[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-243251-105":53,"doc-detail-243251-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","exhibit-g1-submittal-schedule-ra-2023","Exhibit G.1 - Submittal Schedule - RA - 2023","","Exhibit G.1 establishes the required submittal schedule and minimum requirements for contractor deliverables. It requires the contractor and owner to review and update the submittal schedule before finalizing contract terms. The exhibit assigns due dates for recurring reports (daily plans, weekly progress, monthly progress) and project schedule updates, and specifies timeframes for safety, payment-related lien waivers, pre-construction plans, permits, insurance, and related execution documentation. It also outlines pending items and design and engineering submissions.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/exhibit-g1-submittal-schedule-ra-2023/243251/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/exhibit-g1-submittal-schedule-ra-2023/243251.png","ImageObject",442,249,{"name":88,"@type":89},"Cart","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-20","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":25},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of Exhibit G.1 (Submittal Schedule)?","Question",{"text":108,"@type":109},"Exhibit G.1 sets the minimum requirements for contractor submittals and defines a schedule with due dates. Contractor and Owner review and update the schedule before contract agreement finalization.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"When are regular progress and daily reports due during construction?",{"text":113,"@type":109},"The Plan of the Day Report is due daily at 8 AM. The Weekly Progress Report is due each Monday, and the Monthly Progress Report is due on the 10th day of each month during construction.",{"name":115,"@type":106,"acceptedAnswer":116},"What due timeframe is required for pre-construction plans such as the document control plan and project execution plan?",{"text":117,"@type":109},"Multiple pre-construction items, including the document control plan, project execution plan, quality assurance plan, health and safety plan, security plan, and site environmental plan, are due 30 days after the Execution Date.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},243251,1791716236,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":25,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":76},18829141979164,"https://eur-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","EXHIBIT G.1  \nSUBMITTAL SCHEDULE  \nEach Contractor Deliverable shall meet the minimum requirements for submittals prescribed in Exhibit G.1 (Submittal Requirements) . Prior to finalizing a contract agreement, Contractor and Owner shall review this submittal schedule and update if for including in the contract agreement.  \nUnless defined in this Exhibit TBD, terms that begin with an upper case shall have the meaning defined in the Agreement.  \n\n| Item | Name of Submittal | Date Due |\n| --- | --- | --- |\n| Regular Submittals |  |  |\n| 01 | Plan of the Day Report [NTD: reconcile with defined terms] | 8 AM daily during construction |\n| 02 | Weekly Progress Report [NTD: reconcile with defined terms] | Each Monday during\u003Cbr>construction |\n| 03 | Monthly Progress Report [NTD: reconcile with defined terms] | 10th day of each month during construction |\n| 04 | Weekly updates to Project Schedule [NTD: reconcile with defined terms] | As set forth in the Agreement |\n| 05 | Notice to Owner of safety recordable, OSHA (or equivalent) visits and/or fines, reportable spills, visits by any environmental organization, any take of an environmentally-sensitive species, and/or any security breach, including theft or vandalism | Within 24 hours of occurrence |\n|  | Requests for Payment and copies of Lien Waivers [NTD: reconcile with |  |\n| 06 | defined terms] | As set forth in the Agreement |\n| Pre-Construction Submittals |  |  |\n| 07 | Document control plan, including transmittal protocol, document naming, webbased submittal management, and other similar items | 30 days after Execution Date |\n| 08 | Project execution plan, as described in Exhibit A (Scope of Work) | 30 days after Execution Date |\n| 09 | Quality assurance plan, as described in Exhibit A (Scope of Work) | 30 days after Execution Date |\n| 10 | Health and safety plan, as described in Exhibit A (Scope of Work) | 30 days after Execution Date |\n| 11 | Security plan, as described in Exhibit A (Scope of Work) | 30 days after Execution Date |\n| 12 | Site environmental plan, as described in Exhibit A (Scope of Work) | 30 days after Execution Date |\n| 13 | Traffic management plan, as described in Exhibit A (Scope of Work) | Prior to Contractor mobilization |\n| 14 | Fire management plan, as described in Exhibit A (Scope of Work) | Prior to Contractor mobilization |\n| 15 | Project Site rules / regulations | Prior to Contractor mobilization |\n| 16 | Offloading plans and procedures | 90 days prior to delivery of first Turbine to Project Site |\n| 17 | Crane mobilization plans | 90 days prior to delivery of first Turbine to Project Site |\n| 18 | Spill prevention, control, and countermeasure (SPCC) plan | Prior to Contractor mobilization |\n| 19 | List of all Hazardous Material to be brought onto or generated at the Project Site by Contractor or any Subcontractor (per Section TBD of the Agreement) | Prior to bringing or generating such Hazardous Material onto or at the Project Site |\n| 20 | Hazardous waste management and control plan | Prior to Contractor mobilization |\n| 21 | For each Contractor-Acquired Permit, copy of application and other documentation to be submitted to any Governmental Authority | [Pending] |\n| 22 | Certificates of insurance | As set forth in the Agreement |\n| 23 | Parent Guarantee | As set forth in the Agreement |\n| 24 | Escrow Agreement | As set forth in the Agreement |\n\n| Item | Name of Submittal | Date Due |\n| --- | --- | --- |\n| 25 | Storage and maintenance invoice (TSA ONLY) | As set forth in the Agreement |\n| 26 | Delivery Certificate (TSA ONLY) | As set forth in the Agreement |\n| Manufacturing / Design Submittals (TSA ONLY) |  |  |\n| 27 | Tentative manufacturing and testing schedule specifying the date and where the Major Components are going to be manufactured and any special tests to be performed. | 30 days after Notice to Proceed |\n| 28 | Tentative Work schedule, including anticipated production / manufacturing dates of Turbine Nacelles, and anticipated Ex Works and d","cbCairnf5Vo8bfvt","https://ap.wps.com/l/cbCairnf5Vo8bfvt","pdf",203724,7,"English","# Submittal Schedule\n## Regular Submittals\n## Pre-Construction Submittals\n## Manufacturing / Design Submittals\n## Engineering Submittals and Design Documents - Geotechnical Services\n## Engineering Submittals and Design Documents - Civil Works","[{\"question\":\"What is the purpose of Exhibit G.1 (Submittal Schedule)?\",\"answer\":\"Exhibit G.1 sets the minimum requirements for contractor submittals and defines a schedule with due dates. Contractor and Owner review and update the schedule before contract agreement finalization.\"},{\"question\":\"When are regular progress and daily reports due during construction?\",\"answer\":\"The Plan of the Day Report is due daily at 8 AM. The Weekly Progress Report is due each Monday, and the Monthly Progress Report is due on the 10th day of each month during construction.\"},{\"question\":\"What due timeframe is required for pre-construction plans such as the document control plan and project execution plan?\",\"answer\":\"Multiple pre-construction items, including the document control plan, project execution plan, quality assurance plan, health and safety plan, security plan, and site environmental plan, are due 30 days after the Execution Date.\"}]","Exhibit G.1 - Submittal Schedule - RA - 2023 | PDF",1789201913]