[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-352475-105":53,"doc-detail-352475-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","critical-lift-plan-bonneville-power-administration","CRITICAL LIFT PLAN - Bonneville Power Administration","","Critical Lift Plan template for recording and reviewing non-routine crane lifts requiring detailed engineering and enhanced safety precautions. Defines “critical lift” criteria including load weight exceeding 75% of rated capacity, restricted view swings/placements, use of multiple cranes, complex rigging, hoisting personnel, or any lift the operator deems critical. Provides structured sections to capture load totals, crane configuration, hoist rope and rigging details, mobile crane placement and site hazards, operator qualifications, pre-lift checklist items, and required signatures.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/critical-lift-plan-bonneville-power-administration/352475/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/critical-lift-plan-bonneville-power-administration/352475.png","ImageObject",442,249,{"name":88,"@type":89},"Adam","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-24","2026-09-22",true,{"@type":98,"interactionType":99,"userInteractionCount":8},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What qualifies as a “critical lift” in this plan?","Question",{"text":108,"@type":109},"A critical lift is any non-routine crane lift needing detailed planning and unusual safety precautions, including lifts with load weight above 75% of rated capacity, restricted operator view swings/placements, multiple-crane lifts, technically difficult rigging, hoisting personnel, or any lift the operator believes should be critical.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"Which information is required for total load calculations?",{"text":113,"@type":109},"The plan collects the load weight and component weights (auxiliary block, main block, lifting beam, sling/shackles, jib/ext., hoist rope, and other items) to compute the total weight, typically in pounds.",{"name":115,"@type":106,"acceptedAnswer":116},"What is included in the pre-lift checklist and who signs the plan?",{"text":117,"@type":109},"The pre-lift checklist covers crane inspection, rigging inspection, crane setup, overhead hazard, swing, counterweight, personnel qualifications, signal person and rigger qualifications, load chart availability, and load test readiness. Signatures include roles such as crane operator, rigger, signal person, lift supervisor, and other designated personnel.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},352475,1791476266,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":8,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":73},1374404737137,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","| | CRITICAL LIFT PLAN\u003Cbr>BONNEVILLE POWER ADMINISTRATION |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| Date: |  |  |  |  |  |  | Prepared By: |  |  |  |  |\n| Location: |  |  |  |  |  |  | Reviewed By: |  |  |  |  |\n| Contract No. |  |  |  |  |  |  | Contractor: |  |  |  |  |\n| DEFINITION: A \"critical lift\" is defined as any non-routine crane lift requiring detailed planning and additional or unusual safety precautions. Critical lifts include: lifts made where the load weight is greater than 75% of the rated capacity of the crane; lifts which require load to be lifted, swung or placed out of the operator's view ; lifts made with more than one crane; lifts involving non-routine/ technically difficult rigging arrangement; hoisting personnel with a crane ; or any lift which the crane operator believes should be critical. |  |  |  |  |  |  |  |  |  |  |  |\n| A. TOTAL LOAD\u003Cbr>1. Load Weight\u003Cbr>2. Wt. of Aux. Block\u003Cbr>3. Wt. of Main Block\u003Cbr>4. Wt. of Lifting Beam\u003Cbr>5. Wt. of Sling/Shackles\u003Cbr>6. Wt. of Jib/Ext.\u003Cbr>7. Wt. of Hoist Rope\u003Cbr>8. Other:\u003Cbr>TOTAL WEIGHT |  | 0.00 |  |  |  | lbs.\u003Cbr>lbs.\u003Cbr>lbs.\u003Cbr>lbs.\u003Cbr>lbs.\u003Cbr>lbs.\u003Cbr>lbs.\u003Cbr>lbs.\u003Cbr>lbs. | E. CRANE PLACEMENT (Mobile Cranes Only)\u003Cbr>1. Maximum Bearing Pressure PSF\u003Cbr>\u003Cbr>Note: Bearing Pressure Calculations will be attached on Page 3.\u003Cbr>2. Ground Conditions Suitable for Load?   YES / NO\u003Cbr>Note: Ground Condition Calculations will be attached on Page 3.