[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-171256-105":3,"detail-sidebar-cat-1-en-105":85,"doc-detail-171256-en":131},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":78,"head_meta":80,"extra_data":82,"updated_unix":84},105,"en","cp3-implementation-measurement-plan","CP3 Implementation & Measurement Plan","","CP3 Implementation & Measurement Plan 指导如何基于项目目标填写 IMP 模板：为每个目标分别建立 Implementation Plan 与 Measurement Plan，并使用 IMP Guidance 文档中的定义与示例。计划需按活动开始日期编排，明确“Intermediary”与“Key”两类输出，并仅对终端输出填写 Anticipated Outcomes。测量部分要求将绩效指标与实施活动逐项对应（含活动编号），设定目标、指标、数据收集方法，覆盖拨款期内所有年份与季度报告所需数据，并在 Capturing Impact 中聚焦系统级影响与精选站点的更深入分解。",{"@graph":14,"@context":77},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/presentations/","Presentations",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/cp3-implementation-measurement-plan/171256/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/cp3-implementation-measurement-plan/171256.png","ImageObject",442,249,{"name":42,"@type":43},"Finn","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-23","2026-09-01",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",13,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69,73],{"name":60,"@type":61,"acceptedAnswer":62},"IMP 中需要为每个目标分别包含哪些表格？","Question",{"text":63,"@type":64},"每个目标都需要创建一份 Implementation Plan 表和一份 Measurement Plan 表，并按模板要求填写。","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Implementation Plan 里“Intermediary”和“Key outputs”的区别是什么？",{"text":68,"@type":64},"Intermediary 输出用于打通后续活动的关键步骤但不直接带来变化；Key outputs 是项目的主要交付物，终端输出才需要在 Anticipated Outcomes 栏填写。",{"name":70,"@type":61,"acceptedAnswer":71},"Measurement Plan 的绩效指标应如何与实施活动对应？",{"text":72,"@type":64},"每条绩效指标需要映射到相关活动，并在 Mapping 中填写对应活动的数值编号（如 1.1.1、1.1.2 等），确保可追溯。",{"name":74,"@type":61,"acceptedAnswer":75},"捕捉影响（Capturing Impact）的测量重点是什么？",{"text":76,"@type":64},"重点应放在项目整体产生的系统级变革，而不是单个目标；必要时可选择 1-2 个站点做更深入的影响分解。","https://schema.org",{"og:url":32,"og:type":79,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":81,"canonical":32},"index,follow",{"doc_id":83,"site_id":7},171256,1791494398,{"code":4,"msg":86,"data":87},"success",[88,92,97,102,107,112,117,122,127],{"id":89,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":90,"slug":91},11,90,"presentations",{"id":93,"doc_module":22,"doc_module_name":25,"category_name":94,"show_sort_weight":95,"slug":96},12,"Resumes",80,"resumes",{"id":98,"doc_module":22,"doc_module_name":25,"category_name":99,"show_sort_weight":100,"slug":101},14,"Invoices",70,"invoices",{"id":103,"doc_module":22,"doc_module_name":25,"category_name":104,"show_sort_weight":105,"slug":106},15,"Posters",60,"posters",{"id":108,"doc_module":22,"doc_module_name":25,"category_name":109,"show_sort_weight":110,"slug":111},16,"Social Media",50,"social-media",{"id":113,"doc_module":22,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},17,"Forms",40,"forms",{"id":118,"doc_module":22,"doc_module_name":25,"category_name":119,"show_sort_weight":120,"slug":121},18,"Letters",30,"letters",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":125,"slug":126},21,"Paper Templates",5,"papers-templates",{"id":128,"doc_module":22,"doc_module_name":25,"category_name":129,"show_sort_weight":4,"slug":130},158,"General","general-158",{"code":4,"msg":86,"data":132},{"doc_id":83,"user_id":133,"nickname":42,"user_avatar":134,"doc_module":22,"category_id":89,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":89,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":33},34359740700684,"https://ap-avatar.wpscdn.com/avatar/1f400023980c374ae676?_k=1777273430885731487","CP3 Implementation & Measurement Plan\nYou should modify the Implementation & Measurement Plan (IMP) template to align with the number of goals your specific project requires.  For each goal in the IMP, create an Implementation Plan table and a Measurement Plan table. Please use the definitions provided in the IMP guidance document when crafting your plan. Draft, in the box below, the overarching goal statement for the project. Following completion of the IMP, each grantee is expected to complete the Risk Assessment & Mitigation Plan in Appendix A. Please note that select grantees will undergo an independent outcome evaluation that will specifically seek to determine the impact of a program and whether it was able to achieve its stated goals and objectives as measured against its stated performance measures/indicators. It is therefore critical that this plan is completed as comprehensively as possible to enable this type of evaluation to be possible.