[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-240561-105":3,"detail-sidebar-cat-1-en-105":80,"doc-detail-240561-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","feasibility-study-report-recommendations-management-summary","Feasibility Study Report - Recommendations - Management Summary","","Feasibility Study Report template for a proposed project, including sections for recommendations, verification by project leadership, and documentation information. The report structure covers general information such as purpose, scope, project overview, and references, followed by a management summary detailing environment, organizations involved, input/output, processing, security, system interaction, and physical environment. It also addresses current procedures, functional objectives, assumptions and constraints, risk assessment, methodology, and business-case alignment with strategic initiatives.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/general/","General",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/feasibility-study-report-recommendations-management-summary/240561/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/feasibility-study-report-recommendations-management-summary/240561.png","ImageObject",442,249,{"name":42,"@type":43},"Aurelia","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-09-25","2026-09-11",true,{"@type":52,"interactionType":53,"userInteractionCount":30},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What does the feasibility study report define in the general information section?","Question",{"text":62,"@type":63},"It documents the purpose, scope (in scope and out of scope), a brief project overview, and the project references used to prepare the report.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What content is required in the management summary environment subsection?",{"text":67,"@type":63},"It covers organizations involved, input/output needs, processing requirements, security requirements, system interaction, and the physical environment and special conditions.",{"name":69,"@type":60,"acceptedAnswer":70},"How does the report handle feasibility evaluation and business justification?",{"text":71,"@type":63},"It includes a methodology section describing the evaluation approach (e.g., survey, weighting, modeling, benchmarking, simulation) and a statement of needs (business case) with alignment to strategic initiatives.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},240561,1789162769,{"code":4,"msg":81,"data":82},"success",[83,88,93,98,103,108,113,118,123],{"id":84,"doc_module":22,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},11,"Presentations",90,"presentations",{"id":89,"doc_module":22,"doc_module_name":25,"category_name":90,"show_sort_weight":91,"slug":92},12,"Resumes",80,"resumes",{"id":94,"doc_module":22,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},14,"Invoices",70,"invoices",{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},15,"Posters",60,"posters",{"id":104,"doc_module":22,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},16,"Social Media",50,"social-media",{"id":109,"doc_module":22,"doc_module_name":25,"category_name":110,"show_sort_weight":111,"slug":112},17,"Forms",40,"forms",{"id":114,"doc_module":22,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},18,"Letters",30,"letters",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":121,"slug":122},21,"Paper Templates",5,"papers-templates",{"id":124,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":4,"slug":125},158,"general-158",{"code":4,"msg":81,"data":127},{"doc_id":78,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":124,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":30,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":135,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":79,"read_time":33},1099514068365,"https://ap-avatar.wpscdn.com/avatar/10000253d8d9f28188e?_k=1776742907772140068","| | FEASIBILITY STUDY REPORT\u003Cbr>Proposed Project Name |\n| --- | --- |\n| [Name of Project Owner (KCDIO)] |  |\n\n\n|  |  | Version: 02\u003Cbr>Revision: 0\u003Cbr>Effective Date:\u003Cbr>03/2019 |  |\n| --- | --- | --- | --- |\n|  | RECOMMENDATIONS\u003Cbr>(to be filled in by requestor) |  |  |\n|  |  |  |  |\n| The document was prepared by:\u003Cbr>[Name] DATE\u003Cbr>[Designation][KCDI]\u003Cbr>I hereby verify that the content of the document is correct and meets the requirement of my office:\u003Cbr>Signature and Stamp DATE\u003Cbr>Project Director\u003Cbr>Based on our authority and judgment,\u003Cbr>□ ITD Management recommends the FSR WITHOUT AMENDMENTS and shall be bring up to UTICTEC Meeting (FSR Meeting   )\u003Cbr>□ ITD Management recommends the FSR WITH AMENDMENTS and shall be bring up to UTICTEC Meeting (amendments as per tabled in the Minute Meeting FSR   )\u003Cbr>□ The project is to be reviewed again in the next FSR Meeting No   ..