[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-236581-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-236581-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","exhibit-a-scope-of-work","Exhibit A - Scope of Work","","Exhibit “A” outlines a subcontractor’s responsibilities to obtain permits and business licenses, receive and supplement project plans, and provide complete deliverables including shop drawings, submittals, samples, as-builts, operating manuals, materials, and warranties. It covers logistics and coordination for stocking, storage containers, owner-provided equipment, temporary power, and written Requests for Information. The scope includes compliance with building codes and safety laws, hard-hat and PPE requirements, review of the bid set, and conditions for daily work reports, parking coordination, and backcharges, including corrective actions within 24 hours.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/letters/","Letters",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/exhibit-a-scope-of-work/236581/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/exhibit-a-scope-of-work/236581.png","ImageObject",442,249,{"name":42,"@type":43},"Valentina","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-19","2026-09-11",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",11,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What permits and licenses must the subcontractor obtain?","Question",{"text":63,"@type":64},"The subcontractor must obtain and maintain all permits and business licenses required to perform and complete its work.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What documents and materials must the subcontractor provide?",{"text":68,"@type":64},"The subcontractor must provide shop drawings, submittals, samples, as-builts, operating manuals, overstock materials, and all warranties required by the contract documents, in specified quantities.",{"name":70,"@type":61,"acceptedAnswer":71},"When can backcharges be applied and what corrective action timelines apply?",{"text":72,"@type":64},"When grounds exist to justify a back charge, the contractor may give written notice requiring corrective action within 24 hours; failure to commence and satisfactorily continue results in liability for resulting costs, expenses, and related charges.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},236581,1790034642,{"code":4,"msg":82,"data":83},"success",[84,88,93,98,103,108,113,117,122],{"id":55,"doc_module":22,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Presentations",90,"presentations",{"id":89,"doc_module":22,"doc_module_name":25,"category_name":90,"show_sort_weight":91,"slug":92},12,"Resumes",80,"resumes",{"id":94,"doc_module":22,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},14,"Invoices",70,"invoices",{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},15,"Posters",60,"posters",{"id":104,"doc_module":22,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},16,"Social Media",50,"social-media",{"id":109,"doc_module":22,"doc_module_name":25,"category_name":110,"show_sort_weight":111,"slug":112},17,"Forms",40,"forms",{"id":114,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":115,"slug":116},18,30,"letters",{"id":118,"doc_module":22,"doc_module_name":25,"category_name":119,"show_sort_weight":120,"slug":121},21,"Paper Templates",5,"papers-templates",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":4,"slug":125},158,"General","general-158",{"code":4,"msg":82,"data":127},{"doc_id":79,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":114,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":26,"language":135,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":12,"update_tm":139,"read_time":22},13056703020460,"https://ap-avatar.wpscdn.com/avatar/be000253dac470eee5d?_k=1778207105932848923","Please copy to: Jobsite Superintendent and/or Foreman  \nExhibit “A”  \n(Insert Trade) Scope of Work  \n(Project Name)  \n(Project Address)  \n(Subcontractor Name)  \nWLB Subcontract No. (Project \\#)/Cost Code (CSI \\#)  \nA. Subcontractor shall obtain and maintain all permits and business licenses required to perform and complete its work.  \nB. W. L. Butler Construction, Inc. , will provide Subcontractor a complete set of specifications and plans on  \nCD/Electronic files for the project. Subcontractor is responsible for buying any additional plans needed to perform its work.  \nC. Subcontractor shall provide shop drawings (6 sets), submittals (6 sets), samples, as-builts, operating manuals, overstock materials, and all warranties required by the Contract Documents.  \nD. Subcontractor shall provide a list of any materials with a lead time over 2 weeks.  \nE. Subcontractor shall be responsible for all of its own material stocking and storage due to limited space availability on site; please coordinate with the W. L. Butler Construction, Inc. , Project Manager or Superintendent.  \nF. Subcontractor is responsible for and shall supply its own storage container, if needed, in a location determined by W. L. Butler Construction’s Project Superintendent.  \nG. At the discretion of W. L. Butler Construction, Inc. on certain projects Subcontractors shall provide quantity survey for owner provided materials.  \nH. Subcontractor shall receive, off-load and store all owner provided equipment pertaining to its trade, if applicable. Subcontractor shall also coordinate and install all owner provided items per the Contract Documents, as pertaining to Subcontractor’s work, if applicable.  \nI. Subcontractor is responsible for supplying any temporary power and additional task lighting required to perform its work.  \nJ. All Requests for Information must be in writing.  \nK. If required by W. L. Butler Construction, Inc. , Subcontractor shall provide Daily Work Reports to the W. L. Butler Construction, Inc. , Project Superintendent for each day Subcontractor is working on site.  \nL. Parking is the responsibility of Subcontractor; coordinate with the W. L. Butler Construction, Inc. , Project Superintendent.  \nM. Subcontractor’s work shall comply with all local , State and Federal building codes, laws and regulations.  \nN. Subcontractor shall adhere to all current safety laws including Cal OSHA regulations, and to W. L. Butler Construction’s safety standards.  \nO. At ALL times and throughout ALL phases and areas of the project, ALL personnel shall wear hard hats , eye  \nprotection, work boots and highly visibility safety vests, shirts or jackets, which are in accordance with OSHA regulations and ANSI standards.  \nP. Subcontractor shall carefully review the entire bid set of documents. Information regarding the Subcontractor’s scope of work may be dispersed throughout the document set.  \nQ. W. L. Butler Construction, Inc. , has provided or made available to Subcontractor a complete set of drawings and specifications. Subcontractor shall supply and install all materials necessary to complete its work per the entire set of drawings and specifications, and in strict accordance with the Contract Documents. Any discrepancies oromissions not brought to the attention of Contractor at the time of bid will be the Subcontractor’s responsibility to supply and install at no cost.  \nR. Subcontractor shall not be entitled to any payment for Field Extra Work Orders without the signature of W. L.  \nButler Construction’s Project Superintendent or Project Manager. The effect of such signature is limited by the terms and conditions of the Subcontract Agreement.  \nS. When grounds exist justifying a back charge against Subcontractor, whether or not due to a default under this Agreement, Contractor may provide Subcontractor written notice to take appropriate corrective action, as determined by Contractor, within twenty-four (24) hours. If Subcontractor fails to commence and satisfactor","cbCaidhKiGVju9pq","https://ap.wps.com/l/cbCaidhKiGVju9pq","pdf",55808,"English","# A. Subcontractor licensing and plans\n# B. Required submissions and project deliverables\n# C. Logistics, storage, and coordination\n# D. Code compliance and safety requirements\n# E. Administrative processes and reporting\n# F. Backcharges and change order conditions\n# G. Labor rates, staffing info, and insurance requirements","[{\"question\":\"What permits and licenses must the subcontractor obtain?\",\"answer\":\"The subcontractor must obtain and maintain all permits and business licenses required to perform and complete its work.\"},{\"question\":\"What documents and materials must the subcontractor provide?\",\"answer\":\"The subcontractor must provide shop drawings, submittals, samples, as-builts, operating manuals, overstock materials, and all warranties required by the contract documents, in specified quantities.\"},{\"question\":\"When can backcharges be applied and what corrective action timelines apply?\",\"answer\":\"When grounds exist to justify a back charge, the contractor may give written notice requiring corrective action within 24 hours; failure to commence and satisfactorily continue results in liability for resulting costs, expenses, and related charges.\"}]","Exhibit A - Scope of Work | PDF",1789106280]