[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-172541-105":53,"doc-detail-172541-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","dhaka-power-distribution-company-limited-dpdc-bidding-document-volume-2-design-supply-installation-testing-and-commissioning-of-capacitor-banks","Dhaka Power Distribution Company Limited - DPDC - Bidding Document - Volume 2 - Design, Supply, Installation, Testing and Commissioning of Capacitor Banks","","Bidding documents for DPDC in Bangladesh cover turnkey design, supply, installation, testing and commissioning of 11 kV switched and 33 kV switched, as well as 11 kV fixed capacitor banks and associated equipment. Volume 2 presents detailed intent and scope of work, including design deliverables, civil and structural works, studies for siting, terminal points, exclusions and contractor responsibilities. It further specifies general technical requirements such as technical conditions, site and climatic parameters, applicable codes and standards, proven design, compatibility with future smart grid, training and quality control expectations.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/dhaka-power-distribution-company-limited-dpdc-bidding-document-volume-2-design-supply-installation-testing-and-commissioning-of-capacitor-banks/172541/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/dhaka-power-distribution-company-limited-dpdc-bidding-document-volume-2-design-supply-installation-testing-and-commissioning-of-capacitor-banks/172541.png","ImageObject",442,249,{"name":88,"@type":89},"\tWilliam","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-22","2026-09-01",true,{"@type":98,"interactionType":99,"userInteractionCount":25},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What project is covered by this DPDC bidding document volume?","Question",{"text":108,"@type":109},"The volume covers construction and augmentation of substation-related works, installation of capacitor banks, and introduction of smart grid capabilities in DPDC’s power system under a turnkey basis approach.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What types of capacitor banks and equipment are included?",{"text":113,"@type":109},"The scope includes 11 kV switched, 33 kV switched, and 11 kV fixed capacitor banks, together with associated equipment and related works.",{"name":115,"@type":106,"acceptedAnswer":116},"Which main topics does Volume 2 cover in the general technical requirements?",{"text":117,"@type":109},"It covers general technical conditions, site and climatic conditions, system parameters, auxiliary power supply, applicable codes and standards, proven design and improvements, smart-grid compatibility, training, quality control, tests, tools and spare parts, and guaranteed technical particulars.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},172541,1791689343,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":25,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":141},5909887254083,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","Dhaka Power Distribution Company Limited\n(DPDC)\nBIDDING DOCUMENT\nfor\nBidding Document for Design, Supply, Installation, Testing and Commissioning of 11 kV Switched, 33 kV Switched and 11 kV Fixed Capacitor Banks and Associated Equipment, Civil Works in Distribution Network of DPDC on Turnkey Basis.\nVolume – 2 of 2\nInvitation for Bids No : 87.139.103.00.00.2022.434; date: 08.09.2022\nPurchaser                    : Dhaka Power Distribution Company Limited (DPDC)\nCountry                        : Bangladesh\nFinanced by                 : AFD Loan No. CBD 1023 01 T\nName of the Project\t: Construction and Augmentation of Substation, Installation of Capacitor Bank and Introduction of Smart Grid in Power System under DPDC\nSeptember, 2022\n\u0013\u0013 NUMPAGES   \\* MERGEFORMAT \u0014250\u0015\u0015\ntable of contents\n\u0013 TOC \\o \"1-3\" \\h \\z \\u \u0014\u0013 HYPERLINK \\l \"_Toc113887076\" \u00141.\tIntent of the Specification\t\u0013 PAGEREF _Toc113887076 \\h \u001413\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887077\" \u00142.\tScope of Work\t\u0013 PAGEREF _Toc113887077 \\h \u001414\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887078\" \u00142.1.\tScope of Design, Supply, Transportation, Erection, Testing & Commissioning\t\u0013 PAGEREF _Toc113887078 \\h \u001414\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887079\" \u00142.2.\tCivil and Structural Works\t\u0013 PAGEREF _Toc113887079 \\h \u001416\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887080\" \u00142.3.\tStudies for finalisation of location of capacitor Banks and Final BOQ\t\u0013 PAGEREF _Toc113887080 \\h \u001417\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887081\" \u00142.4.\tProposed Locations of switched capacitor banks\t\u0013 PAGEREF _Toc113887081 \\h \u001418\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887082\" \u00142.5.\tTraining of Engineers & Organizational Capacity Building of DPDC\t\u0013 PAGEREF _Toc113887082 \\h \u001422\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887083\" \u00142.6.\tTerminal Points\t\u0013 PAGEREF _Toc113887083 \\h \u001422\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887084\" \u00142.7.\tExclusions\t\u0013 PAGEREF _Toc113887084 \\h \u001423\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887085\" \u00142.8.