[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-244065-105":53,"doc-detail-244065-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","construction-management-services-agreement-construction-management-services","Construction Management Services Agreement - Construction Management Services","","Construction Management Services Agreement outlining the Owner and Construction Manager roles, obligations, and conditions for pre-construction and construction delivery on a Guaranteed Maximum Price basis. Defines required familiarity with project scope, staff qualifications, and compliance with Florida licensing. Establishes project schedule responsibilities under a “Time is of the Essence” standard, site preparation and sufficiency duties including inspection and review of survey, documents, and tests, and requirements for maintaining the project team and contract document structure.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":41,"@type":70,"position":76},"https://docshare.wps.com/template/letters/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/construction-management-services-agreement-construction-management-services/244065/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/construction-management-services-agreement-construction-management-services/244065.png","ImageObject",442,249,{"name":88,"@type":89},"Sarah ","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-18","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",9,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What pricing basis governs the construction management services?","Question",{"text":109,"@type":110},"The Construction Manager provides pre-construction and construction services on a Guaranteed Maximum Price basis.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How does the agreement treat project schedule responsibility?",{"text":114,"@type":110},"The agreement requires the Construction Manager to perform expeditiously in accordance with the project schedule, and specifies that time is of the essence.",{"name":116,"@type":107,"acceptedAnswer":117},"What site preparation and documentation review duties does the Construction Manager have?",{"text":118,"@type":110},"The Construction Manager must inspect the project site, review surveys and owner layout/design requirements, examine relevant test investigations and recommendations, and review as-built and record drawings when existing structures are modified.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},244065,1790024051,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":40,"category_name":41,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":141,"read_time":142},962085320529,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES  \nThis Agreement for Construction Management Services (the “Agreement”) is made and entered into this   day of Month, Year, by and between The University of Florida Board of Trustees (“Owner”), and (CM Name), a (type/state of entity), with an address of (CM Address), and Federal I.D. No.   (“Construction Manager”), which is authorized to do business in Florida.  \nWITNESSETH:  \nWHEREAS, Owner solicited statements of qualifications from interested construction managers for the construction of the project described on Exhibit A (the “Project”); and  \nWHEREAS, based on Construction Manager’s interview, qualifications statement, and related submissions, Owner has selected Construction Manager for the Project; and  \nWHEREAS, Owner and Construction Manager desire to enter into this Agreement; and  \nWHEREAS, the Owner intends to engage, or has engaged, one or more Professionals to perform architectural and/or engineering services for the Project.  \nNOW THEREFORE, for and in consideration of the covenants herein contained and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Owner and the Construction Manager agree as follows:  \nARTICLE 1. GENERAL DESCRIPTION OF SERVICES  \n1.1  The Services. The Construction Manager agrees to furnish the pre-construction and construction services set forth herein and required for completion of the Project on a Guaranteed Maximum Price (hereinafter defined) basis. Construction Manager represents that it is thoroughly familiar with and understands the requirements of the Project scope and that it is experienced in the administration and construction of building projects of the type and scope contemplated by the Owner’s Facilities Program for the Project. Construction Manager represents to Owner that Construction Manager has all necessary construction education, skill, knowledge, and experience required for the Project and will maintain, at all times during the term of this Agreement, such personnel on its staff to provide the services contemplated hereby within the time periods required hereby. In addition, Construction Manager represents that it has, and all of the subcontractors performing services under this Agreement will have, all applicable licenses required by the State of Florida to perform such services.  \n1.2  Project Schedule / Time of the Essence. Construction Manager has provided Owner with a preliminary schedule covering the pre-construction and construction of the Project which is incorporated herein as Exhibit B. This preliminary schedule shall serve as the framework for the subsequent development of all detailed construction schedules described herein and in the General Terms and Conditions. The Construction Manager shall at all times carry out its duties and responsibilities as expeditiously as possible and in accordance with the Project schedule, subject to delays in the schedule not the fault of Construction Manager or its subcontractors. Time is of the essence in the performance of this Agreement.  \n1.3  Preparation/Sufficiency of Site. The Construction Manager shall, among other things Construction Manager needs to do to perform its obligations under this Agreement, as and when appropriate, (i) visit and thoroughly inspect the Project Site and any structure(s) or other manmade features to be modified and become familiar with local conditions under which the Project will be constructed and operated; (ii) familiarize itself with the survey, includingthe location of all existing buildings, utilities, conditions, streets, equipment, components and other attributes having or likely to have an impact on the Project; (iii) familiarize itself with the Owner’s layout and design requirements, conceptual design objectives, and budget for the Project; (iv) familiarize itself with pertinent Project dates and programming needs, including the Project schedule, (v) review and analyze all Project geo","cbCaifUhs9QRpuvI","https://ap.wps.com/l/cbCaifUhs9QRpuvI","pdf",465398,24,"English","# Article 1. General Description of Services\n## 1.1 The Services\n## 1.2 Project Schedule / Time of the Essence\n## 1.3 Preparation/Sufficiency of Site\n## 1.4 Project Team\n## 1.5 Contract for Construction","[{\"question\":\"What pricing basis governs the construction management services?\",\"answer\":\"The Construction Manager provides pre-construction and construction services on a Guaranteed Maximum Price basis.\"},{\"question\":\"How does the agreement treat project schedule responsibility?\",\"answer\":\"The agreement requires the Construction Manager to perform expeditiously in accordance with the project schedule, and specifies that time is of the essence.\"},{\"question\":\"What site preparation and documentation review duties does the Construction Manager have?\",\"answer\":\"The Construction Manager must inspect the project site, review surveys and owner layout/design requirements, examine relevant test investigations and recommendations, and review as-built and record drawings when existing structures are modified.\"}]","Construction Management Services Agreement - Construction Management Services | PDF",1789211564,8]