[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-393374-105":53,"doc-detail-393374-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","construction-packet-builder-construction-packet-2022-discover-the-fm-difference","CONSTRUCTION PACKET - Builder Construction Packet - 2022 - Discover the FM Difference","","Construction Packet - Builder Construction Packet (2022) provides a structured onboarding and documentation workflow for builders participating in Member First Mortgage’s one-time close, 12-month construction loan program. It explains how draw requests are submitted and acknowledged at closing and during construction, including sworn statements, full/partial lien waivers, required updates to contract amounts, and scheduling of inspections. The packet also outlines an example draw schedule across five stages and lists builder documentation needed for approval and project funding.",{"@graph":63,"@context":122},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/construction-packet-builder-construction-packet-2022-discover-the-fm-difference/393374/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/construction-packet-builder-construction-packet-2022-discover-the-fm-difference/393374.png","ImageObject",442,249,{"name":88,"@type":89},"Miles","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-17","2026-09-26",true,{"@type":98,"interactionType":99,"userInteractionCount":47},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114,118],{"name":105,"@type":106,"acceptedAnswer":107},"What steps are required to request draws at closing?","Question",{"text":108,"@type":109},"Draws at closing must be requested in writing by the builder, using the form in the package or an email submission containing the same information as the form. The borrower must acknowledge the request in advance and prior to final loan approval, and the documentation is submitted to the Loan Officer and/or Processor during approval.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"How does the draw request process work after the initial loan closes?",{"text":113,"@type":109},"After closing, the Servicing Team sets up the loan for the draw process and sends a welcome letter and email with next steps and the assigned construction loan agent. For each builder phase, the builder submits a Draw Request with required documentation such as updated sworn statements and full/partial lien waivers from prior draws.",{"name":115,"@type":106,"acceptedAnswer":116},"What documents are typically required for builder approval and project approval?",{"text":117,"@type":109},"For builder approval, the packet lists the completed Member First Mortgage Questionnaire, builder’s license (with noted exceptions), liability and workers’ compensation insurance, and a master insurance policy for a Builder’s Risk Policy. For project approval, it indicates a signed contract between the builder and the buyer (the text is truncated after this point).",{"name":119,"@type":106,"acceptedAnswer":120},"What is included in the waiver and sworn statement requirements?",{"text":121,"@type":109},"The packet requires a sworn statement for each draw request, including updates to Original Cost to Complete values and revised balances, signed and notarized by the builder/contractor. It also includes templates for full and partial unconditional lien waivers corresponding to previous draws.","https://schema.org",{"og:url":78,"og:type":124,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":126,"canonical":78},"index,follow",{"doc_id":128,"site_id":56},393374,1791488169,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":88,"user_avatar":133,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":47,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":45,"language":139,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":61,"update_tm":143,"read_time":144},13056703019404,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","CONSTRUCTION PACKET  \nBuilder Construction Packet  \n2 0 2 2  \nD ISCOV E R T H E M FM DIFFERENCE  \n| | | |\n| --- | --- | --- |\n| |  | |\n\nNMLS ID\\# 149532 | WWW . MEMBER FIRSTMORTGAGE . COM | 1.866.898.1818  \nTable of Contents  \n3 BUILDER INTRODUCTION  \n4 DRAW PROCESS AND SAMPLE  \n5 BUILDER DOCUMENTATION LIST  \n6 EXPLANATIONS:  \nNotice of Commencement  \nNotice of Furnishing  \nClaim of Lien (Waiver of Lien)  \nSworn Statement  \n9 BUILDER QUESTIONNAIRE  \n12 DRAW REQUEST FORM  \n13 BUILDER ACH AUTHORIZATION FORM  \n15 WAIVER OF LIEN  \nFull Unconditional Waiver of Lien  \nPartial Unconditional Waiver of Lien  \n15 SWORN STATEMENT  \nRevised 5.9.2022  \n[www.memberfirstmortgage.com | 1.866.898.1818 | NMLS](www.memberfirstmortgage.com | 1.866.898.1818 | NMLS) ID\\# 149532  \nBuilder Introduction  \nHello Builder,  \nThank you for assisting our member with the construction of their dream home! We look forward to working with you during this process and making this a great experience for our shared client.  \nMember First Mortgage offers a one-time close, 12-month construction loan program with up to five funding draws (see example of our estimated construction draw schedule on the following page) . As we move the member’s application through processing and underwriting, documentation will be needed from you throughout the process. Enclosed in this package you will find a documentation list and Builder Questionnaire form. Please gather the required documents and send them to the assigned Loan Originator as quickly as possible to ensure a smooth process.  \nThank you!  \nSincerely,  \nMember First Mortgage, LLC  \n616 44th Street SE, Grand Rapids, MI 49548 866.898.1818  \n[www.memberfirstmortgage.com](www.memberfirstmortgage.com)  \nRevised 5.9.2022  \n[www.memberfirstmortgage.com | 1.866.898.1818 | NMLS](www.memberfirstmortgage.com | 1.866.898.1818 | NMLS) ID\\# 149532  \nDraw Process and Sample  \nDRAWS AT CLOSING:  \nDraws at the time of closing must be requested by the builder and acknowledged by the borrower in advance and prior to the final loan approval. The request needs to be in writing, a form is available in this package, or a request can be submitted via email, it must contain all the same information as the form, with an acknowledgment from the borrower. This documentation should be submitted to the Loan Officer and/or Processor during the construction loan approval process.  \nDRAWS DURING CONSTRUCTION (AFTER INITIAL LOAN HAS CLOSED):  \nTo help draw requests run smoothly, please see below for our process during this phase of the construction.  \n• Each time the Builder completes a phase, they are entitled to loan proceeds to pay for the supplies and labor expenses. The Builder will contact Member First Mortgage for a “Draw Request” providing the required documentation, such as sworn statements and full/partial lien waivers from previous draws. Please remember to adjust the sworn statement for any increases or decreases in Original Contract Amounts, new Revised Amounts, and Balance to Complete. A template of a full and partial lien waiver is included in this packet.  \n• Once the initial loan has closed, our Servicing Team will setup the loan for the draw process. A welcome letter and email will be sent to you, appointing your construction loan agent, and outlining the next steps. Please allow 10 business days from the date of closing for this information to be sent. If you need to speak with an agent sooner, please call: 866.636.1052  \n• A sworn statement with the Original “Cost to Complete” for the project was submitted when the loan was  \napproved. This document will be used and updated going forward with each draw request submitted for funding. The sworn statement will need to be signed and notarized by the builder/contractor for each draw request. An example template is included in this package for use, this document must be signed and notarized.  \n• To ensure the home is being built as expected and on schedule, Member First Mortgage will order ","cbCaiht7fONMUlT1","https://ap.wps.com/l/cbCaiht7fONMUlT1","pdf",2070774,"English","# Builder Introduction\n# Draw Process and Sample\n## Draws at Closing\n## Draws During Construction (After Initial Loan Has Closed)\n# Builder Documentation List\n# Builder Questionnaire\n# Draw Request Form\n# Builder ACH Authorization Form\n# Waiver of Lien\n## Full Unconditional Waiver of Lien\n## Partial Unconditional Waiver of Lien\n# Sworn Statement","[{\"question\":\"What steps are required to request draws at closing?\",\"answer\":\"Draws at closing must be requested in writing by the builder, using the form in the package or an email submission containing the same information as the form. The borrower must acknowledge the request in advance and prior to final loan approval, and the documentation is submitted to the Loan Officer and/or Processor during approval.\"},{\"question\":\"How does the draw request process work after the initial loan closes?\",\"answer\":\"After closing, the Servicing Team sets up the loan for the draw process and sends a welcome letter and email with next steps and the assigned construction loan agent. For each builder phase, the builder submits a Draw Request with required documentation such as updated sworn statements and full/partial lien waivers from prior draws.\"},{\"question\":\"What documents are typically required for builder approval and project approval?\",\"answer\":\"For builder approval, the packet lists the completed Member First Mortgage Questionnaire, builder’s license (with noted exceptions), liability and workers’ compensation insurance, and a master insurance policy for a Builder’s Risk Policy. For project approval, it indicates a signed contract between the builder and the buyer (the text is truncated after this point).\"},{\"question\":\"What is included in the waiver and sworn statement requirements?\",\"answer\":\"The packet requires a sworn statement for each draw request, including updates to Original Cost to Complete values and revised balances, signed and notarized by the builder/contractor. It also includes templates for full and partial unconditional lien waivers corresponding to previous draws.\"}]","CONSTRUCTION PACKET - Builder Construction Packet - 2022 - Discover the FM Difference | PDF",1790385061,7]