[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-244757-105":3,"detail-sidebar-cat-1-en-105":73,"doc-detail-244757-en":118},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":66,"head_meta":68,"extra_data":70,"updated_unix":72},105,"en","construction-proposal-teach-academy-renovation-estimate","CONSTRUCTION PROPOSAL - Teach Academy Renovation Estimate","","Construction proposal and budgetary construction estimate for renovating the Teach Academy space located at 8505 Western Ave., Los Angeles, CA. The scope is organized by building work divisions, covering demolition, concrete and concrete finishing, masonry, metals, thermal protection, openings, finishes, specialties, furnishings, fire suppression, plumbing, HVAC, electrical, fire and life safety, and exterior improvements. Includes line-item alternates, exclusions, and allowance notes, with totals and page-by-page breakdowns across multiple sections.",{"@graph":14,"@context":65},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/presentations/","Presentations",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/construction-proposal-teach-academy-renovation-estimate/244757/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/construction-proposal-teach-academy-renovation-estimate/244757.png","ImageObject",442,249,{"name":42,"@type":43},"Sage","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-19","2026-09-12",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",14,{"@type":57,"mainEntity":58},"FAQPage",[59],{"name":60,"@type":61,"acceptedAnswer":62},"Are alternates included in the pricing?","Question",{"text":63,"@type":64},"Yes. The document contains “ADD ALTERNATE” items with separate added costs for specific improvements, such as enlarged footings and polished concrete finishing.","Answer","https://schema.org",{"og:url":32,"og:type":67,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":69,"canonical":32},"index,follow",{"doc_id":71,"site_id":7},244757,1791717682,{"code":4,"msg":74,"data":75},"success",[76,80,85,89,94,99,104,109,114],{"id":77,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":78,"slug":79},11,90,"presentations",{"id":81,"doc_module":22,"doc_module_name":25,"category_name":82,"show_sort_weight":83,"slug":84},12,"Resumes",80,"resumes",{"id":55,"doc_module":22,"doc_module_name":25,"category_name":86,"show_sort_weight":87,"slug":88},"Invoices",70,"invoices",{"id":90,"doc_module":22,"doc_module_name":25,"category_name":91,"show_sort_weight":92,"slug":93},15,"Posters",60,"posters",{"id":95,"doc_module":22,"doc_module_name":25,"category_name":96,"show_sort_weight":97,"slug":98},16,"Social Media",50,"social-media",{"id":100,"doc_module":22,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},17,"Forms",40,"forms",{"id":105,"doc_module":22,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},18,"Letters",30,"letters",{"id":110,"doc_module":22,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},21,"Paper Templates",5,"papers-templates",{"id":115,"doc_module":22,"doc_module_name":25,"category_name":116,"show_sort_weight":4,"slug":117},158,"General","general-158",{"code":4,"msg":74,"data":119},{"doc_id":71,"user_id":120,"nickname":42,"user_avatar":121,"doc_module":22,"category_id":77,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":122,"file_id":123,"file_url":124,"file_type":125,"file_size":126,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":127,"language":128,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":129,"faqs":130,"seo_title":131,"seo_description":12,"update_tm":132,"read_time":112},687197207057,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Contractor's License \\#: B743636  \nCONSTRUCTION PROPOSAL  \nTo: Red Hook Capital Tel: (310)768-2700  \nAttention: Mr. Hugo Garcia Date 5/17/19  \nAddress: 2120 E. Grand Ave., Suite 135 Valid Through: 5/24/19  \nEl Segundo, CA 90245  \nProject \\#: TBD Prepared By: Andrew Satoh  \n\n| We are pleased to offer the following budgetary construction estimate for the renovation of the Teach Academy space at 8505 Western Ave., Los Angeles, CA 90047\u003Cbr>The basic breakdown is provided herein. Please refer to the following pages for further clarifications by code.