[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-253782-105":53,"doc-detail-253782-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","earthworks-hipo-excavated-uxb-incident","Earthworks-HiPo-Excavated-UXB-Incident","","This document outlines a high-potential incident involving an Unexploded Bomb (UXB) discovered during earthworks at Cubbington Cut (Ch 135+050) on May 18, 2023. The UXB was unearthed by a Caterpillar Scraper operated by BBV contractor. The operator immediately raised the alarm, leading to the evacuation of surrounding work areas and adjacent public houses. The Police and Explosive Ordnance Disposal (EOD) Team were contacted and successfully detonated the bomb on May 19, 2023, at 1330 hrs. Initial findings indicated that the area was previously surveyed as low-risk by Zetica Ltd, prompting a recommendation for all Sub-Lots to review their UXB surveys registered as medium risk or higher. The Emergency Preparedness Plan was effectively followed, with senior management, the H&S Team, and emergency services notified promptly. All personnel acted in accordance with the plan, resulting in a positive outcome. The incident involved a SC 250 Air-Drop General Purpose High Explosive Bomb, measuring 1 meter in length and 368mm in diameter.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":51,"@type":70,"position":76},"https://docshare.wps.com/template/general/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/earthworks-hipo-excavated-uxb-incident/253782/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/earthworks-hipo-excavated-uxb-incident/253782.png","ImageObject",442,249,{"name":88,"@type":89},"Hazel","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-09-20","2026-09-13",true,{"@type":98,"interactionType":99,"userInteractionCount":76},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What type of incident occurred and where?","Question",{"text":108,"@type":109},"A high-potential incident involving an Unexploded Bomb (UXB) occurred during earthworks at Cubbington Cut (Ch 135+050).","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What actions were taken immediately after the UXB was discovered?",{"text":113,"@type":109},"The operator raised the alarm, the area was evacuated, Senior Management and the H&S Team were notified, and Emergency Services (Police and EOD Team) were contacted to secure and cordon off the area.",{"name":115,"@type":106,"acceptedAnswer":116},"What was the outcome of the UXB discovery?",{"text":117,"@type":109},"The UXB was detonated successfully by the EOD team, and all personnel involved acted in accordance with the Emergency Preparedness Plan, resulting in a positive outcome.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},253782,1789270067,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":50,"category_name":51,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":76,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":125,"read_time":4},137441390410,"https://ap-avatar.wpscdn.com/avatar/2000252f4ab5702993?_k=1776741390130283984","Earthworks HiPo-Excavated UXB Incident  \n\n| \u003Cbr>| 18/05/2023 | Incident type | High Potential |\n| --- | --- | --- | --- |\n|  | INC15705 | Contractor | BBV |\n|  | 2a | Location | Cubbington Cut (Ch 135+050) |\n|  | EOD, UXB, UXO, Bomb | Reported by | Graham Ward |\n\n Summary of Incident  \nWhen carrying out earthworks activities at Cubbington Cut. An Unexploded Bomb (UXB) was reported. The UXB was picked up in the bowl of the Scraper and was immediately placed onto the ground by the Operator. The Operator instantly raised the alarm.  \nThe Police and Explosive Ordnance Disposal (EOD) Team were contacted to control the area. The surrounding work areas were immediately evacuated. Public houses adjacent to the Woods (aligned with the UXB) were evacuated when the bomb was detonated successfully by the EODat 1330 hrs 19/05/2023 .  \n Initial Findings  \n• The area has been identified through the Zetica Ltd UXB Survey as being a Low-Risk area.  \n• Recommendations that all Sub-Lots check their UXB Surveys that have been registered as a Medium Risk or upwards.  \n• The Emergency Preparedness Plan was successfully complied with.  \n Immediate Actions  \n• Earthworks Mobile Plant Operator called EWKS General Foreman confirmed that a UXB was uncovered by a 631  \nCaterpillar Scraper at 1615 hrs.  \n• The Operator raised the alarm, and the area was evacuated.  \n• Senior Management including H&S Team notified at 1620 hrs.  \n• Emergency Services (Police and EOD Team) notified 1630 hrs.  \n• Area cordoned off by Police and the EOD Team.  \n Behavioural Currencies  \n• Positive: All Personnel involved within the Works and surrounding areas all acted in accordance with the Emergency Preparedness Plan. Excellent Positive Outcome.  \n Photographs  \nSC 250 Air-Drop General Purpose High Explosive Bomb (1m long and 368mm diameter) found on Site  \nSafe detonation by the EOD Team dated 19/05/2023  \n☐  ☐  ☐ ☐  ☐  ☒","cbCaiuUEpnn6RZo7","https://ap.wps.com/l/cbCaiuUEpnn6RZo7","pdf",252403,"English","# Summary of Incident\n# Initial Findings\n# Immediate Actions\n# Behavioural Currencies\n# Photographs","[{\"question\":\"What type of incident occurred and where?\",\"answer\":\"A high-potential incident involving an Unexploded Bomb (UXB) occurred during earthworks at Cubbington Cut (Ch 135+050).\"},{\"question\":\"What actions were taken immediately after the UXB was discovered?\",\"answer\":\"The operator raised the alarm, the area was evacuated, Senior Management and the H\\u0026S Team were notified, and Emergency Services (Police and EOD Team) were contacted to secure and cordon off the area.\"},{\"question\":\"What was the outcome of the UXB discovery?\",\"answer\":\"The UXB was detonated successfully by the EOD team, and all personnel involved acted in accordance with the Emergency Preparedness Plan, resulting in a positive outcome.\"}]","Earthworks-HiPo-Excavated-UXB-Incident | PDF"]