[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-178353-105":53,"doc-detail-178353-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","construction-and-startup-notification-form-submit-and-sign-air-permit-compliance","Construction and startup notification form - Submit and sign - Air permit compliance","","Construction and startup notifications require submitting a Construction and startup notification form when permits call for notification of construction start or initial startup. The guidance specifies using one form per Subject Item and outlines what facility and Subject Item information to provide, including the type of notification. For engines not certified by the manufacturer to meet emission standards, additional details are required: owner/operator name and address, affected source address, comprehensive engine information, emission control equipment, and fuel used, aligned with referenced CFR requirements.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":41,"@type":70,"position":76},"https://docshare.wps.com/template/letters/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/construction-and-startup-notification-form-submit-and-sign-air-permit-compliance/178353/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/construction-and-startup-notification-form-submit-and-sign-air-permit-compliance/178353.png","ImageObject",442,249,{"name":88,"@type":89},"Caleb Sterling","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-22","2026-09-02",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",8,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"When should the Construction and startup notification form be used?","Question",{"text":109,"@type":110},"Use it when a permit requires notification of construction or initial startup, including notifications required under the referenced CFR sections or when the permit directs the permittee to use this form.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How many forms must be submitted?",{"text":114,"@type":110},"Submit one form for each Subject Item.",{"name":116,"@type":107,"acceptedAnswer":117},"What information is required for notifications involving non-certified engines?",{"text":118,"@type":110},"Include owner/operator name and address, affected source address, detailed engine information (make, model, engine family, serial number, model year, maximum power, displacement), emission control equipment, and the fuel used.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},178353,1790476622,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":40,"category_name":41,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":4},962084925290,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","Instructions: Complete and sign form, then create a PDF copy and email to: \u0013 HYPERLINK \"mailto:AQRoutineReport.PCA@state.mn.us\" \u0014AQRoutineReport.PCA@state.mn.us\u0015. For more information visit the \u0013 HYPERLINK \"https://www.pca.state.mn.us/business-with-us/air-permit-compliance-forms\" \u0014Air permit compliance forms webpage\u0015.\nGeneral information about notifications of construction and startup\nIf your permit requires you to submit a notification of construction or initial startup, you should use this Construction and startup notification form. This form applies to such notifications that are required by 40 CFR pt. 60, 40 CFR pt. 61, and 40 CFR pt. 63, as well as any notification where the permit requires the permittee to use this form. Submit one form for each Subject Item.\nFacility and Subject Item information\nType of notification\nIf this notification is for the date construction began for an engine that has not been certified by the manufacturer to meet the emission standards in 40 CFR § 60.4231, as required by 40 CFR § 60.7(a)(1) and 60.4245(c), include the following with your notification:\n(1) Name and address of the owner/operator.\n(2) Address of the affected source.\n(3) Engine information including make, model, engine family, serial number, model year, maximum engine power, and engine displacement.\n(4) Emission control equipment.\n(5) Fuel used.","cbCaioquFFmafSD5","https://ap.wps.com/l/cbCaioquFFmafSD5","docx",67612,"English","# Facility and Subject Item information\n## Type of notification\n## Engine not certified: required details","[{\"question\":\"When should the Construction and startup notification form be used?\",\"answer\":\"Use it when a permit requires notification of construction or initial startup, including notifications required under the referenced CFR sections or when the permit directs the permittee to use this form.\"},{\"question\":\"How many forms must be submitted?\",\"answer\":\"Submit one form for each Subject Item.\"},{\"question\":\"What information is required for notifications involving non-certified engines?\",\"answer\":\"Include owner/operator name and address, affected source address, detailed engine information (make, model, engine family, serial number, model year, maximum power, displacement), emission control equipment, and the fuel used.\"}]","Construction and startup notification form - Submit and sign - Air permit compliance | DOCX",1788331439]