[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-307675-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-307675-en":127},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","development-upgrades-of-the-atacama-large-millimetersubmillimeter-array-alma-project-proposal-form-template","Development Upgrades of the Atacama Large Millimeter/submillimeter Array (ALMA) - Project Proposal Form - Template","","Project Proposal Form-Template for the NA ALMA Development Program covering development upgrades for the Atacama Large Millimeter/submillimeter Array (ALMA). Includes sections for PI, institution, contacts, co-investigators and collaborators, subcontractors authorization, and a detailed project plan with science case, overview, scope, success measures and risk, deliverables, and site impact statement. Provides a cost and effort breakdown with FTE estimates, budget tables, award pool and maximum allowances for the FY2014 call, cost distribution by fiscal year, and a delivery schedule with milestone-based payment terms.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/forms/","Forms",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/development-upgrades-of-the-atacama-large-millimetersubmillimeter-array-alma-project-proposal-form-template/307675/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/development-upgrades-of-the-atacama-large-millimetersubmillimeter-array-alma-project-proposal-form-template/307675.png","ImageObject",442,249,{"name":42,"@type":43},"River Wang","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-22","2026-09-19",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",8,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What information is required for the Project Proposal form’s key fields?","Question",{"text":63,"@type":64},"The form requires a Project Proposal Title, Principal Investigator, Institution, Address, and PI contact information including telephone number and email address.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What must be included in the project plan section?",{"text":68,"@type":64},"It asks for a science case, project overview and scope, measures of success and risk mitigation process, and project deliverables categorized into hardware, software, services, and documentation, plus an optional site location impact statement.",{"name":70,"@type":61,"acceptedAnswer":71},"How are effort and costs expected to be estimated and organized?",{"text":72,"@type":64},"The offerer must estimate level of effort in Full Time Equivalent (FTE) and provide a cost breakdown with labor, materials & services, travel, and miscellaneous, including total award pool and maximum cost allowances, along with fiscal-year cost distribution and budget summary tables.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},307675,1790710352,{"code":4,"msg":82,"data":83},"success",[84,89,94,99,104,109,113,118,123],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":86,"show_sort_weight":87,"slug":88},11,"Presentations",90,"presentations",{"id":90,"doc_module":22,"doc_module_name":25,"category_name":91,"show_sort_weight":92,"slug":93},12,"Resumes",80,"resumes",{"id":95,"doc_module":22,"doc_module_name":25,"category_name":96,"show_sort_weight":97,"slug":98},14,"Invoices",70,"invoices",{"id":100,"doc_module":22,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},15,"Posters",60,"posters",{"id":105,"doc_module":22,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},16,"Social Media",50,"social-media",{"id":110,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":111,"slug":112},17,40,"forms",{"id":114,"doc_module":22,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},18,"Letters",30,"letters",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":121,"slug":122},21,"Paper Templates",5,"papers-templates",{"id":124,"doc_module":22,"doc_module_name":25,"category_name":125,"show_sort_weight":4,"slug":126},158,"General","general-158",{"code":4,"msg":82,"data":128},{"doc_id":79,"user_id":129,"nickname":42,"user_avatar":130,"doc_module":22,"category_id":110,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":136,"language":137,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":12,"update_tm":141,"read_time":26},1099514067438,"https://ap-avatar.wpscdn.com/avatar/100002539ee87300030?x-image-process=image/resize,m_fixed,w_180,h_180&k=1780474512215547542","Development Upgrades of the Atacama Large Millimeter/submillimeter Array (ALMA)  \nProject Proposal Form-Template  \n\n| Prepared by | Organization | Date |\n| --- | --- | --- |\n| W. Randolph | NA ALMA Dev. Program | 02 May 2013 |\n\n\n| Approvals (Name and Signature) | Organization | Date |\n| --- | --- | --- |\n| A. Wootten | NAASC |  |\n| P. Jewell | NA ALMA Operations |  |\n\n\n| Released by (Name and Signature) | Organization | Date |  |\n| --- | --- | --- | --- |\n| W. Randolph | NA ALMA Dev. Program | William Randolph | Digitally signed by William Randolph\u003Cbr>DN: cn=William Randolph, o=National Radio Astronomy Observatory, ou=North American ALMA Development Program Manager, [email=wrandolp@nrao.edu](email=wrandolp@nrao.edu), c=US Date: 2013.06.03 08:59:40-04'00' |\n\nChange Record  \n\n| Version | Date | Reason |\n| --- | --- | --- |\n| 0.0 | 03 June 2013 | Initial Release |\n|  |  |  |\n|  |  |  |\n\nDelete this entire page from your submitted Project Proposal.  \nDevelopment Upgrades of the Atacama Large Millimeter/submillimeter Array (ALMA)  \nProject Proposal Form  \nPROJECT PROPOSAL TITLE:  \nPRINCIPAL INVESTIGATOR:  \nINSTITUTION:  \nADDRESS:  \nPI CONTACT INFORMATION:  \nTelephone Number  \nEmail address  \n1.0 CO-INVESTIGATOR(S) AND COLLABORATING INSTITUTION(S)  \nName Institution Email / Telephone  \n2.0 SUBCONTRACTORS  \nN.B. Obtain Company and/or Institution authorization to be proposed as a subcontractor prior to completion and sign-off of this Proposal Form.  \n2.1 Company/Institution:  \nAddress:  \nSubcontracted parts and/or services:  \n3.0 PROJECT PLAN  \n3.1 Science Case  \nInsert the scientific rationale (expressed concisely) and anticipated benefits of the proposed Project.  \n3.2 Project Overview  \nInsert a summary statement which describes the proposed Project in its totality, the goal and expected outcomes.  \n3.3 Project Scope  \nInsert a summary statement outlining the Project elements. Define the boundaries of the Project in terms of goals, deliverables, tasks, costs and deadlines.  \n3.4 Project Measures of Success and Risk  \nDescribe the measures of success for this Project. Describe the process to be used to address risk prioritization and mitigation.  \n3.5 Project Deliverables  \nProject deliverables must include:  \n• Monthly “4-square” Progress, Final, and Outcome Reports Insert a brief definition of additional project deliverables:  \n3.5.1 Hardware  \n3.5.2 Software  \n3.5.3 Services  \n3.5.4 Documentation  \n3.6 Site Location Impact Statement (if applicable)  \nInsert a brief description of any new facilities, significant modifications to existing facilities, or use of NRAO facilities, that are required.  \n4.0 LEVEL OF EFFORT AND COST BREAKDOWN  \nThe Offerer shall estimate the level of effort (unit of measure = Full Time Equivalent) to be deployed by the Offerer and Collaborating Institutions/Subcontractors (Table 1.0, items 1 through 4) until completion of the proposed Project, as well as the corresponding total cost to be incurred by the Offerer (Table 2.0).  \nNote the expected contribution from the North American ALMA Development Program in Table 3.0.  \n4.1 Period of Performance  \nDefine the anticipated period of performance (twenty-four months maximum).  \n4.2 Level of Effort:  \nTable 1.0; Offerer’s Labor Estimate.  \n\n| Item | Labor Category | FTE |\n| --- | --- | --- |\n| 1 | Science |  |\n| 2 | Engineering |  |\n| 3 | Management |  |\n| 4 | Other |  |\n|  | Total Labor | 0.00 |\n\n4.3 Cost Breakdown:  \nThe total Award Pool for the FY2014 Call for Development Project Proposals is $4.3M. The total Award Pool amount ($4.3M) will fund all NA ALMA Partnership Project Proposals. The maximum cost allowance for an individual Project Proposal is $1.5M.  \nTable 2.0; Offerer’s Cost Estimate.  \n\n| Item | Cost Category | USD ($) |\n| --- | --- | --- |\n| 1 | Labor |  |\n| 2 | Materials & Services |  |\n| 3 | Travel |  |\n| 4 | Miscellaneous |  |\n| Total Cost ($) |  | 0.00 |\n\nTable 3.0; Total Cost of Project.  \n\n| Project Participants | USD ($) |\n| --- | --- |\n|","cbCailSCJxkBWEjj","https://ap.wps.com/l/cbCailSCJxkBWEjj","pdf",282200,6,"English","# Project Proposal Title\n# Key Personnel and Institutions\n## Co-Investigators and Collaborating Institutions\n## Subcontractors\n# Project Plan\n## Science Case\n## Project Overview\n## Project Scope\n## Project Measures of Success and Risk\n## Project Deliverables\n## Site Location Impact Statement\n# Level of Effort and Cost Breakdown\n## Period of Performance\n## Level of Effort: Table 1.0\n## Cost Breakdown: Tables 2.0 and 3.0\n## Cost Distribution: Table 4.0\n## Budget Summary: Table 5.0\n# Delivery Schedule and Terms of Payment\n## Project Milestone and Payment Schedule","[{\"question\":\"What information is required for the Project Proposal form’s key fields?\",\"answer\":\"The form requires a Project Proposal Title, Principal Investigator, Institution, Address, and PI contact information including telephone number and email address.\"},{\"question\":\"What must be included in the project plan section?\",\"answer\":\"It asks for a science case, project overview and scope, measures of success and risk mitigation process, and project deliverables categorized into hardware, software, services, and documentation, plus an optional site location impact statement.\"},{\"question\":\"How are effort and costs expected to be estimated and organized?\",\"answer\":\"The offerer must estimate level of effort in Full Time Equivalent (FTE) and provide a cost breakdown with labor, materials \\u0026 services, travel, and miscellaneous, including total award pool and maximum cost allowances, along with fiscal-year cost distribution and budget summary tables.\"}]","Development Upgrades of the Atacama Large Millimeter/submillimeter Array (ALMA) - Project Proposal Form - Template | PDF",1789853075]