[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-253433-105":53,"doc-detail-253433-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","construction-incident-report","Construction Incident Report","","This document is a Construction Incident Report form for use by contractors and construction managers. It details the information required for reporting any type of incident that occurs during a construction project. The form mandates immediate notification to Drexel Public Safety and the Project Manager upon occurrence of any incident. It includes fields for PD&C Project Number, Date of Report, Date and Time of Occurrence, Incident Location (Building, Bldg. #, Floor, Rooms), Issuer (Contractor/Construction Manager), Individual Completing the Form, Description of Incident, Contact at Time of Incident (EH&RS, Security, PD&C), Date and Time of Contact, Action Taken, and Comments. The report also specifies recipients for CC, including Martin Bell (Environmental Health and Radiation Safety), Craig Flanagan (Public Safety/Security), and Michael Thompson (Executive Director of Construction), along with their email addresses. The purpose is for record-keeping after an incident has occurred, emphasizing the immediate reporting protocol.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/construction-incident-report/253433/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/construction-incident-report/253433.png","ImageObject",442,249,{"name":88,"@type":89},"นรินทร์","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-30","2026-09-13",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",13,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is the immediate action required in case of a construction incident?","Question",{"text":109,"@type":110},"In case of any incident, the Contractor is required to immediately call Drexel Public Safety at 215-895-2222 and the Project Manager.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What information needs to be provided on the Construction Incident Report form?",{"text":114,"@type":110},"The form requires details such as the project number, dates and times of occurrence and reporting, incident location, issuer, reporter's name, a description of the incident, contact details of who was notified, action taken, and any comments.",{"name":116,"@type":107,"acceptedAnswer":117},"Who are the standard recipients for a copy of the Construction Incident Report?",{"text":118,"@type":110},"Copies of the report are typically sent to Martin Bell from Environmental Health and Radiation Safety, Craig Flanagan from Public Safety, and Michael Thompson, the Executive Director of Construction.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},253433,1789266015,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":126,"read_time":4},2336475104957,"https://ap-avatar.wpscdn.com/avatar/22000c4c6bd8a5076e1?x-image-process=image/resize,m_fixed,w_180,h_180&k=1787554080175789136","| EXHIBIT C\u003Cbr>\u003Cbr>PLANNING, DESIGN AND CONSTRUCTION Construction Incident Report |  |\n| --- | --- |\n| For any type of indicent the Contractor is to immediately call Drexel Public Safety at 215-895-2222 and the Project Manager. This report is for record purposes after the fact. |  |\n| PD&C Project No.\u003Cbr>TO: | |\n| Project Manager, Planning, Design and Construction\u003Cbr>Date of Report: |  |\n| Date of Occurrence:     Time of Occurrence:    \u003Cbr>Incident Location: Building:   Bldg. \\#:     Floor:   Room(s):    \u003Cbr>Issued by:   (Contractor/Construction Manager)\u003Cbr>Individual Completing this Form:   \u003Cbr>Description of Incident:\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>Contact at Time of Incident:   EH&RS ( ) Security ( ) PD&C ( )\u003Cbr>Date of Contact:   Time Contacted:  \u003Cbr>Action Taken:\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>Comments:\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>cc (all):\u003Cbr>Martin Bell-Environmental Health and Radiation Safety [mwb32@drexel.edu](mwb32@drexel.edu)\u003Cbr>Craig Flanagan-Public Safety (Security)  [ccf42@drexel.edu](ccf42@drexel.edu)\u003Cbr>Michael Thompson-Executive Director of Construction [mwt44@drexel.edu](mwt44@drexel.edu) |  |","cbCairYtzVaedoUw","https://ap.wps.com/l/cbCairYtzVaedoUw","pdf",167470,"English","# Construction Incident Report","[{\"question\":\"What is the immediate action required in case of a construction incident?\",\"answer\":\"In case of any incident, the Contractor is required to immediately call Drexel Public Safety at 215-895-2222 and the Project Manager.\"},{\"question\":\"What information needs to be provided on the Construction Incident Report form?\",\"answer\":\"The form requires details such as the project number, dates and times of occurrence and reporting, incident location, issuer, reporter's name, a description of the incident, contact details of who was notified, action taken, and any comments.\"},{\"question\":\"Who are the standard recipients for a copy of the Construction Incident Report?\",\"answer\":\"Copies of the report are typically sent to Martin Bell from Environmental Health and Radiation Safety, Craig Flanagan from Public Safety, and Michael Thompson, the Executive Director of Construction.\"}]","Construction Incident Report | PDF"]