[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-239866-105":53,"doc-detail-239866-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","construction-progress-report-no-1-summer-place-phase-1","Construction Progress Report - No. 1 - Summer Place Phase 1","","Construction Progress Report No. 1 covers the Summer Place Phase 1 project in Crescent City, California, issued December 19, 2011. The report compiles general information, project data, and budget summary for Application for Payment No. 2, including contract sum, completed value, retainage, and percentage complete. It states there are no current potential overruns or change orders, confirms retainage terms at 10% for all trades, and notes contingency and soft cost status for the next draw package.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/construction-progress-report-no-1-summer-place-phase-1/239866/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/construction-progress-report-no-1-summer-place-phase-1/239866.png","ImageObject",442,249,{"name":88,"@type":89},"Emma Wilson","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-23","2026-09-11",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",9,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What project and phase does Construction Progress Report No. 1 cover?","Question",{"text":109,"@type":110},"It covers Summer Place Phase 1, an apartment complex project in Crescent City, California.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What payment application is referenced in the budget summary?",{"text":114,"@type":110},"The report references Application for Payment No. 2 as attached within the appendix and provides the related budget figures.",{"name":116,"@type":107,"acceptedAnswer":117},"Are there any potential overruns or change orders at this time?",{"text":118,"@type":110},"The report states there are no potential overruns and no change orders have been submitted or reported for this period.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},239866,1791430344,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":141,"read_time":101},3848291630094,"https://eur-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","CONSTRUCTION PROGRESS REPORT NO. 1  \nSUMMER PLACE PHASE 1 CRESECENT CITY, CALIFORNIA  \nDate Issued: December 19, 2011  \nProject No. 1134  \nPrepared For:  \nCLIENT  \nDecember 19, 2011  \nCLIENT  \nRe: Summer Place Phase 1  \nCrescent City, California  \nENGINEER Project No. 1134  \nDear Mr. Client:  \nSubmitted herewith is one electronic copy of our current Construction Progress Report for the above referenced project.  \nIf you have any questions or should you require any additional information, please contact this office.  \nVery truly yours,  \nEngineer  \nPresident  \nCc:  \nConstruction Progress Report 2 Client  \nProject No. 1134 Summer Place Phase 1  \nLOCATION MAPS  \nSubject Site   \nSubject Site  \nConstruction Progress Report 3 Client  \nProject No. 1134 Summer Place Phase 1  \nGENERAL INFORMATION  \nReport By:  \nDate:  \nProject Name:  \nProject Address:  \nReport Number:  \nObservation Date:  \nAttendees:  \nApplication for Payment Number:  \nDate:  \nPeriod To:  \nConstruction Commenced:  \nEngineer  \nDecember 19, 2011  \nSummer Place Phase 1  \nSummer Lane  \nCrescent City, California 1  \nDecemeber 7, 2011  \nEngineer  \nJim Rueben – Contractor  \n2  \nOctober 27, 2011  \nOctober 25, 2011  \nAugust 15, 2011 (approximate)  \nNote:  \nThe Architect of Record has signed our copy of the Application for Payment. Signature by the Architect of Record on the first page of the Application includes certification that based on onsite observations the quality of work is in accordance with the Contract Documents.  \nConstruction Progress Report 4 Client  \nProject No. 1134 Summer Place Phase 1  \nPROJECT DATA  \nProject Name: Summer Place Phase 1  \nProject Location: Summer Lane  \nCrescent City, California  \nOwner: Owner  \n3 Sylvie Way  \nWoodland, CA 95973  \nArchitect: Keith Architect  \n160 25th Street Fresno, CA 94304  \nStructural Engineer: Keith Architect  \n160 25th Street Fresno, CA 94304  \nMechanical/Electrical Engineer: Keith Architect  \n160 25th Street Fresno, CA 94304  \nCivil Engineer: Consulting  \n30 Natomas Street Fresno, CA 95630  \nGeneral Contractor: Owner  \n3 Sylvie Way  \nWoodland, CA 95973  \nConstruction Progress Report 5 Client  \nProject No. 1134 Summer Place Phase 1  \nBUDGET SUMMARY  \n1. Application for Payment No. 2 is attached within our report Appendix.  \nContractor's Application  \nConsultant's Recommendation  \na. Contract Sum 7,790,160.00 7,790,160.00 (4b)  \nb. Change Orders 0.00 0.00 (7)  \nc. Revised Contract Amount 7,790,160 .00 7,790,160 .00  \nd. Total Completed to Date 1,337,533.00 1,337,533.00 (4e)  \ne. Value of Stored Materials this Period 0.00 0.00 (6)  \nf. Total Completed to Date and Stored Materials 1,337,533.00 1,337,533.00  \ng. Retainage to Date 133,753.00 133,753.00 (4a)  \nh. Total Completed to Date Less Retainage 1,203,780.00 1,203,780.00  \ni. Previous Certificates of Payment 0.00 0.00 (4c)  \nj. Current Payment Due 1,203,780.00 1,203,780.00  \nk. Balance to Complete (Including Retainage) 6,586,380.00 6,586,380.00  \nl. % Contract to Date 17.20% 17.20%  \nConstruction Progress Report 6 Client  \nProject No. 1134 Summer Place Phase 1  \n2. a. Potential Overruns: None at this time.  \nb. Value of Potential Change Orders: None at this time.  \nc. Total Estimated Additional Funds Required: None at this time.  \n3. a. Original Owner’s Contingency: Unknown (see 4d) .  \nb. Remaining Owner’s Contingency: Unknown (See 4d) .  \nc. Original Contractors Contingency: $370,960 (See 4e) .  \nd. Remaining Contractor’s Contingency: $370,960 (See 4e) .  \n4. Comments:  \na. Retainage is being held at 10% for all trades.  \nb. The contract amount was obtained from the current application for payment and should be verified with Bank records.  \nc. Application for Payment 1 was not provided. Based on Application No. 2, previous payment is not reflected; therefore work in place was not invoiced. This should be verified with Bank records.  \nd. A Development Budget was not provided this period; therefore, the Owner’s Contingency amounts could not be verified. According to Owner,","cbCaicgECeERwxVS","https://ap.wps.com/l/cbCaicgECeERwxVS","pdf",964047,25,"English","# GENERAL INFORMATION\n## Budget Summary\n## Construction Summary\n## Notes and Comments","[{\"question\":\"What project and phase does Construction Progress Report No. 1 cover?\",\"answer\":\"It covers Summer Place Phase 1, an apartment complex project in Crescent City, California.\"},{\"question\":\"What payment application is referenced in the budget summary?\",\"answer\":\"The report references Application for Payment No. 2 as attached within the appendix and provides the related budget figures.\"},{\"question\":\"Are there any potential overruns or change orders at this time?\",\"answer\":\"The report states there are no potential overruns and no change orders have been submitted or reported for this period.\"}]","Construction Progress Report - No. 1 - Summer Place Phase 1 | PDF",1789154488]