[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-242557-105":53,"doc-detail-242557-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","d22-regio1st-planning-framework-guiding-document-decision-support-web-based-tool-and-guiding-document","D2.2 Regio1st Planning Framework Guiding Document - Decision Support Web-based tool and guiding document","","Decision Support Web-based tool and guiding document for the REGIO1st project, delivering a structured planning approach to regional energy planning. It explains what regional energy planning is and how the Energy Efficiency First (EE1st) principle guides policymakers to prioritise demand-side measures before new energy supply investments. The workflow covers preparation, stakeholder engagement, energy objective review, system assessment, cost-benefit and feasibility analysis, action definition, and implementation with monitoring and continuous improvement. It also introduces the project tools supporting stakeholder analysis, target mapping, ranking priorities, data collection, and MCDA.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/d22-regio1st-planning-framework-guiding-document-decision-support-web-based-tool-and-guiding-document/242557/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/d22-regio1st-planning-framework-guiding-document-decision-support-web-based-tool-and-guiding-document/242557.png","ImageObject",442,249,{"name":88,"@type":89},"Quinn","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-11","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":73},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is regional energy planning in the document?","Question",{"text":108,"@type":109},"Regional energy planning is described as a collaborative, systematic process to develop and implement regional energy strategies. It accounts for local needs, resources, and opportunities to optimise the energy system and support energy and climate objectives.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"How does the Energy Efficiency First (EE1st) principle influence planning decisions?",{"text":113,"@type":109},"The EE1st principle prioritises implementing energy efficiency measures before investing in new energy supply infrastructure or capacity. In regional planning, it directs planners to consider demand-side measures first, such as improving building efficiency and promoting efficient appliances, before exploring supply options.",{"name":115,"@type":106,"acceptedAnswer":116},"What are the main stages included in the planning workflow?",{"text":117,"@type":109},"The document outlines eight stages: preparation; engaging stakeholders and building partnerships; reviewing energy objectives and targets; exploring the current regional energy system; cost-benefit analysis; assessing feasibility of least-cost solutions; defining actions and developing the regional energy plan; and implementation, monitoring, and review.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},242557,1791748366,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":135,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":141,"read_time":142},962075114765,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","1  \nPlanning Framework  \nGuiding Document  \nCo-funded by the European Union under project n°101076088 . Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or CINEA. Neither the European Union nor the granting authority can be held responsible for them.  \n| Project Acronym | LIFE21-CET-LOCAL-REGIO1ST |\n| --- | --- |\n| Project Name | Implementing the Energy Efficiency First Principle in Regional Planning |\n| Project Coordinator | Institute for European Energy and Climate Policy (IEECP) |\n| Project Duration | 36 months |\n| Website | [https://fedarene.org/project/regio1st/](https://fedarene.org/project/regio1st/) |\n\n\n| Deliverable No. | D2.2 |\n| --- | --- |\n| Deliverable Name | Decision Support Web-based tool and guiding document |\n| Dissemination Level | Public |\n| Work Package | WP2 |\n| Lead beneficiary | ICCS |\n| Author(s) | George Konstantopoulos, Andriana Stavrakaki, Hera Neofytou (ICCS)\u003Cbr>Tim Mandel, Songmin Yu (Fraunhofer ) |\n| Reviewed by | IEECP, FRAUNHOFER |\n| Date | May 2024 |\n\nLegal Notice  \nThe sole responsibility for the content of this publication lies with the authors. It does not necessarily reflect the opinion of the European Union. Neither CINEA nor the European Commission is responsible for any use that may be made of the information contained therein.  \nPublished in May 2024 by Regio1st.  \n©Regio1st, 2024. Reproduction is authorised provided the source is acknowledged.  \nContents  \n1 Introduction ..................................................................................................... 5  \n2 Planning workflow (stages & steps) ...................................................... 13  \nStage 1 Preparation ............................................................................................................... 13  \nStage 2 Engaging stakeholders and building partnerships ....................................... 16  \nStage 3 Reviewing energy objectives and targets ....................................................... 18  \nStage 4 Exploring the current regional energy system .............................................. 20  \nStage 5 Cost-benefit analysis............................................................................................. 22  \nStage 6 Assessing the practical feasibility of least-cost energy solutions .......... 25  \nStage 7 Defining actions and developing the regional energy plan ........................ 27  \nStage 8 Implementation, monitoring and review .......................................................... 29  \n3 REGIO1st Tools .............................................................................................31  \nRoles and Responsibilities Matrix ..................................................................................... 31  \nStakeholder Identification and Analysis Tool .................................................................35  \nStakeholder engagement plan Template ......................................................................... 40  \nNational and Regional Targets Mapping Template ....................................................... 42  \nParticipatory Priorities Ranking Tool ............................................................................... 45  \nEnergy Inventory Data Collection Template ................................................................... 52  \nTechnology Catalogue Tool .................................................................................................. 58  \nCost-Benefit Analysis Tool .................................................................................................. 66  \nMultiple-Criteria Decision Analysis (MCDA) tool ......................................................... 71  \nMonitoring Template .............................................................................................................. 82  \n4 Additional material ...........................................................","cbCaiqtP0I2UPiU6","https://ap.wps.com/l/cbCaiqtP0I2UPiU6","pdf",5527231,7,97,"English","# 1 Introduction\n## What is regional energy planning?\n## What is the Energy Efficiency First Principle and how does it relate to regional energy planning?\n## The REGIO1st project\n# 2 Planning workflow (stages & steps)\n## Stage 1 Preparation\n## Stage 2 Engaging stakeholders and building partnerships\n## Stage 3 Reviewing energy objectives and targets\n## Stage 4 Exploring the current regional energy system\n## Stage 5 Cost-benefit analysis\n## Stage 6 Assessing the practical feasibility of least-cost energy solutions\n## Stage 7 Defining actions and developing the regional energy plan\n## Stage 8 Implementation, monitoring and review\n# 3 REGIO1st Tools\n## Roles and Responsibilities Matrix\n## Stakeholder Identification and Analysis Tool\n## Stakeholder engagement plan Template\n## National and Regional Targets Mapping Template\n## Participatory Priorities Ranking Tool\n## Energy Inventory Data Collection Template\n## Technology Catalogue Tool\n## Cost-Benefit Analysis Tool\n## Multiple-Criteria Decision Analysis (MCDA) tool\n## Monitoring Template\n# 4 Additional material\n# 5 Frequently Asked Questions\n## Next Steps and Continuous Improvement","[{\"question\":\"What is regional energy planning in the document?\",\"answer\":\"Regional energy planning is described as a collaborative, systematic process to develop and implement regional energy strategies. It accounts for local needs, resources, and opportunities to optimise the energy system and support energy and climate objectives.\"},{\"question\":\"How does the Energy Efficiency First (EE1st) principle influence planning decisions?\",\"answer\":\"The EE1st principle prioritises implementing energy efficiency measures before investing in new energy supply infrastructure or capacity. In regional planning, it directs planners to consider demand-side measures first, such as improving building efficiency and promoting efficient appliances, before exploring supply options.\"},{\"question\":\"What are the main stages included in the planning workflow?\",\"answer\":\"The document outlines eight stages: preparation; engaging stakeholders and building partnerships; reviewing energy objectives and targets; exploring the current regional energy system; cost-benefit analysis; assessing feasibility of least-cost solutions; defining actions and developing the regional energy plan; and implementation, monitoring, and review.\"}]","D2.2 Regio1st Planning Framework Guiding Document - Decision Support Web-based tool and guiding document | PDF",1789192040,34]