[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-253513-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-253513-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","desk-top-feasibility-report-sez-solar-farm-planning-document","DESK-TOP FEASIBILITY REPORT - SEZ Solar Farm - Planning Document","","A desk-top feasibility planning report for the SEZ Solar Farm, dated 1 March 2024, outlining project governance and document control for review and approval prior to issue. It addresses the national energy context marked by operational challenges affecting economic priorities, electricity demand pressure, and ongoing load-shedding impacts. The report frames the rationale for renewable energy as a sustainable response, and structures analysis to cover background and description, market demand, technical description, implementation planning, capability, costs, benefits and investment appraisal, risks, assumptions and ethical considerations, and final conclusions and recommendations.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/presentations/","Presentations",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/desk-top-feasibility-report-sez-solar-farm-planning-document/253513/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/desk-top-feasibility-report-sez-solar-farm-planning-document/253513.png","ImageObject",442,249,{"name":42,"@type":43},"Aria","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-31","2026-09-13",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",11,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the purpose of this desk-top feasibility report for the SEZ Solar Farm?","Question",{"text":63,"@type":64},"The report provides a structured planning assessment for the SEZ Solar Farm and includes governance elements to ensure review and approval under document control before release.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"How does the report describe South Africa’s energy and economic context?",{"text":68,"@type":64},"It outlines operational challenges faced by Eskom, unmet electricity demand, reliance on load shedding, and the associated economic impacts over the decade.",{"name":70,"@type":61,"acceptedAnswer":71},"What areas does the report cover to evaluate the SEZ Solar Farm project?",{"text":72,"@type":64},"It includes background and project description, energy outlook, market demand, technical description, implementation plans, organizational capability, cost and budget requirements, benefits and investment appraisal, high-level risks, assumptions and limitations, and concluding recommendations.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},253513,1791719789,{"code":4,"msg":82,"data":83},"success",[84,87,92,97,102,107,112,117,122],{"id":55,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":85,"slug":86},90,"presentations",{"id":88,"doc_module":22,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},12,"Resumes",80,"resumes",{"id":93,"doc_module":22,"doc_module_name":25,"category_name":94,"show_sort_weight":95,"slug":96},14,"Invoices",70,"invoices",{"id":98,"doc_module":22,"doc_module_name":25,"category_name":99,"show_sort_weight":100,"slug":101},15,"Posters",60,"posters",{"id":103,"doc_module":22,"doc_module_name":25,"category_name":104,"show_sort_weight":105,"slug":106},16,"Social Media",50,"social-media",{"id":108,"doc_module":22,"doc_module_name":25,"category_name":109,"show_sort_weight":110,"slug":111},17,"Forms",40,"forms",{"id":113,"doc_module":22,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},18,"Letters",30,"letters",{"id":118,"doc_module":22,"doc_module_name":25,"category_name":119,"show_sort_weight":120,"slug":121},21,"Paper Templates",5,"papers-templates",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":4,"slug":125},158,"General","general-158",{"code":4,"msg":82,"data":127},{"doc_id":79,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":55,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":135,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":140,"read_time":141},2336464648322,"https://ap-avatar.wpscdn.com/avatar/2200025388227c56fec?_k=1778556882303663488","Planning Document: DESK-TOP FEASIBILITY REPORT  \nSEZ SOLAR FARM  \n1 March 2024  \nDOCUMENT INFORMATION SHEET  \nTitle of Document  \nType of Document Report Number Prepared by Typed by  \nBusiness Unit  \nPrepared for Date of Issue  \n: Desk-top Feasibility Report ~~ ~~ SEZ Solar Farm: Planning Document  \n: CDC-BD-LED-005-24  \n: Nolusindiso Jonas  \n: Nolusindiso Jonas & Duane Mouton: Business Development  \n: CDC  \n: 1 March 2024  \nCopyright  \nAll rights reserved. No part of this document may be reproduced or distributed in any form or by any means, electronic, mechanical, photocopying or recording or otherwise, or stored in a database or retrieval system, without the prior written permission of the Coega Development Corporation (Pty) Ltd. ©  \nCoega Development Corporation Business Development  \nCoega IDZ and Port Zone Development and Operations  \nDOCUMENT CONTROL SHEET  \nThe purpose of this form is to ensure that documents are reviewed and approved prior to issue. The form is to be bound into the front of all documents released by the CDC.  \n\n| PROJECT NAME | : | SEZ Solar Farm |\n| --- | --- | --- |\n| DOCUMENT TITLE | : | DESK-TOP FEASIBILITY REPORT SEZ SOLAR FARM |\n| DOCUMENT No. | : | REF. NO: CDC-BD-LED-005-24 |\n\nSIGNING OF THE ORIGINAL DOCUMENT  \nWe, the undersigned, accept this document as a stable work product to be placed under formal change control as described by the Change Control Procedure document.  \n\n| ORIGINAL | Prepared by | Reviewed by | Approved by |\n| --- | --- | --- | --- |\n\n\n| Date:\u003Cbr>1 March 2024 | Name:\u003Cbr>Nolusindiso Jonas | Name:\u003Cbr>Duane Mouton | Name:\u003Cbr>Asanda Xawuka |\n| --- | --- | --- | --- |\n|  | \u003Cbr>\u003Cbr>| | Signature:\u003Cbr>|\n\n| Distribution: | CDC |\n| --- | --- |\n\nREVISION CHART  \n\n| REVISION 1 | Name: | Name: | Name: |\n| --- | --- | --- | --- |\n| Date: | Signature: | Signature: | Signature: |\n| Distribution: |  |  |  |\n\n\n| REVISION 2 | Name: | Name: | Name: |\n| --- | --- | --- | --- |\n| Date: | Signature: | Signature: | Signature: |\n\n\n| REVISION 3 | Name: | Name: | Name: |\n| --- | --- | --- | --- |\n| Date: | Signature: | Signature: | Signature: |\n\nThis document, and the information or advice which it contains, is provided by the Centre of Excellence Business Unit solely for the use by the Coega Development Corporation (Pty) Ltd and for reliance by its Executive Management and the Board in performanc  \nDESK-TOP FEASIBILITY REPORT TEMPLATE ~~ ~~ APM2  \n(Planning Document)  \nTABLE OF CONTENTS  \n1 EXECUTIVE SUMMARY .................................................................................................................... 1  \n2 PREAMBLE.........................................................................................................................................2  \n3 BACKGROUND & DESCRIPTION OF THE PROJECT .....................................................................3  \n3.1 Energy outlook .................................................................................................................................3  \n3.2 Recent developments in the SA context.........................................................................................7  \n3.3 Project overview..............................................................................................................................8  \n3.3.1 Market demand........................................................................................................................9  \n3.3.2 Technical description .............................................................................................................10  \n4 PURPOSE AND ALIGNMENT WITH CORPORATE OBJECTIVES ................................................11  \n5 PROJECT IMPLEMENTATION PLANS ...........................................................................................12  \n6 CDC CAPABILITY AND CAPACITY TO IMPLEMENT THE PROJECT...........................................12  \n7 COST IMPLICATIONS AND BUDGET REQUIREMENTS ....................................","cbCaiekNpZie2EUQ","https://ap.wps.com/l/cbCaiekNpZie2EUQ","pdf",1372522,22,"English","# 1 EXECUTIVE SUMMARY\n# 2 PREAMBLE\n# 3 BACKGROUND & DESCRIPTION OF THE PROJECT\n## 3.1 Energy outlook\n## 3.2 Recent developments in the SA context\n## 3.3 Project overview\n## 3.3.1 Market demand\n## 3.3.2 Technical description\n# 4 PURPOSE AND ALIGNMENT WITH CORPORATE OBJECTIVES\n# 5 PROJECT IMPLEMENTATION PLANS\n# 6 CDC CAPABILITY AND CAPACITY TO IMPLEMENT THE PROJECT\n# 7 COST IMPLICATIONS AND BUDGET REQUIREMENTS\n# 8 BENEFITS AND INVESTMENT APPRAISAL OF THE PROJECT\n# 9 IDENTIFICATION OF HIGH LEVEL RISKS\n# 10 ASSUMPTIONS, LIMITATIONS, CONSTRAINTS AND ETHICAL CONSIDERATIONS\n# 11 SUMMARY AND CONCLUSIONS\n# 12 RECOMMENDATIONS","[{\"question\":\"What is the purpose of this desk-top feasibility report for the SEZ Solar Farm?\",\"answer\":\"The report provides a structured planning assessment for the SEZ Solar Farm and includes governance elements to ensure review and approval under document control before release.\"},{\"question\":\"How does the report describe South Africa’s energy and economic context?\",\"answer\":\"It outlines operational challenges faced by Eskom, unmet electricity demand, reliance on load shedding, and the associated economic impacts over the decade.\"},{\"question\":\"What areas does the report cover to evaluate the SEZ Solar Farm project?\",\"answer\":\"It includes background and project description, energy outlook, market demand, technical description, implementation plans, organizational capability, cost and budget requirements, benefits and investment appraisal, high-level risks, assumptions and limitations, and concluding recommendations.\"}]","DESK-TOP FEASIBILITY REPORT - SEZ Solar Farm - Planning Document | PDF",1789266534,8]