\tAdditional responsibilities of the Contractor\t\u0013 PAGEREF _Toc113887085 \\h \u001423\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887086\" \u00143.\tGeneral Technical REQUIREMENT\t\u0013 PAGEREF _Toc113887086 \\h \u001425\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887087\" \u00143.1.\tGeneral Technical Conditions\t\u0013 PAGEREF _Toc113887087 \\h \u001425\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887088\" \u00143.2.\tSite Location and Climatic Conditions\t\u0013 PAGEREF _Toc113887088 \\h \u001425\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887089\" \u00143.2.1.\tDesign ambient Temperature\t\u0013 PAGEREF _Toc113887089 \\h \u001426\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887090\" \u00143.3.\tMain System Parameters\t\u0013 PAGEREF _Toc113887090 \\h \u001426\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887091\" \u00143.4.\tAuxiliary Power Supply\t\u0013 PAGEREF _Toc113887091 \\h \u001427\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887092\" \u00143.5.\tApplicable Codes & Standard\t\u0013 PAGEREF _Toc113887092 \\h \u001427\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887093\" \u00143.6.\tProven Design\t\u0013 PAGEREF _Toc113887093 \\h \u001428\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887094\" \u00143.7.\tDesign Improvements\t\u0013 PAGEREF _Toc113887094 \\h \u001428\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887095\" \u00143.8.\tCompatibility with Present System & Future Smart Grid\t\u0013 PAGEREF _Toc113887095 \\h \u001428\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887096\" \u00143.9.\tVariation in Quantities of Work\t\u0013 PAGEREF _Toc113887096 \\h \u001429\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887097\" \u00143.10.\tAssistance by the Employer\t\u0013 PAGEREF _Toc113887097 \\h \u001429\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887098\" \u00143.11.\tTraining for Employer’s Staff & Technology Transfer\t\u0013 PAGEREF _Toc113887098 \\h \u001429\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887099\" \u00143.11.1.\tTraining at Manufacturer’s Premises / Factory\t\u0013 PAGEREF _Toc113887099 \\h \u001429\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887100\" \u00143.11.2.\tTraining on Operation & Maintenance at Employer’s Country:\t\u0013 PAGEREF _Toc113887100 \\h \u001430\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887101\" \u00143.11.3.\tOn the Job Training (OJT)\t\u0013 PAGEREF _Toc113887101 \\h \u001430\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887102\" \u00143.12.\tCapitalisation of Capacitor Losses\t\u0013 PAGEREF _Toc113887102 \\h \u001431\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887103\" \u00143.12.1.\tCompensation for Loss beyond Quoted Value\t\u0013 PAGEREF _Toc113887103 \\h \u001431\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887104\" \u00143.13.\tDrawings and Documents\t\u0013 PAGEREF _Toc113887104 \\h \u001432\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc113887105\" \u00143.13.1.\tEngineering Data\t\u0013 PAGEREF _Toc113887105 \\h \u001432\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc11388","cbCaidVqNV4uIHG2","https://ap.wps.com/l/cbCaidVqNV4uIHG2","docx",1087002,251,"English","# Intent of the Specification\n# Scope of Work\n## Scope of Design, Supply, Transportation, Erection, Testing & Commissioning\n## Civil and Structural Works\n## Studies for finalisation of location of capacitor Banks and Final BOQ\n## Proposed Locations of switched capacitor banks\n## Training of Engineers & Organizational Capacity Building of DPDC\n## Terminal Points\n## Exclusions\n## Additional responsibilities of the Contractor\n# General Technical REQUIREMENT\n## General Technical Conditions\n## Site Location and Climatic Conditions\n## Main System Parameters\n## Auxiliary Power Supply\n## Applicable Codes & Standard\n## Proven Design\n## Design Improvements\n## Compatibility with Present System & Future Smart Grid\n## Variation in Quantities of Work\n## Assistance by the Employer\n## Training for Employer’s Staff & Technology Transfer\n### Training at Manufacturer’s Premises / Factory\n### Training on Operation & Maintenance at Employer’s Country\n### On the Job Training (OJT)\n## Capitalisation of Capacitor Losses\n### Compensation for Loss beyond Quoted Value\n## Drawings and Documents","[{\"question\":\"What project is covered by this DPDC bidding document volume?\",\"answer\":\"The volume covers construction and augmentation of substation-related works, installation of capacitor banks, and introduction of smart grid capabilities in DPDC’s power system under a turnkey basis approach.\"},{\"question\":\"What types of capacitor banks and equipment are included?\",\"answer\":\"The scope includes 11 kV switched, 33 kV switched, and 11 kV fixed capacitor banks, together with associated equipment and related works.\"},{\"question\":\"Which main topics does Volume 2 cover in the general technical requirements?\",\"answer\":\"It covers general technical conditions, site and climatic conditions, system parameters, auxiliary power supply, applicable codes and standards, proven design and improvements, smart-grid compatibility, training, quality control, tests, tools and spare parts, and guaranteed technical particulars.\"}]","Dhaka Power Distribution Company Limited - DPDC - Bidding Document - Volume 2 - Design, Supply, Installation, Testing and Commissioning of Capacitor Banks | DOCX",1788294464,88]