tm":28,"read_time":11},173255,687197207919,"Theodora","https://ap-avatar.wpscdn.com/avatar/a000253d6f5f7c60be?x-image-process=image/resize,m_fixed,w_180,h_180&k=1779446848396160552",1,11,"Presentations","Final Report Template - Project Final Reporting Requirements","Final report template defining required project reporting content and structure. Includes scope confirmation with QA/QC, a project summary table covering estimated costs and energy savings, and narrative sections for executive summary, project description, baselining/benchmarking, results, and recommendations. Specifies energy conservation measure write-ups with cost and rationale, and a comprehensive energy savings and financial analysis (payback, ROI, NPV, IRR), excluding incentive amounts. Adds optional requirements for retro-commissioning and detailed RCx documentation plus appendices with calculations, schedules, and energy model inputs and results when applicable.","Final Report Template\nThis template is provided as a guide and is not required. However, all information here must be included in some form in the final report.\nGeneral - Confirm that the tasks in the scope of work are all included within the report and/or discuss any discrepancies. Conduct QA/QC to ensure costs and savings are reported consistently throughout the report. This will reduce the amount of time spent in Technical Review.\nProject Summary Table - A neatly formatted table listing the estimated costs, energy savings (kWh, Steam, Gas, peak Summer kW), energy cost savings, and financial performance indicators as listed in the Scope of Work. A summary table is required for all projects. For a Project Summary Table, please visit \u0013 HYPERLINK \"https://www.nyserda.ny.gov/All-Programs/Programs/Commercial-Tenant-Program/Submit-a-Project\" \u0014https://www.nyserda.ny.gov/All-Programs/Programs/Commercial-Tenant-Program/Submit-a-Project\u0015 .\nExecutive Summary - Concisely summarize the Project’s intent, findings, recommendations, and the\neconomics of the recommendations in narrative format.  Include explanations for long payback recommendations.\nProject Description - Include a description of the building and project site, project approach and tasks performed as defined in the project scope. If any deviations from the scope of work occurred during the project, please provide an explanation for those changes.\nBaselining/Benchmarking - If available, provide existing utility analysis for electricity, steam, gas, etc. for systems in the tenant space, as applicable. Provide estimates for energy consumption for various end use (lighting, cooling, heating, etc.)\nProject Results/Recommendations – Describe project findings and recommendations.\nEnergy Conservation Measure descriptions: provide detailed descriptions of the recommended energy conservation measures. Provide a rationale for any measures that are recommended for further study or not recommended, as well as any measures that are recommended despite long payback periods.  Provide an estimate of the cost to implement each measure.  Please note that all measures should be vendor neutral. Information on specific products can be provided to customers separately.\nEnergy Savings Analysis: Provide, at minimum, all parameters required for a simple payback analysis, or more if required by the scope of work. For each measure, provide:\nAnnual savings from each ECM (peak load and total savings)\nSimple payback based on cost estimates (without incentives)\nReturn on Investment\nAnnual total savings with all measures implemented.\nEUI after the ECM’s are implemented.\nEnd Use Consumption analysis after ECM’s are implemented\nFinancial analysis\nThe incremental cost estimates for each measure\nThe incremental energy savings above code for each measure, if deemed appropriate.\nThe incremental annual operational cost savings and savings over the lease term\nSimple payback period, return on investment, net present value, and internal rate of return.\nNOTE: Reports should not include incentives amounts in payback calculations. This information can be submitted to the Customer under separate cover.\nFor projects that include energy efficiency retro-commissioning, the report must also include:\nFinal current facilities requirement (CFR) document that includes:\nMajor systems descriptions including HVAC, plumbing and electrical\nMajor systems control strategies including HVAC, plumbing and electrical\nSpace temperature setpoints (heating and cooling)\nSpace temperature setpoints (occupied and unoccupied)\nVentilation requirements\nEquipment operating schedules\nSpace pressurization requirements\nBuilding occupancy schedule\nFiltration requirement\nA description of all existing building systems included in the RCx effort, including but not limited to\nMajor equipment classification, designation, sizing, location, operating scenario, age, condition, and efficiency\nBasic control strategy for each individual system\nDistribution system de","cbCaih5xvWqzO1UY","https://ap.wps.com/l/cbCaih5xvWqzO1UY","docx",718884,3,"English","en",105,"# Project Reporting Structure\n## Executive Summary\n## Project Description\n## Baselining/Benchmarking\n## Project Results/Recommendations\n## Energy Conservation Measures\n## Energy Savings and Financial Analysis\n## Retro-Commissioning Requirements (if applicable)\n## Appendices\n## Energy Modeling (if applicable)","[{\"question\":\"What must be included to meet the template’s reporting requirements?