[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-165197-en":3,"doc-seo-165197-105":30,"detail-sidebar-cat-1-en-105":91},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":4,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":15,"update_tm":28,"read_time":29},165197,137441390410,"Hazel","https://ap-avatar.wpscdn.com/avatar/2000252f4ab5702993?_k=1776741390130283984",1,11,"Presentations","DESIGN QUALITY MANAGEMENT PLAN - Quality Management Plan (QMP) - Template","Design Quality Management Plan (QMP) template for the Design phase, providing clear governance for quality management roles, responsibilities, and authority. Establishes minimum quality standards, defines Quality Control, Quality Assurance, and Quality Verification activities, and links them to appropriate organizational oversight. Includes a structured approach to periodic management reviews, quality records in electronic storage with retention requirements, continuous improvement and lessons learned, and mandatory quality training, with an appendix QA/QC matrix for scheduling deliverables efficiently.","\u0003Quality Management Plan Template\u0004\n\u00032/21/2024\u0004\nDESIGN QUALITY MANAGEMENT PLAN\nQuality Management Plan (QMP)\nThis QMP follows the \u0013 HYPERLINK \"https://wsdot.wa.gov/publications/fulltext/ProjectDev/PSEProgram/Quality-Management-Guide-for-PSE.pdf\" \u0014WSDOT Quality Management Guidance for Design and PS&E\u0015 document, and will use the checklists, as appropriate for the project.\nThe objectives of this Design Phase QMP are to:\nDefine roles and responsibilities for quality management.\nProvide a minimum quality standard for the team.\nDocument processes and procedures of deliverables.\nPromote continuous improvement.\nReview the project WBS work elements and identify the applicable standards for each product, process, service, and deliverable.\nAppropriately scale the QMP to fit the project.\nQuality Management Authority, Roles, and Responsibilities\nAsst. State Design Egr. \tUltimate Authority for the QMP.\nProject Engineer \tResponsible for ensuring that the appropriate resources are available.\nProject Manager \tUltimate responsibility and accountability for the QMP. Responsible for ensuring that a right-sized QMP is developed, approved, implemented and updated.\nTask Leads/SMEs \tResponsible for quality control and accountable for all matters relating to performance and compliance with the requirements of the QMP.\nQuality Control & Quality Assurance\nQuality Control (QC) – actions at the production and administrative levels, under the jurisdiction of the Project Engineer, to produce deliverables that meet the specified performance requirements.\nQuality Assurance (QA) – actions at management levels under the jurisdiction of the Project Engineer, to observe project processes and ensure prudent quality control procedures are in place and are being carried out in accordance with the QMP.\nQuality Verification (QV) – actions employed at HQ Project Development Division and Region, under the jurisdiction of the State Design Engineer, or designee, to selectively review final products to ensure a QMP was implemented; the appropriate project development process was followed and reflected in the final contract document.\nQuality Management Reviews\nPeriodic management reviews provide a structured forum for management to ensure its continuing suitability, adequacy, and effectiveness.\nManagement reviews include assessment of opportunities for improvement and the need for changes to the QMP, including quality procedures, quality policy, and quality objectives. Records of management reviews are maintained.\nReviews to be scheduled:\nMonthly status and quarterly reviews will be communicated\nPlans will be reviewed to establish consistency in the documentation prior to the Ad date\nScope, Schedule, and Budget will be reviewed periodically for progress\nQuarterly review\nStatus reviews\nMilestone reviews\nDeliverable reviews\nCustomer feedback\nProcess reviews\nCommunications\nThe project team are committed to implementing and maintaining the QMP and continually improving the effectiveness through the following:\nCommunicating to the extended project team the importance of meeting statutory, regulatory, and third-party requirements\nEstablishing effective communication about the QMP by ensuring that responsibilities and authorities are defined and communicated\nQuality Records\nQuality records are maintained in electronic format and stored in the project file storage system to show the achievement of quality objectives and the appropriate functioning of the QMP.\nQuality records will follow the approved file-naming convention for the Program.\nAll quality records are electronically stored and retained in such a way that they are readily retrievable and recoverable.\nRetention times of quality records are established and recorded.