[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-241529-105":53,"doc-detail-241529-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","daily-weekly-and-monthly-inspection-report-forms-erosion-sedimentation-and-pollution-control","Daily, Weekly, and Monthly Inspection Report Forms - Erosion, Sedimentation, and Pollution Control","","Inspection report forms for daily, weekly, and monthly compliance checks during on-site construction activities. Covers project information, inspection observations, and whether rainfall over 0.5 inches triggers required inspection. Includes specific checklists for petroleum product storage areas, vehicle entrances/exits, erosion and sedimentation controls, discharge locations, and pollutant control measures. Provides sections to record corrective actions, dates, and any required revisions to the Erosion, Sedimentation and Pollution Control Plan, plus a daily rainfall log and an inspection summary table.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/daily-weekly-and-monthly-inspection-report-forms-erosion-sedimentation-and-pollution-control/241529/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/daily-weekly-and-monthly-inspection-report-forms-erosion-sedimentation-and-pollution-control/241529.png","ImageObject",442,249,{"name":88,"@type":89},"Aurora","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-12","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",9,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What triggers additional inspection requirements related to rainfall?","Question",{"text":109,"@type":110},"Rainfall within the past 24 hours is checked, and if it is greater than 0.5 inches, inspection is required (including weekly inspection within 24 hours of a 0.5-inch or greater storm event).","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"Which areas are evaluated for erosion, sedimentation, and pollution control compliance?",{"text":114,"@type":110},"Forms include checks for petroleum product storage areas, vehicle entrances and exits (tracking sediment), disturbed areas not finally stabilized, material storage areas exposed to precipitation, discharge locations or points, and whether erosion control measures prevent impacts to receiving waters.",{"name":116,"@type":107,"acceptedAnswer":117},"What should be recorded when deficiencies are found?",{"text":118,"@type":110},"Deficiencies must be described along with corrective actions that must be taken, including corrective action taken and the associated date. If plan updates are required, the form captures the date of the Erosion, Sedimentation and Pollution Control Plan revision.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},241529,1789176954,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":101,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":126,"read_time":76},4810365810221,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","# Daily Inspection Report\n\nInspection performed by certified personnel each day construction activity occurs on-site  \n\n| Project Information   |  |\n| --- | --- |\n| Date:   | Project Name:   |\n| Project Location:   |  |\n| Inspection Observations   |  |\n| Rainfall within  \u003Cbr>past 24 hours (inches):   | Is rainfall greater than 0.5”?  \u003Cbr>Inspection Required □   |\n| Inspection Observations   |  |\n| Petroleum Product Storage Areas:  \u003Cbr>Are all of the temporary and permanent controls contained in Plan in place?□Yes□No  \u003Cbr>If no,describe the location(s)of deficiencies and corrective actions that must be taken.   |  |\n| Vehicle Entrances and Exits:  \u003Cbr>Is there tracking of sediment from locations where vehicles enter and leave the project?□Yes□No  \u003Cbr>If yes,describe the location(s)and the corrective actions that must be taken.   |  |\n| Other Observations   |  |\n| Is an Erosion,Sedimentation and  \u003Cbr>Pollution Control Plan revision required?   □Yes□No Date of revision:   |  |\n| Corrective Actions and Date:   |  |\n\n## Daily Rainfall Log\n\nProject Name:                                                                            \nProject Location:                              \nMonth:  \nYear:                      \nType of Device Used to Measure Rainfall:                      \nDevice Location:                                    \nDaily Rainfall Monitoring Data  \n\n| Date   | Rainfall Amount,Inches   | Time   | Reported By   |\n| --- | --- | --- | --- |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n\n## Site Inspection Report\n\nErosion and Sedimentation Inspection Report  \nMaintain Reports on-site  \n\n|  |  |  |\n| --- | --- | --- |\n| Site:   | Date:   | Time:   |\n| Inspector:   | Accompanied By:   |  |\n| Stage of Construction:   |  |  |\n|  |  |  |\n| Site:   |  |  |\n| Observation:   |  |  |\n|  |  |  |\n|  |  |  |\n| Recommendations:   |  |  |\n|  |  |  |\n|  |  |  |\n| Contractors's Corrective Action (and Date):   |  |  |\n|  |  |  |\n| Site:   |  |  |\n| Observation:   |  |  |\n|  |  |  |\n|  |  |  |\n| Recommendations:   |  |  |\n|  |  |  |\n|  |  |  |\n| Contractors's Corrective Action(and Date):_____   |  |  |\n|  |  |  |\n|  |  |  |\n\n## Inspection Summary\n\nLDA No.            \nSite:                                                    \n\n| Map Site   | Violation   | First Date   | Date  \u003Cbr>Corrected   |\n| --- | --- | --- | --- |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n\n## Weekly Inspection Report\n\nInspection performed by cerified personnel at least once every seven calendar days and within24 hours of the end of a storm that is 0.5 inches or greater  \n\n| Project Information   |  |\n| --- | --- |\n| Date:   | Project Name:   |\n| Project Location:   |  |\n| Name of Inspector:   |  |\n| Inspection Event   |  |\n| Regular weekly  \u003Cbr>inspection:   | Inspection within 24 hours  \u003Cbr>of 0.5”storm event   |\n| Inspection Observations   |  |\n| Disturbed areas that have not undergone final stabilization:  \u003Cbr>Areall of the temporary and permanent controls contained in Plan in place and properly maintained?□Yes□No  \u003Cbr>If no,describe the location(s)of deficiencies and corrective actions that must be taken.  \u003Cbr>Corrective Action Taken and Date:   |  |\n| Material storage areas exposed to precipitation:  \u003Cbr>Are all of the temporary and permanent controls contained in Plan in place and properly maintained?□Yes□No  \u003Cbr>If no,describe the location(s","cbCailiywpV4BBOT","https://ap.wps.com/l/cbCailiywpV4BBOT","pdf",138934,"English","# Daily Inspection Report\n## Daily Rainfall Log\n## Site Inspection Report\n## Inspection Summary\n# Weekly Inspection Report\n## Other observations\n# Monthly Inspection Report","[{\"question\":\"What triggers additional inspection requirements related to rainfall?\",\"answer\":\"Rainfall within the past 24 hours is checked, and if it is greater than 0.5 inches, inspection is required (including weekly inspection within 24 hours of a 0.5-inch or greater storm event).\"},{\"question\":\"Which areas are evaluated for erosion, sedimentation, and pollution control compliance?\",\"answer\":\"Forms include checks for petroleum product storage areas, vehicle entrances and exits (tracking sediment), disturbed areas not finally stabilized, material storage areas exposed to precipitation, discharge locations or points, and whether erosion control measures prevent impacts to receiving waters.\"},{\"question\":\"What should be recorded when deficiencies are found?\",\"answer\":\"Deficiencies must be described along with corrective actions that must be taken, including corrective action taken and the associated date. If plan updates are required, the form captures the date of the Erosion, Sedimentation and Pollution Control Plan revision.\"}]","Daily, Weekly, and Monthly Inspection Report Forms - Erosion, Sedimentation, and Pollution Control | PDF"]