[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-173167-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-173167-en":127},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","cost-plus-construction-contract","COST-PLUS CONSTRUCTION CONTRACT","","Cost-plus construction contract detailing the parties’ agreement to build improvements on a specified Mississippi property, including project scope, contractor supervision responsibilities, and procurement of labor, materials, equipment, utilities, and services. The document assigns tax, permitting, compliance with laws, site notice duties, and final cleanup obligations to the contractor. Ownership controls design responsibilities through architects and professionals, including soil testing delivery and reliance terms, fee structure tied to a defined project cost, and exclusions for certain charges.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/forms/","Forms",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/cost-plus-construction-contract/173167/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/cost-plus-construction-contract/173167.png","ImageObject",442,249,{"name":42,"@type":43},"Sophia Brooks","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-26","2026-09-01",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",8,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What compensation structure does the contractor receive under a cost-plus arrangement?","Question",{"text":63,"@type":64},"The contractor receives a fee equal to a stated percentage of the Project Cost incurred during construction.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What expenses are included in the definition of “Project Cost”?",{"text":68,"@type":64},"Project Cost includes labor, materials, subcontractor profit, expenses, allowances, and change orders, regardless of whether paid by the contractor or the owner.",{"name":70,"@type":61,"acceptedAnswer":71},"Who is responsible for design and retaining design professionals?",{"text":72,"@type":64},"Design responsibility lies with the owner, including retaining and contracting with qualified design professionals such as architects and engineers, if chosen.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},173167,1788300641,{"code":4,"msg":82,"data":83},"success",[84,89,94,99,104,109,113,118,123],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":86,"show_sort_weight":87,"slug":88},11,"Presentations",90,"presentations",{"id":90,"doc_module":22,"doc_module_name":25,"category_name":91,"show_sort_weight":92,"slug":93},12,"Resumes",80,"resumes",{"id":95,"doc_module":22,"doc_module_name":25,"category_name":96,"show_sort_weight":97,"slug":98},14,"Invoices",70,"invoices",{"id":100,"doc_module":22,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},15,"Posters",60,"posters",{"id":105,"doc_module":22,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},16,"Social Media",50,"social-media",{"id":110,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":111,"slug":112},17,40,"forms",{"id":114,"doc_module":22,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},18,"Letters",30,"letters",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":121,"slug":122},21,"Paper Templates",5,"papers-templates",{"id":124,"doc_module":22,"doc_module_name":25,"category_name":125,"show_sort_weight":4,"slug":126},158,"General","general-158",{"code":4,"msg":82,"data":128},{"doc_id":79,"user_id":129,"nickname":42,"user_avatar":130,"doc_module":22,"category_id":110,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":136,"language":137,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":12,"update_tm":80,"read_time":33},962084925636,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","COST-PLUS CONSTRUCTION CONTRACT\nWHEREAS, \t\t, (AContractor@) a Mississippi limited liability company     and \t\t\t\t(hereinafter called AOwner@) desire to enter into a Contract for the Construction of improvements on that certain     part     and     parcel     of      Real      Estate      described      as      or      located  at \t, \t\t, Mississippi (the AProperty@); and\nWHEREAS, the aforesaid Contractor and Owner further desire to enter into an agreement regarding the aforesaid Property and to provide for the construction of said improvements thereon.\nNOW THEREFORE, KNOW ALL MEN BY THESE PRESENTS, that upon the\nfollowing terms, conditions and consideration aforesaid, the Contractor and Owner agree as follows (hereinafter Athe Agreement@):\nThe Project: Contractor agrees to construct a house on the above described real estate in substantial compliance with the Project Architect’s plans and specifications, if there are any (hereinafter Athe Project@), subject to the provisions of paragraph 1.3, herein below.\nThe Contractor shall supervise and oversee the construction of the Project, using its best skill and judgment and pursuant to the current local customs and standards in the home building industry.\nUnless otherwise specifically noted, the Contractor shall contract for all labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for the execution and completion of the Project.\nThe Contractor shall pay all sales, consumer, use and other similar taxes required by law and shall secure all permits, fees and licenses necessary for the execution of the Project. Contractor=s overhead and profit, is included in the price. The Contractor shall give all notices and comply with all laws, ordinances, rules, regulations and orders of any public authority bearing on the performance of the work on the Project, and shall notify the Owner if the drawings and specifications are at variance therewith. At the completion of the Project the Contractor shall remove all of its waste materials and rubbish from and about the Project as well as its tools, construction equipment, machinery and surplus materials, and shall clean all glass surfaces and shall leave the work Abroom clean@ or its equivalent, except as otherwise specified.\nThe Owner acknowledges that all aspects of the design of the Project is the Owner’s responsibility. To the extent that the Owner so chooses, it is the Owner’s responsibility to retain and contract with suitable design professionals, including, but not limited to a Project Architect, Structural Engineer and Geotechnical Engineer, as well as any other Design Professional recommended to the Owner by the Project Architect (the Design\nProfessionals). In all cases, the Project Architect, if retained and contracted for The Project, shall be the Owner’s representative for all of the design aspects of The Project. Furthermore, the Owner shall be responsible for retaining and contracting with a certified soil testing laboratory to perform all of the necessary soil and compaction testing, if necessary for The Project. The Owner or the Project Architect, is responsible for providing the Contractor with all design specification, design drawings, soil test results, compaction test results, and any other quality control report necessary for the Contractor to perform its work on The Project in a good an workman like fashion.\nThe Project Architect/Plan Designer is \t\t, of \tCity and \tState; □ None applicable.\nThe Project Structural Engineer is \t, of\nCity and \tState; □ None applicable.\nThe Project Geotechnical Engineer is \t, of\nCity and \tState; □ None applicable.\nThe Project Testing Laboratory is \t, of\nCity and \tState; □ None applicable.\nOther Design Professionals retained and contracted with by the Owner\ninclude:\n□\tNone applicable.\nThe Owner acknowledges and represents to the Contractor that all soil testing for the Project site has been complete","cbCaisn80ipT1wTW","https://ap.wps.com/l/cbCaisn80ipT1wTW","docx",30145,10,"English","# Contract Terms\n## Project Scope and Contractor Duties\n## Design Responsibilities and Design Professionals\n## Soil Testing and Reliance\n## Project Fee and Project Cost","[{\"question\":\"What compensation structure does the contractor receive under a cost-plus arrangement?\",\"answer\":\"The contractor receives a fee equal to a stated percentage of the Project Cost incurred during construction.\"},{\"question\":\"What expenses are included in the definition of “Project Cost”?\",\"answer\":\"Project Cost includes labor, materials, subcontractor profit, expenses, allowances, and change orders, regardless of whether paid by the contractor or the owner.\"},{\"question\":\"Who is responsible for design and retaining design professionals?\",\"answer\":\"Design responsibility lies with the owner, including retaining and contracting with qualified design professionals such as architects and engineers, if chosen.\"}]","COST-PLUS CONSTRUCTION CONTRACT | DOCX"]