\nContinuous Improvement & Lessons Learned\nBased on the results of project meetings, value engineering studies, management reviews, and various other opportunities, a list of lessons learned will be captured and shared with the task leads for dissemination througho","cbCaijYnKt2WlGgf","https://ap.wps.com/l/cbCaijYnKt2WlGgf","docx",115635,4,"English","en",105,"# Quality Management Plan (QMP)\n## Objectives of the Design Phase QMP\n## Quality Management Authority, Roles, and Responsibilities\n## Quality Control, Quality Assurance, and Quality Verification\n## Quality Management Reviews\n## Communications\n## Quality Records\n## Continuous Improvement & Lessons Learned\n## Quality Training\n# Appendix A\n## Quality Control / Quality Assurance Matrix","[{\"question\":\"What are the main objectives of this Design Phase QMP?\",\"answer\":\"The plan defines roles and responsibilities, sets minimum quality standards, documents processes for deliverables, promotes continuous improvement, and scales the QMP to match project needs.\"},{\"question\":\"How do Quality Control (QC), Quality Assurance (QA), and Quality Verification (QV) differ?\",\"answer\":\"QC focuses on production and administrative actions to meet performance requirements. QA covers management-level observation of processes to ensure prudent QC is in place. QV selectively reviews final products to confirm the QMP and required project development process were followed.\"},{\"question\":\"How are quality records handled and retained in this QMP?\",\"answer\":\"Quality records are maintained electronically in the project file storage system using the approved file-naming convention, and kept in a way that they are readily retrievable and recoverable, with retention times established and recorded.\"}]","DESIGN QUALITY MANAGEMENT PLAN - Quality Management Plan (QMP) - Template | DOCX",1788167769,2,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":14,"keywords":34,"description":15,"schema_data":35,"social_meta":86,"head_meta":88,"extra_data":90,"updated_unix":28},"design-quality-management-plan-quality-management-plan-qmp-template","",{"@graph":36,"@context":85},[37,52,68],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,47,50],{"item":41,"name":42,"@type":43,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":29},"https://docshare.wps.com/template/","Template",{"item":48,"name":13,"@type":43,"position":49},"https://docshare.wps.com/template/presentations/",3,{"item":51,"name":14,"@type":43,"position":21},"https://docshare.wps.com/template/design-quality-management-plan-quality-management-plan-qmp-template/165197/",{"url":51,"name":14,"@type":53,"author":54,"headline":14,"publisher":56,"fileFormat":59,"inLanguage":23,"description":15,"dateModified":60,"datePublished":61,"encodingFormat":59,"isAccessibleForFree":62,"interactionStatistic":63},"DigitalDocument",{"name":9,"@type":55},"Person",{"url":41,"name":57,"@type":58},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-05","2026-08-31",true,{"@type":64,"interactionType":65,"userInteractionCount":67},"InteractionCounter",{"@type":66},"ViewAction",6,{"@type":69,"mainEntity":70},"FAQPage",[71,77,81],{"name":72,"@type":73,"acceptedAnswer":74},"What are the main objectives of this Design Phase QMP?","Question",{"text":75,"@type":76},"The plan defines roles and responsibilities, sets minimum quality standards, documents processes for deliverables, promotes continuous improvement, and scales the QMP to match project needs.","Answer",{"name":78,"@type":73,"acceptedAnswer":79},"How do Quality Control (QC), Quality Assurance (QA), and Quality Verification (QV) differ?",{"text":80,"@type":76},"QC focuses on production and administrative actions to meet performance requirements. QA covers management-level observation of processes to ensure prudent QC is in place. QV selectively reviews final products to confirm the QMP and required project development process were followed.",{"name":82,"@type":73,"acceptedAnswer":83},"How are quality records handled and retained in this QMP?",{"text":84,"@type":76},"Quality records are maintained electronically in the project file storage system using the approved file-naming convention, and kept in a way that they are readily retrievable and recoverable, with retention times established and recorded.","https://schema.org",{"og:url":51,"og:type":87,"og:title":14,"og:site_name":57,"og:description":15},"article",{"robots":89,"canonical":51},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":92},[93,96,101,106,111,116,121,126,131],{"id":12,"doc_module":11,"doc_module_name":46,"category_name":13,"show_sort_weight":94,"slug":95},90,"presentations",{"id":97,"doc_module":11,"doc_module_name":46,"category_name":98,"show_sort_weight":99,"slug":100},12,"Resumes",80,"resumes",{"id":102,"doc_module":11,"doc_module_name":46,"category_name":103,"show_sort_weight":104,"slug":105},14,"Invoices",70,"invoices",{"id":107,"doc_module":11,"doc_module_name":46,"category_name":108,"show_sort_weight":109,"slug":110},15,"Posters",60,"posters",{"id":112,"doc_module":11,"doc_module_name":46,"category_name":113,"show_sort_weight":114,"slug":115},16,"Social Media",50,"social-media",{"id":117,"doc_module":11,"doc_module_name":46,"category_name":118,"show_sort_weight":119,"slug":120},17,"Forms",40,"forms",{"id":122,"doc_module":11,"doc_module_name":46,"category_name":123,"show_sort_weight":124,"slug":125},18,"Letters",30,"letters",{"id":127,"doc_module":11,"doc_module_name":46,"category_name":128,"show_sort_weight":129,"slug":130},21,"Paper Templates",5,"papers-templates",{"id":132,"doc_module":11,"doc_module_name":46,"category_name":133,"show_sort_weight":4,"slug":134},158,"General","general-158"]