[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-257606-105":53,"doc-detail-257606-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","construction-project-engineer-job-description-key-responsibilities","Construction Project Engineer - Job Description - Key Responsibilities","","Construction Project Engineer job description detailing reporting structure to the Project Manager and key deliverables including project schedules, unit turnover timing, commitment cost tracking, change request detail, cost at complete, and subcontractor punch lists. Emphasizes pre-construction and construction coordination, monthly site travel, field communications, municipal inspection verification, and utility coordination to align installations with project documents. Specifies required familiarity with Procore, Microsoft Project, Bluebeam Revu, Timberscan, and Sage 300, plus training, document management, and safety commitment in injury-free execution.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":41,"@type":70,"position":76},"https://docshare.wps.com/template/letters/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/construction-project-engineer-job-description-key-responsibilities/257606/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/construction-project-engineer-job-description-key-responsibilities/257606.png","ImageObject",442,249,{"name":88,"@type":89},"Blaney","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-30","2026-09-13",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",13,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"Who does the Construction Project Engineer report to, and what are the required outputs?","Question",{"text":109,"@type":110},"The role reports to the Project Manager. Required outputs include project schedules, unit turnover schedule, commitment cost, change request details, Cost at Complete (CAC), and the subcontractor building punch list.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What software tools are expected for this position?",{"text":114,"@type":110},"The description expects familiarity with company software including Procore and Microsoft Office (including Project for scheduling), Bluebeam Revu, Timberscan for invoice approval, and Sage 300 for estimating, job cost, project management, and accounting.",{"name":116,"@type":107,"acceptedAnswer":117},"What are the key responsibilities during construction coordination?",{"text":118,"@type":110},"Core duties include preparing and maintaining project schedules through completion, identifying and resolving issues affecting schedule, verifying municipal inspections, coordinating permanent utilities for site readiness, and managing transmittals, RFIs, change requests, submittals, and drawing revisions.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},257606,1790175494,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":40,"category_name":41,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":76,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":9},1236954677761,"https://us-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","CONSTRUCTION PROJECT ENGINEER  \nJOB DESCRIPTION  \nTitle: Construction Project Engineer  \nReports To: Project Manager  \nLocation:  \nReports Required:  \n• Project Schedules  \n• Unit Turnover Schedule  \n• Commitment Cost  \n• Change Request Detail  \n• Cost At Complete (CAC)  \n• Subcontractor Building Punch List  \nMajor Objectives:  \nAssist Team to coordinate and manage all pre-construction and construction related activities related to all applicable projects. Team includes the entire Garrett Companies Team – and most notably the Development and Construction divisions.  \nSpecific Duties and Responsibilities:  \nLearn, become familiar with and utilize company’s software. Current software includes:  \n• Procore, Microsoft Office (including Project for scheduling) .  \n• Blue Beam Revu for electronic document mark-ups and onscreen take-offs.  \n• Timberscan for Accounts Payable invoice approval.  \n• Sage 300 for all project specific Estimating, Project Management, Job Cost and Accounting needs.  \n• Required training is provided by the Company.  \n• Travel to applicable project sites at least once a month to ensure progress, quality and field personnel is equipped to complete the project as expected and communicated to the Team.  \n• Coordinate, assist and communicate with Team to help the overall success of this project.  \nJob Description Field Constrcution Intern 1  \n• Communicate with on-site field personnel to ensure they have the tools in order for them to direct and supervise all on-site activities to achieve completion of the project on schedule, within budget with quality workmanship that conforms to the plans and specifications and satisfaction to the Development and Property Management Teams.  \n• Prepare and maintain project schedule and manage through completion.  \n• Assist in identifying potential issues and solve problems to maintain construction schedule.  \n• Verify all required municipal inspections as they pertain to the local municipality and communicate this to the Project Manager.  \n• Coordinate with all applicable permanent utility companies and ensure they are prepared to get utilities to site based on project schedule.  \n• Once coordinated, utility companies shall be passed onto field staff for their scheduling and supervision to ensure utilities are installed as required per the project documents.  \n• Work with PM to purchase GC provided materials and coordinate with field Team for delivery.  \n• Maintain positive relationships with all Garrett Companies Personnel, design team, contractors, suppliers, subcontractors, utility companies, and all applicable municipal representatives.  \n• Demonstrate commitment to Injury-Free Environment through own actions, mentoring others while on-site and in the office, and assist to rectify any job site hazards immediately.  \n• Review Superintendent’s Daily Reports organized by the Garrett Contract Administrator to ensure project is being completed as expected.  \n• Create general project schedule with assistance of Project Manager and update such as needed.  \n• Assist in coordinating Director of Construction Administration’s monthly subcontractor progress meetings (4thweek of every month) and Owner’s bi-weekly development/construction progress meetings.  \n• Assist and ensure Superintendent is providing two week progress report (previous two weeks and next two weeks) bi-weekly to Project Management Team.  \n• Provide training and education to Garrett Companies personnel as needed to ensure a successful project.  \n• Maintain organized project specific electronic and paper files.  \n• Complete individual scopes of work and assist with completing subcontract documents.  \n• Obtain, understand, submit and organize Transmittals, Correspondence Log, RFIs, Change Requests, Submittals, Commitment’s and Commitment Change Orders, O&M documents, drawing log, and drawing revisions. Immediately provide site with all drawing revisions.  \nPrerequisites:  \nJob Description Field Constrcution Intern 2  \n• ","cbCaiibnxT7Zaw3j","https://ap.wps.com/l/cbCaiibnxT7Zaw3j","pdf",138734,"English","# Job Overview\n## Reporting and Required Outputs\n## Major Objectives\n# Responsibilities\n## Specific Duties and Responsibilities\n## Tools and Software\n## Training, Travel, and Document Control\n# Prerequisites and Culture\n## Qualifications\n## Pre-prerequisites\n# Training and Contact\n## Initial Training and Orientation\n## Contact and Application Link","[{\"question\":\"Who does the Construction Project Engineer report to, and what are the required outputs?\",\"answer\":\"The role reports to the Project Manager. Required outputs include project schedules, unit turnover schedule, commitment cost, change request details, Cost at Complete (CAC), and the subcontractor building punch list.\"},{\"question\":\"What software tools are expected for this position?\",\"answer\":\"The description expects familiarity with company software including Procore and Microsoft Office (including Project for scheduling), Bluebeam Revu, Timberscan for invoice approval, and Sage 300 for estimating, job cost, project management, and accounting.\"},{\"question\":\"What are the key responsibilities during construction coordination?\",\"answer\":\"Core duties include preparing and maintaining project schedules through completion, identifying and resolving issues affecting schedule, verifying municipal inspections, coordinating permanent utilities for site readiness, and managing transmittals, RFIs, change requests, submittals, and drawing revisions.\"}]","Construction Project Engineer - Job Description - Key Responsibilities | PDF",1789315212]