\u003Cbr>□ The project is not recommended.\u003Cbr>Signature and Stamp DATE\u003Cbr>Director, ITD\u003Cbr>DOCUMENTATION INFORMATION (to be filled in by ITPMO) Assigned Feasibility Study Report ID : FSR Meeting No : |  |  |  |\n\n1.0 GENERAL INFORMATION  \n1.1 Purpose  \n[Describe the purpose of the Feasibility Study.]  \n1.2 Scope  \n[Describe the in scope and out of scope of the Feasibility Study as it relates to the proposed project.]  \n1.2.1  In Scope  \n[Detail scope of the project]  \n1.2.2  Out Scope  \n[Scope which is not covered in the proposed project]  \n1.3 Project Overview  \nProvide a brief project overview description as a point of reference for the remainder of the document. In addition, include the following:  \n\n| Process Owner | : |\n| --- | --- |\n| Proposed Project Name | : |\n| Proposed Project Abbreviation | : |\n\n1.4 Project References  \nProvide a list of the references that were used in preparation of this document. Examples of references are:  \n• Previously developed documents relating to the project  \n• Documentation concerning related projects  \n• ITD standard procedures documents  \n2.0 MANAGEMENT SUMMARY  \n2.1 Environment  \n2.1.1 Organizations Involved  \n[Identify the project sponsor, developer, user, and computer center or network in which the software will be implemented.]  \nProject Information  \n\n| Process Owner | [KCDIO Name] |\n| --- | --- |\n| Project Owner | [KCDIO Name] |\n| Project Type | [in-house, outsourced, mixed-mode, etc.] |\n\nProject Sponsor/ Director  \n\n| No. | Name | K/C/D/I | Roles |\n| --- | --- | --- | --- |\n| 1. |  |  | Project Sponsor |\n| 2. |  |  | Project Director |\n\nFunctional Team Members  \n\n| No. | Name | K/C/D/I | Roles |\n| --- | --- | --- | --- |\n| 1. |  |  | Functional Project Manager |\n| 2. |  |  | Functional Team Member |\n| 3. |  |  | Functional Team Member |\n\nProposed Technical Team Members  \n\n| No. | Name | K/C/D/I | Roles |\n| --- | --- | --- | --- |\n| 1. |  |  | Technical Project Manager |\n| 2. |  |  | Technical Team Member |\n| 3. |  |  | Technical Team Member |\n\n2.1.2 Input/output  \n[Describe the project input and output requirements.]  \n2.1.3 Processing  \n[Describe the project’s processing requirements.]  \n\n| 2.1.4 Security | Version: 02\u003Cbr>Revision: 0\u003Cbr>Effective Date:\u003Cbr>03/2019 |\n| --- | --- |\n| [Describe the project’s security requirements.]\u003Cbr>2.1.5 System Interaction\u003Cbr>[Describe the interaction with other systems.]\u003Cbr>2.1.6 Physical Environment\u003Cbr>[Describe the physical environment (batch processing environment, interactive online transactions, ad hoc reports, external and local communications).]\u003Cbr>System environment or special conditions needed Estimated Number of Users : Internet or Intranet or both Usage : Required storage?\u003Cbr>(require documents/files to be stored (upload feature) ?) : Database : Application Server : Special features? (Please describe) : Others? (Please state) :\u003Cbr>2.2 Current Functional Procedures\u003Cbr>[Describe current functional procedures of any existing system, whether automated or manual. Specifically, document the major processing and data flow of the current system(s), volume of work currently proces","cbCainGtWW7OIi59","https://ap.wps.com/l/cbCainGtWW7OIi59","pdf",402438,10,"English","# 1.0 General Information\n## 1.1 Purpose\n## 1.2 Scope\n## 1.2.1 In Scope\n## 1.2.2 Out Scope\n## 1.3 Project Overview\n## 1.4 Project References\n# 2.0 Management Summary\n## 2.1 Environment\n### 2.1.1 Organizations Involved\n### 2.1.2 Input/output\n### 2.1.3 Processing\n### 2.1.4 Security\n### 2.1.5 System Interaction\n### 2.1.6 Physical Environment\n## 2.2 Current Functional Procedures\n## 2.3 Functional Objectives\n## 2.4 Assumptions and Constraints\n## 2.5 Risk\n## 2.6 Methodology\n## 2.7 Statement of Needs (Business Case)","[{\"question\":\"What does the feasibility study report define in the general information section?\",\"answer\":\"It documents the purpose, scope (in scope and out of scope), a brief project overview, and the project references used to prepare the report.\"},{\"question\":\"What content is required in the management summary environment subsection?\",\"answer\":\"It covers organizations involved, input/output needs, processing requirements, security requirements, system interaction, and the physical environment and special conditions.\"},{\"question\":\"How does the report handle feasibility evaluation and business justification?\",\"answer\":\"It includes a methodology section describing the evaluation approach (e.g., survey, weighting, modeling, benchmarking, simulation) and a statement of needs (business case) with alignment to strategic initiatives.\"}]","Feasibility Study Report - Recommendations - Management Summary | PDF"]