\u003Cbr>00 GENERAL REQUIREMENTS\u003Cbr>02 EXISTING CONDITONS\u003Cbr>03 CONCRETE\u003Cbr>04 MASONRY\u003Cbr>05 METALS\u003Cbr>06 WOOD, PLASTICS & COMPOSITES\u003Cbr>07 THERMAL PROTECTION\u003Cbr>08 OPENINGS\u003Cbr>09 FINISHES\u003Cbr>10 SPECIALTIES\u003Cbr>12 FURNISHINGS\u003Cbr>21 FIRE SUPRESSION\u003Cbr>22 PLUMBING\u003Cbr>23 HEATING VENTILATING & AIR CONDITIONING\u003Cbr>26 ELECTRICAL\u003Cbr>28 FIRE & LIFE SAFETY\u003Cbr>30 EXTERIOR IMPROVEMENTS | 38,227.60\u003Cbr>4,750.00\u003Cbr>27,680.00\u003Cbr>4,950.00\u003Cbr>44,371.80\u003Cbr>1,320.00\u003Cbr>5,015.00\u003Cbr>68,238.50\u003Cbr>38,846.50\u003Cbr>9,147.91\u003Cbr>14,835.91\u003Cbr>6,588.00\u003Cbr>24,702.70\u003Cbr>8,250.00\u003Cbr>33,330.00\u003Cbr>5,250.00\u003Cbr>5,376.80 |\n| --- | --- |\n\nSubtotal: $  \nLiability Insurance: $ Contractor's fee: $  \nGrand Total: $  \n340,880.72 4,090.57 34,088.07 379,059.36  \nPage 1 of 13  \n\n| 0070 | GENERAL CONDITIONS |\n| --- | --- |\n| * Project management\u003Cbr>* Site supervision (full time)\u003Cbr>* Trash containers\u003Cbr>* Final cleaning\u003Cbr>* Temporary fencing\u003Cbr>* Temporary toilets\u003Cbr>* General administration\u003Cbr>Notes:\u003Cbr>* Owner provides electrical power usage for contractor use at no cost\u003Cbr>* Owner provides water to contractor at no cost from existing building meter\u003Cbr>Exclusions:\u003Cbr>1) Asbestos survey and removal\u003Cbr>2) Security guard\u003Cbr>3) Fire-caulking of existing rated wall or floor penetrations\u003Cbr>4) Off-hour work |  |\n| Total | $ 38,227 .60 |\n| 024 | DEMOLITION |\n| * Demolition scope\u003Cbr>- (14) interior window openings in existing walls\u003Cbr>- (3) interior door openings\u003Cbr>- (1) overhead window opening\u003Cbr>-Demo TBAR ceiling at restrooms\u003Cbr>-Demo doors for reuse\u003Cbr>-Demo hard lid and TBAR at room A7 and A8 ( save tiles for reuse)\u003Cbr>-Demo of exterior signage box on 85th St\u003Cbr>+ Assumes that there is existing stucco behind the signage box\u003Cbr>Exclusions\u003Cbr>1) Demo of phone box\u003Cbr>2) Demo or relocation of existing container offices in rear parking lot |  |\n\nTotal $ 4,750 .00  \nPage 2 of 13  \n\n| 030 CONCRETE |  |  |  |  |\n| --- | --- | --- | --- | --- |\n| * Plumbing trench to (2) new restrooms and hand sink\u003Cbr>-Fill and compact dirt after plumbing rough-in\u003Cbr>-Drill and epoxy rebar\u003Cbr>-Install concrete\u003Cbr>* (2) trenches for new underground electrical lines to (2) new gate motors\u003Cbr>-Note: patching cost is included in paving cost\u003Cbr>ADD ALTERNATE\u003Cbr>1) Enlarge footings at perimeter fence [along Western Ave. to](along Western Ave. to) accommodate new perforated metal screen panels. The size of the existing footings for the fence posts is currently unknown. Larger footings may be necessary due to the increased wind load exerting pressure on the fence |  | ADD: | $ | 17,850.00 |\n| Total |  |  | $ | 8,925.00 |\n| 034 | CONCRETE FINISHING |  |  |  |\n| * Floor finishing of existing concrete floors\u003Cbr>-Grind and seal\u003Cbr>+ Mechanically grind floor with metal diamonds to level\u003Cbr>+ Seal with Ashford formula\u003Cbr>+ Includes $2,250 allowance for spall repair and cracking chasing of trip hazards only\u003Cbr>+ Note: floor will still have scratches and other existing imperfections that will be visible\u003Cbr>ADD ALTERNATE\u003Cbr>1) Polished concrete floor in lieu of just sealant\u003Cbr>-Mechanically grind floor with metals to expose salt-and-pepper aggregate\u003Cbr>-Seal concrete\u003Cbr>-Mechanically polish and hone floor to a level 2 finish\u003Cbr>-Apply sealant and perform high speed burnish |  | ADD: | $ | 17,043.00 |\n| Total |  |  | $ | 18,755.00 |\n| 040 | MASONRY |  |  |  |\n| * Furnish and install masonry for new entry way off of 85th St.\u003Cbr>-Drill and epoxy \\#4 vertical dowels @ 16\" O/C\u003Cbr>-Drill ","cbCaipy6kRKzBB5K","https://ap.wps.com/l/cbCaipy6kRKzBB5K","pdf",454632,13,"English","# Construction Proposal\n## Project Information\n## Budgetary Estimate Scope (By Division)","[{\"question\":\"Are alternates included in the pricing?\",\"answer\":\"Yes. The document contains “ADD ALTERNATE” items with separate added costs for specific improvements, such as enlarged footings and polished concrete finishing.\"}]","CONSTRUCTION PROPOSAL - Teach Academy Renovation Estimate | PDF",1789221535]