[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-243193-105":53,"doc-detail-243193-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","design-build-change-order-form","Design-Build Change Order Form","","This document is the Design-Build Change Order Form (Document No. 500-D2, Third Edition, 2022) by the Design-Build Institute of America. It is designed for use with DBIA Document No. 535, the Standard Form of General Conditions of Contract Between Owner and DesignBuilder, and in accordance with Article 6.7 of the General Conditions of Contract. The form allows for the modification of the Agreement's Scope of Work, Contract Price, and Contract Time. It includes fields for a Change Order Number, Effective Date, Project details, Owner and Design-Builder information, the scope of the change, and adjustments to the contract price and completion date. The form requires execution by both the Owner and the Design-Builder and becomes a Contract Document upon signing. The document also provides contact information for the Design-Build Institute of America, including its address, phone number, and email. A license for use of this document is valid for one year from the date of purchase, with renewal options available via the DBIA store.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/design-build-change-order-form/243193/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/design-build-change-order-form/243193.png","ImageObject",442,249,{"name":88,"@type":89},"Eden","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-14","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",8,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is the purpose of the Design-Build Change Order Form?","Question",{"text":109,"@type":110},"The purpose of this form is to document and agree upon modifications to the original contract's Scope of Work, Contract Price, and Contract Time between the Owner and the Design-Builder.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What information is required on the Change Order Form?",{"text":114,"@type":110},"The form requires details such as the Change Order Number, Effective Date, Project information, Owner and Design-Builder identification, the scope of the change, and adjustments to the contract price and time. Signatures of both parties are also mandatory.",{"name":116,"@type":107,"acceptedAnswer":117},"What document should this Change Order Form be used with?",{"text":118,"@type":110},"This form is designed for use with DBIA Document No. 535, the Standard Form of General Conditions of Contract Between Owner and DesignBuilder, and in accordance with Article 6.7 of the General Conditions of Contract.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},243193,1791223921,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":76,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":9},1374391974468,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","DBIA Contract Document \\#500-D2  \nDesign-Build  \nChange Order Form  \nDocument No . 500-D2  \nThird Edition, 2022  \n© Design-Build Institute of America Washington, D.C.  \nDesign-Build Change Order Form  \nFor use with DBIA Document No. 535 Standard Form of General Conditions of Contract Between Owner and DesignBuilder and in accordance with Article 6.7 of the General Conditions of Contract.  \n\n| Change Order Number: | Change Order Effective Date:\u003Cbr>(date when executed by both parties) |\n| --- | --- |\n| Project: | Design-Builder’s Project No: |\n|  | Date of Agreement: |\n| Owner: | Design-Builder: |\n\nScope of the Change:  \n\n| Original Contract Price: $  \u003Cbr>Net Change by Previous Change Order No(s) : to: $  \u003Cbr>This Change Order Increase/Decrease (attach breakdown): $  \u003Cbr>New Contract Price: | $ |  |\n| --- | --- | --- |\n|  |  |  |\n| Original Contract Completion Date:   20 \u003Cbr>Adjustments by Change Order No(s) to:   (calendar days)\u003Cbr>This Change Order Contract Time Increase/Decrease:   (calendar days)\u003Cbr>Revised Substantial Completion Date: |  | 20  |\n|  |  |  |\n\nBy executing this Change Order, Owner and Design-Builder agree to modify the Agreement’s Scope of Work, Contract Price and Contract Time as stated above. Upon execution, this Change Order becomes a Contract Document issued in accordance with DBIA Document No. 535, Standard Form of General Conditions of Contract Between Owner and DesignBuilder, (2022 Edition) .  \nOWNER: DESIGN-BUILDER:  \nBy:   By:    \nPrinted Name:   Printed Name:    \nTitle:   Title:    \nDate:   Date:    \nThe license for use of this document expires 1 year from the date of purchase.  \nTo renew your license, visit [store.dbia.org](store.dbia.org).  \nQuestions? We’re here to help.  \nContact us  \nDesign-Build Institute of America  \n1001 Pennsylvania Ave. NW, Suite 410 Washington, DC 20004  \n(202) 682-0110  \n[dbia@dbia.org](dbia@dbia.org)","cbCainFwiOaaojpN","https://ap.wps.com/l/cbCainFwiOaaojpN","pdf",929926,"English","# Design-Build Change Order Form\n## Scope of the Change","[{\"question\":\"What is the purpose of the Design-Build Change Order Form?\",\"answer\":\"The purpose of this form is to document and agree upon modifications to the original contract's Scope of Work, Contract Price, and Contract Time between the Owner and the Design-Builder.\"},{\"question\":\"What information is required on the Change Order Form?\",\"answer\":\"The form requires details such as the Change Order Number, Effective Date, Project information, Owner and Design-Builder identification, the scope of the change, and adjustments to the contract price and time. Signatures of both parties are also mandatory.\"},{\"question\":\"What document should this Change Order Form be used with?\",\"answer\":\"This form is designed for use with DBIA Document No. 535, the Standard Form of General Conditions of Contract Between Owner and DesignBuilder, and in accordance with Article 6.7 of the General Conditions of Contract.\"}]","Design-Build Change Order Form | PDF",1789201099]