[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-248390-105":53,"doc-detail-248390-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","estimation-for-construction-of-school-building-badvel-kadapa-andhra-pradesh-india","Estimation for Construction of School Building - Badvel, Kadapa (Andhra Pradesh, India)","","Construction cost estimation for a school building project located in Badvel, Kadapa district, Andhra Pradesh, India, prepared for “Mother Teresa Mahila Mandali” (Founder & President: Jinka Santhamma). The estimate itemizes civil works and materials for excavation, sand filling, PCC and R.R. works, RCC components (footings, columns, beams, slab, stair case), SSF steel grills, brick masonry, door/window supply and fixing, plastering, flooring tiles, and colour wash. It includes quantities, measurements in meters, rates per cubic meter, and computed amounts, culminating in totals including electrical charges provision for the ground floor.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":21,"@type":70,"position":76},"https://docshare.wps.com/template/invoices/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/estimation-for-construction-of-school-building-badvel-kadapa-andhra-pradesh-india/248390/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/estimation-for-construction-of-school-building-badvel-kadapa-andhra-pradesh-india/248390.png","ImageObject",442,249,{"name":88,"@type":89},"Melati","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-16","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",8,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What are the project location and organization details for this estimation?","Question",{"text":109,"@type":110},"The project is for a school building at Badvel, Kadapa district, Andhra Pradesh, India. The organization is Mother Teresa Mahila Mandali, addressed at 3/24 Surendra Nagar, Badvel Kadapa District, A.P., India 516227, with Founder & President Jinka Santhamma.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"Which types of construction works are included in the estimate table?",{"text":114,"@type":110},"The estimate includes earthwork excavation, sand filling, PCC and R.R. works, RCC footings/columns/beams/roof slab/staircase, SSF steel grills, brick masonry, door and window supply and fixing, plastering, flooring with tiles, and colour wash.",{"name":116,"@type":107,"acceptedAnswer":117},"How are costs summarized within the document?",{"text":118,"@type":110},"The table provides quantities and measurements (in meters) alongside rates and amounts per item. It also shows sub totals and a total for the ground floor, including a provision for electrical charges at 7.5%.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},248390,1790483862,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":20,"category_name":21,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":141,"read_time":76},962085570644,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","ESTIMATION FOR CONSTRUCTION OF BUILDING  \nNAME OF THE WORK: CONSTRUCTION OF SCHOOL BUILDING LOCATION : BADVEL, KADAPA DT. ANDHRAPRADESH, INDIA  \nORGANIZATION: MOTHER TERESA MAHILA MANDALI ADDRESS: 3/24 SURENDRA NAGAR BADVEL KADAPA DIST. A. P. INDIA 516227  \nFOUNDER & PRESIDENT: JINKA SANTHAMMA  \n\n| S. NO. | PARTICULARS | NO.S | MEASUREMENT IN METERS |  |  | AREA m3 | RATE PER\u003Cbr>m3 | AMOUNT IN\u003Cbr>RS. |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  | HEIGHT | LENGTH | WIDTH |  |  |  |\n| 1 | Earth work excavation and depasting soil in initial lead and lift in b.c.Soils, red earth and ordinary gravel etc. complete |  |  |  |  |  |  |  |\n|  | columns | 1 x 22 | 1.50 | 1.50 | 1.80 | 89.10 | 80.00 | 8748.80 |\n|  | long walls | 1 x 2 | 16.50 | 0.60 | 0.60 | 11.88 |  |  |\n|  | cross walls | 1 x 2 | 11.65 | 0.60 | 0.60 | 8.38 |  |  |\n|  |  |  |  |  |  | 103.36 |  |  |\n| 2 | Sand filling and water ramming including the cost of conveyance of all materials and laborcharges in foundation and basement in stanford specifications |  |  |  |  |  |  |  |\n| a. | Foundation |  |  |  |  |  |  | 33940.80 |\n|  | columns | 22.00 | 1.50 | 1.50 | 0.30 | 14.85 | 160.00 |  |\n|  | long walls | 1 x 2 | 16.50 | 0.60 | 0.15 | 2.95 |  |  |\n|  | cross walls | 1 x 2 | 11.65 | 0.60 | 0.15 | 2.09 |  |  |\n| b. | Basement | 1 x 1 | 16.50 | 11.65 | 1.00 | 192.22 |  |  |\n|  |  |  |  |  |  | 212.13 |  |  |\n| 3 | [P.C.C. in](P.C.C. in) (1:4:8) to use 40 mm metal including the cost off conveyance of all materials and labor charges etc. |  |  |  |  |  |  |  |\n| a. | Foundation |  |  |  |  |  |  |  |\n|  | columns | 1 x 22 | 1.50 | 1.50 | 0.30 | 14.85 | 1950.00 | 95043.00 |\n|  | long walls | 1 x 2 | 1.50 | 1.50 | 0.15 | 2.97 |  |  |\n|  | cross walls | 1 x 2 | 1.50 | 1.50 | 0.15 | 2.09 |  |  |\n| b. | Basement | 1 x 1 | 16.50 | 11.65 | 0.15 | 28.83 |  |  |\n| 4 | [R.R. in](R.R. in) c. m.(1:6) including the cost of conveyance of all materials and laborcharges |  |  |  |  |  |  |  |\n|  | long walls | 1 x 2 | 14.75 | 0.60 | 1.60 | 28.32 | 1800.00 | 87264.00 |\n|  | cross walls | 1 x 2 | 10.50 | 0.60 | 1.60 | 20.16 |  |  |\n| 5 | R.C.C. (1:2:4) to use 40 mm metal including the cost and conveyance of all materials and labor charges etc |  |  |  |  |  |  |  |\n| a. | Footings | 1 x 22 | 1.50 | 1.50 | 0.46 | 22.77 | 3500.00 | 129255.00 |\n| b. | Columns | 1 x 22 | 0.35 | 0.23 | 8.00 | 14.16 |  |  |\n| c | Plinth beam |  |  |  |  |  |  |  |\n|  | Long beams | 1 x 2 | 16.50 | 0.23 | 0.35 | 2.65 | 3800.00 | 32870.00 |\n|  | Cross Beams | 1 x 4 | 11.65 | 0.23 | 0.35 | 3.75 |  |  |\n|  | Another beams | 1 x 4 | 5.30 | 0.23 | 0.35 | 1.70 |  |  |\n|  | Another beams | 1 x 2 | 3.46 | 0.23 | 0.35 | 0.55 |  |  |\n|  |  |  |  |  |  | 8.65 |  |  |\n\n\n| d | Roof Beams |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  | Long beams | 1 x 2 | 16.50 | 0.23 | 0.35 | 2.65 | 4000.00 | 34600.00 |\n|  | Cross beams | 1 x 4 | 11.65 | 0.23 | 0.35 | 3.75 |  |  |\n|  | Another beams | 1 x 4 | 5.30 | 0.23 | 0.35 | 1.70 |  |  |\n|  | Another Beams | 1 x 2 | 3.46 | 0.23 | 0.35 | 0.55 |  |  |\n|  |  |  |  |  |  | 8.65 |  |  |\n| e | Roof Slab | 1 x 1 | 16.50 | 11.65 | 0.10 | 19.22 | 4000.00 | 76880.00 |\n| f | Stair case | 1 x 1 | 4.57 | 1.80 | 0.15 | 1.23 | 4000.00 | 4935.00 |\n| 6 | SSF Steel grills including the cost and conveyance of all materials and labour charges |  |  |  |  |  |  |  |\n| a | Columns | 14.16 x 130 Kgs. |  |  |  | 1840.00 | 42.00 | 338898.00 |\n| b | Footings | 22.77 x 100 kgs |  |  |  | 2277.00 |  |  |\n| c | Plinth beam | 8.65 x 120 kgs |  |  |  | 1038.00 |  |  |\n| d | Roof Beams | 8.65 x 120 kgs |  |  |  | 1038.00 |  |  |\n| e | Roof slab | 19.22 X 90 Kgs. |  |  |  | 1729.00 |  |  |\n| f | Stair case | 1.23 x 120 Kgs. |  |  |  | 147.00 |  |  |\n|  |  |  |  |  |  | 8069.00 |  |  |\n| 7 | Brick Masonary C. M. (1:6) including the cost of transportation & labor charges |  |  |  |  |  |  |  |\n|  | Long walls | 1 x 2 | 16.50 | 0.23 | 2.75 | 2.75 | 1900.00 | 118693.00","cbCaitenUPta6Z7y","https://ap.wps.com/l/cbCaitenUPta6Z7y","pdf",75611,7,"English","# Estimation for Construction of Building\n## Project details\n## Itemized construction works and measurements\n## Sub totals and total ground floor","[{\"question\":\"What are the project location and organization details for this estimation?\",\"answer\":\"The project is for a school building at Badvel, Kadapa district, Andhra Pradesh, India. The organization is Mother Teresa Mahila Mandali, addressed at 3/24 Surendra Nagar, Badvel Kadapa District, A.P., India 516227, with Founder \\u0026 President Jinka Santhamma.\"},{\"question\":\"Which types of construction works are included in the estimate table?\",\"answer\":\"The estimate includes earthwork excavation, sand filling, PCC and R.R. works, RCC footings/columns/beams/roof slab/staircase, SSF steel grills, brick masonry, door and window supply and fixing, plastering, flooring with tiles, and colour wash.\"},{\"question\":\"How are costs summarized within the document?\",\"answer\":\"The table provides quantities and measurements (in meters) alongside rates and amounts per item. It also shows sub totals and a total for the ground floor, including a provision for electrical charges at 7.5%.\"}]","Estimation for Construction of School Building - Badvel, Kadapa (Andhra Pradesh, India) | PDF",1789245798]