[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-254018-105":53,"doc-detail-254018-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","field-review-report-3-form-31-field-review-report-1","Field Review Report 3 - FORM 3.1 Field Review Report 1","","Field Review Report 3 documents a site visit for the ABC Building Renovation project at 10 Jones Avenue, Toronto. It records general information and detailed work-in-progress observations, including demolition completion, site preparation, topsoil stockpiling, rough grading, and completed excavation for footings. The report notes concrete footings poured along gridline A (grids 1–8) and forming for remaining portions, with crew and reinforcing deliveries. It lists information or action required to expose and verify steel connection details at grid E3–E9.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/field-review-report-3-form-31-field-review-report-1/254018/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/field-review-report-3-form-31-field-review-report-1/254018.png","ImageObject",442,249,{"name":88,"@type":89},"Aurora","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-23","2026-09-13",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",9,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is reviewed in this report?","Question",{"text":109,"@type":110},"The report reviews work in progress with the client, focusing on demolition, site preparation, excavation, and footings construction progress.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What work-in-progress observations are recorded for the project?",{"text":114,"@type":110},"Demolition is complete; topsoil and paved surfaces were removed; rough grading is finished; excavation for footings is complete; concrete footings were poured along gridline A from grids 1 to 8.",{"name":116,"@type":107,"acceptedAnswer":117},"What information or action is required from the contractor?",{"text":118,"@type":110},"The contractor must clear miscellaneous wood to expose the connection of the existing 100 x 100 steel column at grid E3 to E9 so that shop drawing details can be verified.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},254018,1789273099,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":126,"read_time":4},4810365810221,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","Logo or Name of Architectural Practice  \nField Review Report 3  \nProject: ABC Building Renovation  \n10 Jones Avenue, Toronto Contractor: Construction Contracting Ltd.  \nWeather: Sunny, 5º C  \nDate of Visit(s): October 4, 2009  \nProject No.: 08101  \nBuilding Permit No.: 174/09  \nGENERAL  \n1.1 Reviewed work in progress with Client.  \nWORK IN PROGRESS—OBSERVATIONS  \n2.1 Demolition of existing building complete. Sub-contractor to remove stockpiled materials at N. W. corner of site.  \n2.2 Site preparation—Topsoil removed and stockpiled on site. Existing paved surfaces removed. Rough grading complete. Equipment on site—one tractor, vibrator, and compactor.  \n2.3 Excavation for footings complete—see Structural Engineer’s report.  \n2.4 Footings—Concrete footings poured along gridline A from grids 1 to 8. Forming footings for remainder of gridline A. Four workers plus superintendent. Reinforcing steel for footings delivered.  \nINFORMATION OR ACTION REQUIRED  \n3.1 Sketches made of existing 100 x 100 steel column at grid E3 to E9 . Contractor to clear away miscellaneous wood to expose connection in order to verify shop drawing details of steel connection to existing.  \nITEMS TO BE VERIFIED—None.  \nReport by: James Smith Title: Project Architect  \n  (Project Architect)  \n(signature)  \nDistribution by fax: ABC Corporation—Client Representative  \nConstruction Contracting Limited, Project Manager Chief Building Official  \nArchitect File  \nAttachments: Structural Engineer Field Review Report Number 3  \nMethod of transmission:","cbCairNJoWOZ4j3C","https://ap.wps.com/l/cbCairNJoWOZ4j3C","pdf",30341,"English","# Project Details\n## General\n## Weather and Visit Date\n# Work in Progress—Observations\n## Demolition and Site Preparation\n## Excavation and Footings\n# Information or Action Required\n## Steel Column Connection Verification\n# Reporting and Distribution","[{\"question\":\"What is reviewed in this report?\",\"answer\":\"The report reviews work in progress with the client, focusing on demolition, site preparation, excavation, and footings construction progress.\"},{\"question\":\"What work-in-progress observations are recorded for the project?\",\"answer\":\"Demolition is complete; topsoil and paved surfaces were removed; rough grading is finished; excavation for footings is complete; concrete footings were poured along gridline A from grids 1 to 8.\"},{\"question\":\"What information or action is required from the contractor?\",\"answer\":\"The contractor must clear miscellaneous wood to expose the connection of the existing 100 x 100 steel column at grid E3 to E9 so that shop drawing details can be verified.\"}]","Field Review Report 3 - FORM 3.1 Field Review Report 1 | PDF"]