[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-352473-105":53,"doc-detail-352473-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","crane-lifting-plan-template-australia-multi-crane-lift-plan-guide","Crane Lifting Plan Template Australia - Multi-Crane Lift Plan Guide","","Crane lifting plan guidance focused on multi-crane operations, explaining what constitutes a multi-crane lift and how it differs from synchronised crane motions. It details planning fundamentals: documented risk assessment, precise crane capacity and load calculations (including load sharing, centre of gravity, rigging and equipment under the boom), and the need for competent supervision. The plan emphasizes site visits, communication and change control, ground preparation, controlled lift sequencing, and compliance with Australian and New Zealand standards.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/crane-lifting-plan-template-australia-multi-crane-lift-plan-guide/352473/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/crane-lifting-plan-template-australia-multi-crane-lift-plan-guide/352473.png","ImageObject",442,249,{"name":88,"@type":89},"Terk","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-28","2026-09-22",true,{"@type":98,"interactionType":99,"userInteractionCount":20},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is a multi-crane lift and how is it different from synchronised lifting?","Question",{"text":108,"@type":109},"A multi-crane lift is when two or more cranes support a load using components like hooks, slings, shackles, or an equaliser beam. It differs from synchronised lifts, which use electrically or mechanically connected crane motions.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What must be included in a documented lift plan for multi-crane operations?",{"text":113,"@type":109},"The lift plan should specify crane type and size, load weight and dimensions, lift location, identified hazards and mitigation steps, personnel roles, the communication plan, and contingency measures for emergencies. It should also be reviewed and updated when site conditions or loads change, and signed and dated by involved personnel.",{"name":115,"@type":106,"acceptedAnswer":116},"When should a comprehensive lift plan be created?",{"text":117,"@type":109},"A detailed lift plan is required when multiple cranes lift a load at the same time, when workboxes with people inside are lifted, and during bridge installation. It is also necessary for tilt-up panel works and lifting near live power lines.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},352473,1791721888,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":20,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":73,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":9},1099525198933,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","Crane lifting plan template australia  \nCrane lifting plan template doc. Crane association lift plan. Crane lift plan template nz. Lift plan crane.  \nKevin Ball, group safety manager for Smithbridge Group and Standards Australia Committee Member, emphasizes the importance of meticulous planning when executing a multi-crane lift. Such lifts involve multiple cranes working together to support a load, which can amplify the impact of an incident if not properly planned. \"It's crucial to plan any lift carefully, but even more so when there are several cranes involved,\" he stresses. Ball notes that the Australian Standards and international equivalents can be difficult to interpret, and guidelines often differ between states and countries. A multi-crane lift refers to a situation where two or more cranes support a load using hooks, slings, shackles, or an equaliser beam. This type of lift is distinct from synchronised lifts, which involve electrically or mechanically connected crane motions. \"We're focusing on most mobile crane lifts that don't require this level of complexity,\" Ball explains. Hazards associated with multi-crane lifts include inadequate load planning, communication breakdowns, and unintended forces acting on the crane boom. Proper ground preparation is also crucial to prevent compounding ground pressures when multiple cranes are in close proximity. Lift planning is a critical step in ensuring the success of a multi-crane lift. Such operations require skillful supervision and must be preceded by a documented risk assessment that identifies known hazards and outlines relevant controls. A thorough plan is essential before starting any work, particularly when it comes to tandem lifts. The key is to make precise calculations regarding the required capacity of the cranes, taking into account factors such as load share, total weight under the boom head, and percentage factors based on the number of cranes involved. The Crane Industry Council of Australia provides more detailed information on this topic, but it's essential to note that load sharing must be considered in all scenarios. A site visit is also crucial to understand the environment, overhead structures, ground conditions, access, and site restrictions. When developing the lift plan, competent personnel should complete the study, including crane selection criteria. It's vital to select cranes of the same type to avoid a designed lift. The centre of gravity requires special attention, especially for complex structures and loads, when determining crane sizes and load sharing. Load sharing for rigid structures is critical, as the weight transfer when lifting or placing a rigid load is essential. An analysis is required to understand the stiffness – strength of the load to identify the load shift effect if the cranes get out of sync. All hooks, rigging, spreader beams, load equalising devices, and other equipment below the boom head must be included in the load calculations. On-site, it's crucial to review the lift plan with all personnel involved, document any changes, and communicate these changes to all members of the lift team. For Australian-based work, individuals involved in rigging work must hold a High-Risk Intermediate Rigging Licence (RI) . A senior lift supervisor on-site is essential, holding an RI licence as a minimum, to coordinate the lift and maintain clear accountability. The person calling the lift must hold an intermediate rigging qualification as a minimum and stay committed to the communications plan. Ropes are angled vertically, thereby preventing side loading on the boom. It's essential to consider passover load transfers, where one crane lifts a load as it moves forward or backward, allowing another crane to pick up the other end of the load. Similarly, tailing load transfers involve rotating a load from vertical to horizontal or vice versa. Ensure that all movements are done in a single direction and at the same time. For example, when pick-a","cbCairHchICGexA1","https://ap.wps.com/l/cbCairHchICGexA1","pdf",40227,"English","# Multi-crane lift definition and scope\n## Distinction from synchronised lifts\n# Core lift planning requirements\n## Documented risk assessment and supervision\n## Crane selection, load calculations, and centre of gravity\n# On-site execution and controls\n## Site visit, communication plan, and change review\n## Load transfer methods and movement coordination\n# Standards and when a comprehensive lift plan is required","[{\"question\":\"What is a multi-crane lift and how is it different from synchronised lifting?\",\"answer\":\"A multi-crane lift is when two or more cranes support a load using components like hooks, slings, shackles, or an equaliser beam. It differs from synchronised lifts, which use electrically or mechanically connected crane motions.\"},{\"question\":\"What must be included in a documented lift plan for multi-crane operations?\",\"answer\":\"The lift plan should specify crane type and size, load weight and dimensions, lift location, identified hazards and mitigation steps, personnel roles, the communication plan, and contingency measures for emergencies. It should also be reviewed and updated when site conditions or loads change, and signed and dated by involved personnel.\"},{\"question\":\"When should a comprehensive lift plan be created?\",\"answer\":\"A detailed lift plan is required when multiple cranes lift a load at the same time, when workboxes with people inside are lifted, and during bridge installation. It is also necessary for tilt-up panel works and lifting near live power lines.\"}]","Crane Lifting Plan Template Australia - Multi-Crane Lift Plan Guide | PDF",1790099831]