\",\"answer\":\"The report must include all scope-of-work tasks, consistent QA/QC so costs and savings match throughout, and the required narrative sections plus the project summary table and supporting appendices.\"},{\"question\":\"What does the Project Summary Table need to cover?\",\"answer\":\"It must list estimated costs, energy savings by utility and metric (kWh, Steam, Gas, peak Summer kW), energy cost savings, and financial performance indicators as defined in the scope of work.\"},{\"question\":\"How should payback and financial metrics be calculated?\",\"answer\":\"Provide simple payback and ROI based on cost estimates without incentives, and include additional financial outputs such as NPV and IRR where required by the scope. Reports must not include incentive amounts in payback calculations.\"}]","Final Report Template - Project Final Reporting Requirements | DOCX",1788301737,{"code":4,"msg":30,"data":31},"ok",{"site_id":24,"language":23,"slug":32,"title":14,"keywords":33,"description":15,"schema_data":34,"social_meta":84,"head_meta":86,"extra_data":88,"updated_unix":28},"final-report-template-project-final-reporting-requirements","",{"@graph":35,"@context":83},[36,52,66],{"@type":37,"itemListElement":38},"BreadcrumbList",[39,43,47,49],{"item":40,"name":41,"@type":42,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":44,"name":45,"@type":42,"position":46},"https://docshare.wps.com/template/","Template",2,{"item":48,"name":13,"@type":42,"position":21},"https://docshare.wps.com/template/presentations/",{"item":50,"name":14,"@type":42,"position":51},"https://docshare.wps.com/template/final-report-template-project-final-reporting-requirements/173255/",4,{"url":50,"name":14,"@type":53,"author":54,"headline":14,"publisher":56,"fileFormat":59,"inLanguage":23,"description":15,"dateModified":60,"datePublished":60,"encodingFormat":59,"isAccessibleForFree":61,"interactionStatistic":62},"DigitalDocument",{"name":9,"@type":55},"Person",{"url":40,"name":57,"@type":58},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-01",true,{"@type":63,"interactionType":64,"userInteractionCount":4},"InteractionCounter",{"@type":65},"ViewAction",{"@type":67,"mainEntity":68},"FAQPage",[69,75,79],{"name":70,"@type":71,"acceptedAnswer":72},"What must be included to meet the template’s reporting requirements?","Question",{"text":73,"@type":74},"The report must include all scope-of-work tasks, consistent QA/QC so costs and savings match throughout, and the required narrative sections plus the project summary table and supporting appendices.","Answer",{"name":76,"@type":71,"acceptedAnswer":77},"What does the Project Summary Table need to cover?",{"text":78,"@type":74},"It must list estimated costs, energy savings by utility and metric (kWh, Steam, Gas, peak Summer kW), energy cost savings, and financial performance indicators as defined in the scope of work.",{"name":80,"@type":71,"acceptedAnswer":81},"How should payback and financial metrics be calculated?",{"text":82,"@type":74},"Provide simple payback and ROI based on cost estimates without incentives, and include additional financial outputs such as NPV and IRR where required by the scope. Reports must not include incentive amounts in payback calculations.","https://schema.org",{"og:url":50,"og:type":85,"og:title":14,"og:site_name":57,"og:description":15},"article",{"robots":87,"canonical":50},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":90},[91,94,99,104,109,114,119,124,129],{"id":12,"doc_module":11,"doc_module_name":45,"category_name":13,"show_sort_weight":92,"slug":93},90,"presentations",{"id":95,"doc_module":11,"doc_module_name":45,"category_name":96,"show_sort_weight":97,"slug":98},12,"Resumes",80,"resumes",{"id":100,"doc_module":11,"doc_module_name":45,"category_name":101,"show_sort_weight":102,"slug":103},14,"Invoices",70,"invoices",{"id":105,"doc_module":11,"doc_module_name":45,"category_name":106,"show_sort_weight":107,"slug":108},15,"Posters",60,"posters",{"id":110,"doc_module":11,"doc_module_name":45,"category_name":111,"show_sort_weight":112,"slug":113},16,"Social Media",50,"social-media",{"id":115,"doc_module":11,"doc_module_name":45,"category_name":116,"show_sort_weight":117,"slug":118},17,"Forms",40,"forms",{"id":120,"doc_module":11,"doc_module_name":45,"category_name":121,"show_sort_weight":122,"slug":123},18,"Letters",30,"letters",{"id":125,"doc_module":11,"doc_module_name":45,"category_name":126,"show_sort_weight":127,"slug":128},21,"Paper Templates",5,"papers-templates",{"id":130,"doc_module":11,"doc_module_name":45,"category_name":131,"show_sort_weight":4,"slug":132},158,"General","general-158"]