\u003Cbr>3. High Voltage or Electrical Hazards?   YES / NO\u003Cbr>Note: If Electrical Hazards are present they must be shown on Page 4.\u003Cbr>4. Obstructions to Lift or Swing?   YES / NO\u003Cbr>Note: If Obstructions are present they must be shown on Page 4.\u003Cbr>5. Travel with Load Required?   YES / NO\u003Cbr>6. Other?   |  |  |  |  |\n| Note: Source of load weight (Drawings, Calcs, etc.) must be attached on Page 2. |  |  |  |  |  |  |  |  |  |  |  |\n| B. CRANE\u003Cbr>1. Type of Crane   \u003Cbr>2. Maximum Crane Capacity  \u003Cbr>3. Radius (Maximum)  \u003Cbr>4. Radius (Minimum)  \u003Cbr>5. Boom Length (Maximum)  \u003Cbr>6. Boom Length (Minimum)  \u003Cbr>7. Crane Capacity (Max Radius)  \u003Cbr>8. Crane Capacity (Min Radius)  \u003Cbr>9. Boom Angle (Maximum)  \u003Cbr>10. Boom Angle (Minimum)  \u003Cbr>11. Gross Load of Crane  \u003Cbr>12. Lift is   % of the Crane's rated capacity\u003Cbr>13. If Jib/Ext. is to be used:\u003Cbr>Length   Offset  \u003Cbr>14. Rated Capacity of Jib/Ext. |  |  |  |  |  | lbs.\u003Cbr>ft.\u003Cbr>ft.\u003Cbr>ft.\u003Cbr>ft.\u003Cbr>lbs.\u003Cbr>lbs.\u003Cbr>deg.\u003Cbr>deg.\u003Cbr>lbs.\u003Cbr>ft.\u003Cbr>ft.\u003Cbr>lbs | F. OPERATOR QUALIFICATIONS\u003Cbr>1. Certified Operator?\u003Cbr>2. Certificates Provided / Available\u003Cbr>3. Certified by Type, Class & Capacity?\u003Cbr>4. Designated in writing by employer: |  |   YES / NOYES / NO   YES / NOYES / NO |  |  |\n|  |  |  |  |  |  |  | G. PRE-LIFT CHECKLIST\u003Cbr>1. Crane Inspected | YES |  | No | NA |\n|  |  |  |  |  |  |  | 2. Rigging Inspected |  |  |  |  |\n|  |  |  |  |  |  |  | 3. Crane Set-up |  |  |  |  |\n|  |  |  |  |  |  |  | 4. Overhead Hazard Check |  |  |  |  |\n|  |  |  |  |  |  |  | 5. Swing Check |  |  |  |  |\n|  |  |  |  |  |  |  | 6. Counterweight Check |  |  |  |  |\n|  |  |  |  |  |  |  | 7. Operator Qualifications |  |  |  |  |\n|  |  |  |  |  |  |  | 8. Signal Person Qualifications |  |  |  |  |\n|  |  |  |  |  |  |  | 9. Rigger Qualifications |  |  |  |  |\n|  |  |  |  |  |  |  | 10. Load Chart in Crane |  |  |  |  |\n|  |  |  |  |  |  |  | 11. Load Test |  |  |  |  |\n| C. HOIST ROPE | Main |  | Aux 1 | Aux 2 |  |  | 12. Tag Lines |  |  |  |  |\n| 1. \\# of Parts\u003Cbr>2. Rope Diameter\u003Cbr>3. Capacity |  |  |  |  |  |  | 13. Wind Conditions |  |  |  |  |\n|  |  |  |  |  |  |  | 14. Traffic Hazard Check |  |  |  |  |\n|  |  |  |  |  |  |  | 15. Site Control |  |  |  |  |\n| D. RIGGING |  |  |  |  |  |  | 16. Signatures |  |  |  |  |\n| 1. Hitch Type(s)  \u003Cbr>2. No. of Slings:   Size:  \u003Cbr>3. Sling Type:  \u003Cbr>4. Sling Assembly Capacity:   lbs.\u003Cbr>5. Shackle Size(s):  \u003Cbr>6. Shackle Rated Capacity(s)   lbs. |  |  |  |  |  |  | H. SIGNATURES |  |  | ","cbCaiqEEmbJaiDTt","https://ap.wps.com/l/cbCaiqEEmbJaiDTt","pdf",1895731,6,"English","# CRITICAL LIFT PLAN\n## Definition of a Critical Lift\n## A. Total Load\n## B. Crane\n## C. Hoist Rope\n## D. Rigging\n## E. Crane Placement (Mobile Cranes Only)\n## F. Operator Qualifications\n## G. Pre-Lift Checklist\n## H. Signatures","[{\"question\":\"What qualifies as a “critical lift” in this plan?\",\"answer\":\"A critical lift is any non-routine crane lift needing detailed planning and unusual safety precautions, including lifts with load weight above 75% of rated capacity, restricted operator view swings/placements, multiple-crane lifts, technically difficult rigging, hoisting personnel, or any lift the operator believes should be critical.\"},{\"question\":\"Which information is required for total load calculations?\",\"answer\":\"The plan collects the load weight and component weights (auxiliary block, main block, lifting beam, sling/shackles, jib/ext., hoist rope, and other items) to compute the total weight, typically in pounds.\"},{\"question\":\"What is included in the pre-lift checklist and who signs the plan?\",\"answer\":\"The pre-lift checklist covers crane inspection, rigging inspection, crane setup, overhead hazard, swing, counterweight, personnel qualifications, signal person and rigger qualifications, load chart availability, and load test readiness. Signatures include roles such as crane operator, rigger, signal person, lift supervisor, and other designated personnel.\"}]","CRITICAL LIFT PLAN - Bonneville Power Administration | PDF",1790099840]