[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-307745-105":53,"doc-detail-307745-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","construction-progress-meeting-minutes-15","Construction Progress Meeting Minutes - 1.5","","Construction progress meeting minutes for the Indianford Discharge Capacity Upgrades at Indianford Dam, Edgerton, WI, covering safety, work completed, and upcoming look-ahead items. The team reports completion of hazardous material testing with asbestos found and a change proposal submitted to hire a subcontractor for removal, along with completed erosion control, underground electrical conduit installation, and documentation of equipment pad work. The next onsite activity is not scheduled until March 2022, with possible earlier work in January 2022 and updates on RFI status and pending submittals, including slide gates and structural calculations.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":51,"@type":70,"position":76},"https://docshare.wps.com/template/general/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/construction-progress-meeting-minutes-15/307745/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/construction-progress-meeting-minutes-15/307745.png","ImageObject",442,249,{"name":88,"@type":89},"Dipper","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-09-20","2026-09-19",true,{"@type":98,"interactionType":99,"userInteractionCount":73},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What safety incidents or concerns were discussed?","Question",{"text":108,"@type":109},"The minutes include a safety section covering incidents and concerns with existing and upcoming activities, but no specific details are recorded under those headings in the provided text.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What work was completed since the last meeting?",{"text":113,"@type":109},"Hazardous material testing was completed and asbestos was found, prompting a change proposal for asbestos removal. The team also completed site erosion control (silt fence), installed and buried underground electrical conduit, and documented equipment pad construction in Field Report 01.",{"name":115,"@type":106,"acceptedAnswer":116},"What is the upcoming construction schedule and what might change?",{"text":117,"@type":109},"Onsite work is currently not scheduled until March 2022. The team is determining whether any work can start earlier, potentially in January 2022, with a tentative schedule to be discussed at the next meeting.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},307745,1789854329,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":50,"category_name":51,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":73,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":79,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":125,"read_time":73},1374404997633,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","—1.5  \n# Construction Progress Meeting Minutes\n\n\n| Project Name:   | Indianford Discharge  \u003Cbr>Capacity Upgrades   | Owner:   | Rock-Koshkonong Lake  \u003Cbr>District   |\n| --- | --- | --- | --- |\n| Project Location:   | Indianford Dam  \u003Cbr>Edgerton,W   | Project Manager:   | Jeff Anderson   |\n| Project Number.   | 4664711-192948.01   | Phone:   | 608-443-0451   |\n| Date:   | November 3,2021,10 AM   |  |  |\n| Attendees:   |  |  |  |\n\nBrandon Martzke-IEI  \nJeff Eigner-Van Ert (Electrical subcontractor)  \nJeff Anderson-Mead &Hunt  \nJon Salomon-Mead &Hunt  \n## 1.Safety\n\na.Incidents  \nb.Concems with existing conditions  \nc.Concems with upcoming activities  \n## 2.Work Completed\n\na.Work completed since last meeting  \n-The hazardous material testing has been completed.Asbestos was found and as aresult,IEI has submitted a change proposal to hire a subcontractor to remove thehazardous material.Jeff A.has provided IEI's change proposal to the RKLD.  \n-The erosion control (silt fence)for the site was completed prior to any site work.  \n-The underground electrical conduit was installed and buried.Jeff E.has theconstruction photos and will send them to Brandon fo IEl's record and thenBrandon will send them to Jeff A.  \n-The equipment pad construction was observed by Jon S.and documented in FieldReport 01.  \n## 3.Next Week Construction Look Ahead\n\na.Work scheduled  \n-There is currently no onsite work scheduled until March 2022.  \nb.Subs expected to be onsite  \nc.Equipment expected to be onsite  \n## 4.Anticipated Construction Schedule\n\na.Change in project milestones  \n-Per IEI's original project schedule,construction is not supposed to resume until March2022.However,Brandon is determining if there is any work that can be completedsooner,potentially starting in January 2022.If so,Brandon will have a tentativeschedule next meeting.  \n## 5.RFI's\n\n### a.Pending\n\n-IEl is waiting on RFI No.2 regarding the concrete mix design in order to complete theconcrete mix design submittal.Jeff A.to follow up on this.  \n### b.Critical Incoming\n\n## 6.Submittals\n\n### a.Pending\n\n-The slide gate submittal is the most critical pending submittal due to the gates'longlead time.Jeff A.will work to get the comments back soon.However,the submittalis missing the structural calcualtions for the gates and Brandon will follow up withRodney Hunt in order to get them submitted for review by Mead &Hunt.  \n-The structural steel submittal is stillunder review.  \n-The underwater concrete repair submittal willbe revisited and resubmitted once allareas of repairs are identified in order to determine the most approiate product touse for the work.  \n### b.Incoming\n\n-The engineering submittal is expected to be submitted within the next week.Thissubmittal includes the engineering calculations for the downstream bulkheads thatwill be used in dewatering and the rated lifting capacity of the existing overheadinterior crane.If possible,IEI plans to utilize the crane during construction.  \n-Various electrical submittals should be submitted throughout the next coming weeks.  \n7.Construction Bulletins  \n8.Change Orders  \n-IEI has submitted a change order for the asbestos.Jeff A.has forwarded to Alan S.with RKLD for approval.  \n## 9.Pay Requests\n\n-IEI submitted its first pay request to Jeff A.using an AIA form template.Jeff A.askedBrandon to research EJCDC document C-620,which was referenced in theContract Documents.  \n10.Required Upcoming Pemits  \n11.Required Upcoming Reports  \nPage 2 of 3  \n## 12.New Topics\n\n-Due to the lack of construction activity on site,IEI may look into the possibility ofremoving the erosion control during winter months if no work will be taking place.This is so IEI doesn't need to continue to maintain it.Additionally,per the erosionand sediment control note 5 on sheet G-021,the erosion control is to be inspectedweekly and after every 0.5”of rain.A log must be maintained thought the durationof the project.These requirements are also reiterated in the DNR's Plan approvallet","cbCaikOQlZyomfQZ","https://ap.wps.com/l/cbCaikOQlZyomfQZ","pdf",116632,"English","# 1. Safety\n## a. Incidents\n## b. Concerns with existing conditions\n## c. Concerns with upcoming activities\n# 2. Work Completed\n## a. Work completed since last meeting\n# 3. Next Week Construction Look Ahead\n## a. Work scheduled\n# 4. Anticipated Construction Schedule\n## a. Change in project milestones\n# 5. RFIs\n## a. Pending\n## b. Critical Incoming\n# 6. Submittals\n## a. Pending\n## b. Incoming\n# 7. Construction Bulletins\n# 8. Change Orders\n# 9. Pay Requests\n# 10. Required Upcoming Permits\n# 11. Required Upcoming Reports\n# 12. New Topics\n# 13. Tentative Next Meeting","[{\"question\":\"What safety incidents or concerns were discussed?\",\"answer\":\"The minutes include a safety section covering incidents and concerns with existing and upcoming activities, but no specific details are recorded under those headings in the provided text.\"},{\"question\":\"What work was completed since the last meeting?\",\"answer\":\"Hazardous material testing was completed and asbestos was found, prompting a change proposal for asbestos removal. The team also completed site erosion control (silt fence), installed and buried underground electrical conduit, and documented equipment pad construction in Field Report 01.\"},{\"question\":\"What is the upcoming construction schedule and what might change?\",\"answer\":\"Onsite work is currently not scheduled until March 2022. The team is determining whether any work can start earlier, potentially in January 2022, with a tentative schedule to be discussed at the next meeting.\"}]","Construction Progress Meeting Minutes - 1.5 | PDF"]