\nIn the Implementation Plan table:\nAfter reviewing the example table, please delete the “Example Goal 1 Implementation Plan” and fill in your project plan within the blank Implementation Plan table further down within this template.  For additional guidance, definitions, and examples, please consult the “IMP Guidance Document”\nType each activity in a separate row; add as many rows as needed.\nArrange activity rows chronologically by the start date of the activity.\nThere are two types of “Anticipated Outputs”. Indicate in the Implementation Plan table what the output type is for each entry:\n'Intermediary’ outputs: Steppingstones that make subsequent activities possible but do not effect change in and of themselves\nKey outputs: The project’s primary deliverables.\nNot all outputs will have an anticipated outcome. The “Anticipated Outcomes” column only needs to be populated for ‘terminal’ project outputs.\nThe plan should span all years of performance under this grant program.\nIn the Measurement Plan table:\nAfter reviewing the example table, please delete the “Example Goal 1 Measurement Plan” and fill in your project plan within the blank Measurement Plan table further down within this template.  For additional guidance, definitions, and examples, please consult the “IMP Guidance Document”\nType each performance measure in a separate row. Every key activity in your implementation plan table such as trainings, workshops, or case management activities should have at least one corresponding performance measure and target within the measurement table\nMap each performance measure to the relevant activity by including the numerical code of the activity to which it applies, e.g., 1.1.1, 1.1.2, etc.\nInclude performance indicators, targets, and the data collection method that will measure the results of the relevant activity in line with that activity’s corresponding goal and objective.\nIdentify and/or design data collection methods to be used to obtain the data that will be reported on quarterly.\nThe information in the “Performance Measures” column of the Measurement Plan should align with the information in the “Anticipated Outputs” and “Anticipated Outcomes” columns of your Implementation Plan.\nIn the Capturing Impact plan:\nAfter reviewing the example impact plan, please delete the “Example Project Plan for Capturing Impact” and fill in your project plan within the blank Capturing Impact section further down within this template.  For additional guidance, definitions, and examples, please consult the “IMP Guidance Document”\nThe impact of a project is captured by observing the system-level change that is produced by the project’s work. As such, measuring the project’s impact should focus on the entire project and not on individual goals, as the project’s whole is greater than the sum of its parts.\nIn cases where a project works across multiple sites (in different communities, schools, police departments, etc.), you can select one to two sites in which to prove a more in-depth breakdown of impact.","cbCaiohyz15mPJbd","https://ap.wps.com/l/cbCaiohyz15mPJbd","docx",69608,"English","# Project Goal Statement\n## Target Population\n# Goal 1 - Implementation Plan\n## Output Types: Intermediary / Key\n## Anticipated Outcomes\n# Goal 1 - Measurement Plan\n## Performance Measures and Targets\n## Mapping Measures to Activities\n# Capturing Impact\n## System-Level Change and Site Selection","[{\"question\":\"IMP 中需要为每个目标分别包含哪些表格？\",\"answer\":\"每个目标都需要创建一份 Implementation Plan 表和一份 Measurement Plan 表，并按模板要求填写。\"},{\"question\":\"Implementation Plan 里“Intermediary”和“Key outputs”的区别是什么？\",\"answer\":\"Intermediary 输出用于打通后续活动的关键步骤但不直接带来变化；Key outputs 是项目的主要交付物，终端输出才需要在 Anticipated Outcomes 栏填写。\"},{\"question\":\"Measurement Plan 的绩效指标应如何与实施活动对应？\",\"answer\":\"每条绩效指标需要映射到相关活动，并在 Mapping 中填写对应活动的数值编号（如 1.1.1、1.1.2 等），确保可追溯。\"},{\"question\":\"捕捉影响（Capturing Impact）的测量重点是什么？\",\"answer\":\"重点应放在项目整体产生的系统级变革，而不是单个目标；必要时可选择 1-2 个站点做更深入的影响分解。\"}]","CP3 Implementation & Measurement Plan | DOCX",1788281012]