[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-243191-105":53,"doc-detail-243191-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","construction-change-order-form","Construction Change Order Form","","This document is a Construction Change Order Form for the Granite School District (GSD). It is used to detail modifications to an existing construction contract, including changes in the contract sum and contract time. The form requires information such as the project name, date, change order number, contractor, purchase order number, and GSD project number. It includes sections for describing the modification, itemized costs, and a summary of previously authorized change orders. The form must be signed by the designer, contractor, and GSD to be valid. It also provides contact information for the Granite School District and specifies revision dates for the form, February 27, 2024. The document is divided into two pages, with Page 1 focusing on the main change order details and Page 2 dedicated to itemized costs and a summary of previous changes.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/construction-change-order-form/243191/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/construction-change-order-form/243191.png","ImageObject",442,249,{"name":88,"@type":89},"River Wang","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-09","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",9,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is the purpose of this Construction Change Order Form?","Question",{"text":109,"@type":110},"This form is used to document modifications to an existing construction contract for projects managed by the Granite School District. It details changes to the contract sum and timeline.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What information is required to complete the form?",{"text":114,"@type":110},"The form requires details such as the project name, date, change order number, contractor information, GSD project number, and a description of the modifications. Signatures from the designer, contractor, and GSD are also necessary.",{"name":116,"@type":107,"acceptedAnswer":117},"How are cost changes handled on this form?",{"text":118,"@type":110},"The form includes sections for the original contract sum, previously authorized change orders, and the specific amount of the current change order (increase or decrease). It also has a section for itemized costs and a summary of all previously authorized changes.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},243191,1789958731,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":73,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":9},1099514067438,"https://ap-avatar.wpscdn.com/avatar/100002539ee87300030?x-image-process=image/resize,m_fixed,w_180,h_180&k=1780474512215547542","Construction Services  \n2500 South State Street  \nSalt Lake City, Utah 84115-3110 Phone (385) 646-4243 Fax (385) 646-4296  \n\n| CONSTRUCTION CHANGE ORDER FORM\u003Cbr>PROJECT: DATE:\u003Cbr>CHANGE ORDER NO:\u003Cbr>CONTRACTOR: PURCHASE ORDER NO:\u003Cbr>GSD PROJECT NO: |  |  |  |\n| --- | --- | --- | --- |\n| Modification to the Contract as follows: (Attach additional backup information as required by GSD) |  |  |  |\n| Original Contract Sum was:\u003Cbr>Previously authorized & processed Change Order amount:\u003Cbr>Contract Sum prior to this Change Order:\u003Cbr>The Contract Sum will be (increased) (decreased) (unchanged) by this Change Order in the amount of:\u003Cbr>The new Contract Sum including this Change Order will be:\u003Cbr>The Contract Time will be (increased) (decreased) (unchanged) by ( ) days |  |  | $  $  $  \u003Cbr>$  $   |\n| The date of Substantial Completion as of the date of this Change Order therefore is:   |  |  |  |\n| NOT VALID UNTIL SIGNED BY DESIGNER, CONTRACTOR, AND GSD.\u003Cbr>Designer Address Authorized Signature Typed/Printed Name\u003Cbr>Date\u003Cbr>Contractor Address Authorized Signature Typed/Printed Name\u003Cbr>Date |  | GRANITE SCHOOL DISTRICT |  |\n|  |  | 2500 South State Street\u003Cbr>Salt Lake City, UT 84115 |  |\n|  |  |  |  |\n|  |  | Authorized Signature |  |\n|  |  | Typed/Printed Name |  |\n|  |  | Date |  |\n\nGSD Change Order Form Page 1 of 2  \nRevision Date-February 27, 2024  \nITEMIZED COST  \nITEM  \nDESCRIPTION COST  \n\n| Additional items attached | Total this Change Order |  |\n| --- | --- | --- |\n| SUMMARY OF PREVIOUSLY AUTHORIZED CHANGE ORDERS\u003Cbr>DATE CHANGE ORDER NUMBER |  | COST |\n\n\n| Additional Change Orders attached | Total of Previously Authorized Change Orders |\n| --- | --- |\n\nGSD Change Order Form  \nRevision Date-February 27, 2024  \nPage 2 of 2","cbCaicYgqau2eKv0","https://ap.wps.com/l/cbCaicYgqau2eKv0","pdf",536356,"English","# CONSTRUCTION CHANGE ORDER FORM\n## Modification to the Contract as follows:\n## Original Contract Sum was:\n## The Contract Sum will be (increased) (decreased) (unchanged) by this Change Order in the amount of:\n## The new Contract Sum including this Change Order will be:\n## The Contract Time will be (increased) (decreased) (unchanged) by ( ) days\n## The date of Substantial Completion as of the date of this Change Order therefore is:\n## ITEMIZED COST\n## SUMMARY OF PREVIOUSLY AUTHORIZED CHANGE ORDERS","[{\"question\":\"What is the purpose of this Construction Change Order Form?\",\"answer\":\"This form is used to document modifications to an existing construction contract for projects managed by the Granite School District. It details changes to the contract sum and timeline.\"},{\"question\":\"What information is required to complete the form?\",\"answer\":\"The form requires details such as the project name, date, change order number, contractor information, GSD project number, and a description of the modifications. Signatures from the designer, contractor, and GSD are also necessary.\"},{\"question\":\"How are cost changes handled on this form?\",\"answer\":\"The form includes sections for the original contract sum, previously authorized change orders, and the specific amount of the current change order (increase or decrease). It also has a section for itemized costs and a summary of all previously authorized changes.\"}]","Construction Change Order Form | PDF",1789201061]