[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-172580-105":53,"doc-detail-172580-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","contract-specific-drawings-supplied-to-each-tenderer-sample-appendices","Contract-specific Drawings Supplied to Each Tenderer - Sample Appendices","","Sample appendices 0/1 to 0/4 define how contract documentation is completed and incorporated into tender and contract deliverables. Appendix 0/1 lists additional, substitute, and cancelled clauses, tables, and figures, while Appendix 0/2 covers minor alterations to existing clauses, tables, and figures. Appendix 0/3 explains responsibility symbols for compiling numbered appendices, including national pro-forma rules, and provides templates for List A and List B. Appendix 0/4 specifies drawing inspection arrangements and includes contract-specific and standard drawings, plus reference drawings brought into the contract.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/contract-specific-drawings-supplied-to-each-tenderer-sample-appendices/172580/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/contract-specific-drawings-supplied-to-each-tenderer-sample-appendices/172580.png","ImageObject",442,249,{"name":88,"@type":89},"Himbo","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-23","2026-09-01",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",10,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What information does Sample Appendix 0/1 provide for each tenderer?","Question",{"text":109,"@type":110},"It lists the contract-specific additional, substitute, and cancelled clauses, tables, and figures included in the contract.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How is responsibility for compiling numbered appendices defined in Sample Appendix 0/3?",{"text":114,"@type":110},"It uses symbols (e.g., E, C, E/C, T/C) to indicate whether the employer, contractor, or tenderer compiles and/or completes appendices, and it sets rules for national pro-forma formats.",{"name":116,"@type":107,"acceptedAnswer":117},"How are drawings made available for inspection under Sample Appendix 0/4?",{"text":118,"@type":110},"The appendix states that specified drawings are available for inspection by tenderers at given dates and times, and that one copy is supplied to the contractor.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},172580,1788294858,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":15,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":126,"read_time":79},687197100911,"https://ap-avatar.wpscdn.com/avatar/a000239b6f1da00475?x-image-process=image/resize,m_fixed,w_180,h_180&k=1785132997149421697","8.\tSample Appendices 0/1 to 0/4\n8.1\tSample Appendix 0/1: Contract-Specific Additional, Substitute and Cancelled Clauses, Tables and Figures included in the Contract\n[Note to compiler: See Section 1 of CC-GSW-00010 regarding approval of contents of Appendix 0/1]\nList of Additional Clauses, Tables and Figures\nList of Substitute Clauses, Tables and Figures\nList of Cancelled Clauses, Tables and Figures\nAdditional Clauses, Tables and Figures\nSubstitute Clauses, Tables and Figures\n\u000f\n8.2\tSample Appendix 0/2: Contract – Specific Minor Alterations to Existing Clauses, Tables and Figures included in the Contract\n8.3\tSample Appendix 0/3: List of Numbered Appendices referred to in the Specification and included in the Contract\n[Note to compiler: Include the following explanatory statements relating to List A and List B]\nThis Appendix 0/3 is comprised of a list of the Numbered Appendices referred to in the Specification and included in this Contract.\nResponsibility for the compilation/completion of the appendices is indicated by the following symbols:\nE\tEmployer compiles\nC\tContractor to compile and submit to the Employer’s Representative\nE/C\tEmployer partially compiles and Contractor completes and submits to the Employer’s Representative\nT/C\tTenderer compiles and returns with his Tender. Post award of Contract the Contractor reviews and submits to the Employer’s Representative.\n(P)\tThe symbol ‘P’ indicates the appendix is a national pro-forma and the format must not be altered.\nWhere a Contractor or Tenderer is required to compile or complete an Appendix, they shall do so in accordance with the GSW, and providing information similar to that stated in the sample appendices as a minimum.\nAppendix 0/3 is comprised of two lists, A and B, of Numbered Appendices as follows.\nList ‘A’ is a complete list of the Numbered Appendices referred to in the SPW with those not adopted marked “Not Used”. Those identified by the letters ‘T’ or ‘C’ shall be compiled by the Tenderer or the Contractor respectively.\nList ‘B’ gives a list of Contract – specific Numbered Appendices devised for this Contract.\n[Note to compiler: Reproduce here the following sample List A deleting the word ‘Sample’ and adding Volume No. where each is located within the documents and stating those Numbered Appendices not used. Ensure the ‘Instructions for Tendering’ correspond with the requirements for submission of completed Appendices by the Tenderers.]\n[Note to compiler: Insert a List B of any project specific Appendices in a similar format to List A. Preferably commence the numbering of these Project-specific Numbered Appendices at the 70th Appendix of the respective parts (e.g. 1/70) to avoid conflict with future national Additional Numbered Appendices.]\u000f\nSample List of Numbered Appendices – List A\n[Note to compiler:\n* These Appendices relate to alternatives in the Sample Appendices where the choice is to be made by the Contractor and all appropriate alternatives should be listed in List A.].\n\u000f\n8.4\tSample Appendix 0/4: List of Drawings Included in the Contract\n8.4.1\tContract-specific Drawings Supplied to Each Tenderer\n8.4.2\tStandard Drawings\n8.4.2.1\tSupplied to Each Tenderer\n8.4.2.2\tInspected by tenderers\nThe following drawings are made available for inspection by Tenderers at:\n_______________________________________________________________________________\n_______________________________________________________________________________\nbetween the following dates \t________________________________________________________\nand at the following times \t________________________________________________________\nOne copy will be supplied to the Contractor\n\u000f\n8.2.4.3\tBrought Into the Contract by Reference\nThe Standard Construction Details (SCD) in TII Publications (Standards) contain the following drawings brought into the Contract by reference. Unless otherwise stated below the whole drawing is brought into the Contract.\n[Notes to compiler regarding SCDs:\nThe drawings in the SCDs are intende","cbCaiqiN5tlswkHL","https://ap.wps.com/l/cbCaiqiN5tlswkHL","docx",40598,"English","# Sample Appendices\n## Sample Appendix 0/1: Contract-Specific Additional, Substitute and Cancelled Clauses, Tables and Figures\n## Sample Appendix 0/2: Contract – Specific Minor Alterations to Existing Clauses, Tables and Figures\n## Sample Appendix 0/3: List of Numbered Appendices referred to in the Specification and included in the Contract\n## Sample Appendix 0/4: List of Drawings Included in the Contract\n### 8.4.1 Contract-specific Drawings Supplied to Each Tenderer\n### 8.4.2 Standard Drawings","[{\"question\":\"What information does Sample Appendix 0/1 provide for each tenderer?\",\"answer\":\"It lists the contract-specific additional, substitute, and cancelled clauses, tables, and figures included in the contract.\"},{\"question\":\"How is responsibility for compiling numbered appendices defined in Sample Appendix 0/3?\",\"answer\":\"It uses symbols (e.g., E, C, E/C, T/C) to indicate whether the employer, contractor, or tenderer compiles and/or completes appendices, and it sets rules for national pro-forma formats.\"},{\"question\":\"How are drawings made available for inspection under Sample Appendix 0/4?\",\"answer\":\"The appendix states that specified drawings are available for inspection by tenderers at given dates and times, and that one copy is supplied to the contractor.\"}]","Contract-specific Drawings Supplied to Each Tenderer - Sample Appendices | DOCX"]