[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-241339-105":53,"doc-detail-241339-en":119},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":112,"head_meta":114,"extra_data":116,"updated_unix":118},105,"en","feedback-weekly-taskboard-product-backlog-submittals","FEEDBACK - Weekly TaskBoard - Product Backlog submittals","","Weekly sprint reporting feedback focusing on submission quality for the Product Backlog and Sprint Task Board templates. Guidance covers correct formatting, readability, and consistency with the provided templates, including header repetition on multi-page Word/Excel outputs, wrapped text and adjusted column widths, and typed entries only. Feedback also addresses missing required fields and alignment of “% Done” and “Hours,” proper story elaboration handling, correct user and authorization/task assignments, and ensuring required sections, priority ordering, and yes/no review columns are included.",{"@graph":63,"@context":111},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/feedback-weekly-taskboard-product-backlog-submittals/241339/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/feedback-weekly-taskboard-product-backlog-submittals/241339.png","ImageObject",442,249,{"name":88,"@type":89},"Aurelia","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-14","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",8,{"@type":103,"mainEntity":104},"FAQPage",[105],{"name":106,"@type":107,"acceptedAnswer":108},"What feedback repeatedly highlights issues in the first submittals?","Question",{"text":109,"@type":110},"Common problems include missing required entries (such as “% Done” in each of the three columns and “Hours” where applicable), not submitting the Product Backlog using the provided template, and missing required content like introductions or required columns (e.g., a Yes/No review field).","Answer","https://schema.org",{"og:url":78,"og:type":113,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":115,"canonical":78},"index,follow",{"doc_id":117,"site_id":56},241339,1790645652,{"code":4,"msg":5,"data":120},{"doc_id":117,"user_id":121,"nickname":88,"user_avatar":122,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":123,"file_id":124,"file_url":125,"file_type":126,"file_size":127,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":76,"language":128,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":129,"faqs":130,"seo_title":131,"seo_description":61,"update_tm":132,"read_time":9},1099514068365,"https://ap-avatar.wpscdn.com/avatar/10000253d8d9f28188e?_k=1776742907772140068","Weekly Sprint Reporting Feedback  \n[http://athena.ecs.csus.edu/~buckley/CSc191/CSc191.html](http://athena.ecs.csus.edu/~buckley/CSc191/CSc191.html)  \nProduct Backlog Template (xlsx)…template with example entrees  \nSprint Task Board Template (docx) (pdf)  \nUse these standard forms – without modification.  \nCopies of both must be submitted weekly to both the Seminar Instructor and to team’s Faculty Adviser  \n􀁸 Both documents should be professionally prepared…for example the Product Backlog data should be aligned as represented on the template. The quality and presentation should be easily readable and understood…as if you were employed as development teams and were reporting to management. Word Tables and Excel spreadsheets requiring more than one printed page should repeat the header row at the top of each additional page. Column widths should be adjusted and cell content should be “wrapped” in order to increase the font size to be more easily readable.  \n􀁸 Entries to both the Product Backlog and Sprint Task Board should be typed and not handwritten…  \n􀁸 The collection of each Product Backlog at the start of each Sprint and each weekly Sprint Task Board are required entries to be included in the Team’s Project Log.  \nThe grades for these first set of submittals are not counted. If you have questions, let’s set a time to meet.  \nFeedback on first submittals  \nTeamOne Inc. (B-)  \n“WIP” is not the correct entry…in each of the three columns include, as indicated,“% Done”  \nThere is missing entries for some of the work done “Hours”. Correct Product Backlog formatting …centering and left margins used should be as indicated on the template.  \nOmniCom (D)  \nEntries on the form must be typed and not hand-written. The Product Backlog was not submitted as required (using the template provided)  \nTres Commas (B-)  \nWhat was intended by the addition of the “Authorization/Authentication” row…that had no entries? As indicated in the footnote, two or more team members must be assigned to each task (meaning also that the“two or more” do the work collaboratively.  \nThe Product Backlog should replicate the standard form provided in the PDF link.  \nEMJARK (D)  \nThe Task Board indicates that the only work done at the end of the 1st week was to complete these two forms   that is, the Sprint Backlog had no development work included. The Product Backlog was not submitted as required (using the template provided)  \nTeam Go (B-)  \nThe submitted Product Backlog does not require the Product Backlog Document introduction.  \nThe story template as discussed in class does not reference “I” as a user. In your examples the “I” appears to be“Faculty” …with no other type of user. Requirement questions 1) Does the faculty user need to delete and anew set of students at the end of each year? 2) Does tracking only apply for the individual teach for only one class of students?  \nCode Team 6 (D)  \n“Word Tables requiring more than one printed page should repeat the header row at the top of each page additional page.” This is a setting doable in Word. The first page has only the team info…the beginning of the Sprint Task Board should be included after the “Team Member” entries. Reformat the Product Backlog page soas to increase the font size as indicated above. The Excel row entries can be split across pages with the header repeated on each page. Narrow the columns and use the “wrap” function in Excel… also center data in the first two and last two columns.  \nPrestige Worldwide (B-)  \nProduct Backlog: The report does not require the Product Backlog document introduction.  \nThe Product Backlog list is not in priority order. The Site-Visitor story in Sprint 2 is an elaboration of the story…apparently detailing the set oftasks (functionality) that would be involved. Its “story point” value matches many of the other stories that do not contain the same type of elaboration. Why was this included … with no other stories having the same elaboration?  \nNote. Elaboration is need","cbCaibsFeFhwCk8u","https://ap.wps.com/l/cbCaibsFeFhwCk8u","pdf",171754,"English","# Weekly Sprint Reporting Feedback\n## Product Backlog template requirements\n## Sprint Task Board formatting and content\n## Team-by-team feedback notes","[{\"question\":\"What feedback repeatedly highlights issues in the first submittals?\",\"answer\":\"Common problems include missing required entries (such as “% Done” in each of the three columns and “Hours” where applicable), not submitting the Product Backlog using the provided template, and missing required content like introductions or required columns (e.g., a Yes/No review field).\"}]","FEEDBACK - Weekly TaskBoard - Product Backlog submittals | PDF",1789173901]