[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-244911-105":53,"doc-detail-244911-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","connected-corridors-i-210-pilot-integrated-corridor-management-system-project-management-plan-february-10-2017","Connected Corridors: I-210 Pilot Integrated Corridor Management System - Project Management Plan - February 10, 2017","","Project Management Plan for the Connected Corridors I-210 pilot integrated corridor management system, developed under the Partners for Advanced Transportation Technology at UC Berkeley. Describes the purpose and intended audience, alignment with the systems engineering process, corridor and transportation system definition, project motivation, goals, and objectives. Defines the project management approach including standards, organization, responsibilities, and collaboration tools, then covers a preliminary work breakdown structure, major milestones and deliverables, and change and scope management plans with governance, logging, and roles.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/connected-corridors-i-210-pilot-integrated-corridor-management-system-project-management-plan-february-10-2017/244911/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/connected-corridors-i-210-pilot-integrated-corridor-management-system-project-management-plan-february-10-2017/244911.png","ImageObject",442,249,{"name":88,"@type":89},"Violet","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-19","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",13,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is the purpose of the Project Management Plan for the I-210 pilot?","Question",{"text":109,"@type":110},"The plan sets out why and how the project will be managed, including its alignment with the systems engineering process and the management standards used throughout delivery.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"Who is the intended audience for this document?",{"text":114,"@type":110},"The document defines an intended audience for using the plan, focusing on stakeholders who need guidance on project management activities and governance.",{"name":116,"@type":107,"acceptedAnswer":117},"What topics are covered in the change management plan?",{"text":118,"@type":110},"The change management plan explains the change management approach, the role of the change control board, change control phases, and how changes are logged and tracked.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},244911,1791161680,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":141,"read_time":142},4398048950312,"https://ap-avatar.wpscdn.com/avatar/400002538284de19e3c?_k=1778320343897328908","PARTNERS FOR ADVANCED TRANSPORTATION TECHNOLOGY INSTITUTE OF TRANSPORTATION STUDIES  \nUNIVERSITY OF CALIFORNIA, BERKELEY  \nConnected Corridors: I-210 Pilot Integrated Corridor Management System  \nProject Management Plan  \nFebruary 10, 2017  \nPartners for Advanced Transportation Technology works with researchers, practitioners, and industry to implement transportation research and innovation, including products and services that improve the efficiency, safety, and security of the transportation system.  \nThis page left blank intentionally  \nPrimary Author  \nFrancois Dion, PhD, PE (Michigan)  \nSenior Development Engineer  \nCalifornia PATH  \nUniversity of California, Berkeley  \nContributing Authors  \nHari Hirani  \nSenior Development Engineer  \nCalifornia PATH  \nUniversity of California, Berkeley  \nAshkan Sharafsaleh, PE (California)  \nSenior Research and Development Engineer California PATH  \nUniversity of California, Berkeley  \nLisa Hammon  \nProject/Policy Analyst  \nCalifornia PATH  \nUniversity of California, Berkeley  \nFred Winik  \nTechnical Writer  \nCalifornia PATH  \nUniversity of California, Berkeley  \nJoe Butler  \nProject Manager  \nCalifornia PATH  \nUniversity of California, Berkeley  \nThis page left blank intentionally  \nREVISION HISTORY  \n\n| Date | Sections | Change Description |\n| --- | --- | --- |\n| 03/18/2014 | All | Initial document |\n| 04/21/2015 | All | Various revisions to provide conformity with SEMP |\n| 06/19/2015 | Schedule Management Plan | Updated project schedule |\n| 09/25/2015 | Schedule Management Plan; Appendix B; Appendix C | Updated project schedule; Caltrans personnel change |\n| 06/15/2016 | Schedule Management Plan; Appendix B; Appendix C | Updated project schedule; Caltrans personnel change |\n| 02/10/2017 | Project Management Approach, Schedule Management Plan; Appendix B; Appendix C;\u003Cbr>Appendix D; Appendix E | Updated project schedule; organizational chart, personnel directory; risk registry |\n\nThis page left blank intentionally  \nTABLE OF CONTENTS  \nList of Figures.................................................................................................................................... xi  \nList of Tables .................................................................................................................................... xii  \n1. Introduction ................................................................................................................................1  \n Purpose of the Project Management Plan ............................................................................. 1  \n Intended Audience ................................................................................................................. 2  \n Relation to Systems Engineering Process .............................................................................. 2  \n Project Motivation ................................................................................................................. 4  \n Project Definition ................................................................................................................... 4  \n Corridor Boundaries ............................................................................................................... 5  \n Transportation Systems Under Consideration ....................................................................... 6  \n Problems to be Addressed ..................................................................................................... 7  \n Project Goals and Objectives ............................................................................................... 11  \n Specific Plans Developed within the Document .................................................................. 12  \n2. Project Management Approach .................................................................................................. 13  \n Application of Project Management Standards ......................................................","cbCaiihLe6ya5Hnp","https://ap.wps.com/l/cbCaiihLe6ya5Hnp","pdf",4304422,122,"English","# 1. Introduction\n## Purpose of the Project Management Plan\n## Intended Audience\n## Relation to Systems Engineering Process\n## Project Motivation\n## Project Definition\n## Corridor Boundaries\n## Transportation Systems Under Consideration\n## Problems to be Addressed\n## Project Goals and Objectives\n## Specific Plans Developed within the Document\n# 2. Project Management Approach\n## Application of Project Management Standards\n## Organizational Chart\n## Responsibility Assignments\n## Collaboration Tools\n# 3. Preliminary Work Breakdown Structure\n## Main Project Tasks\n## Key Milestones\n## Key Deliverables\n# 4. Change Management Plan\n## Change Management Approach\n## Composition and Role of Change Control Board\n## Change Control Phases\n## Change Management Log\n# 5. Scope Management Plan\n## Scope Management Approach\n## Roles and Responsibilities","[{\"question\":\"What is the purpose of the Project Management Plan for the I-210 pilot?\",\"answer\":\"The plan sets out why and how the project will be managed, including its alignment with the systems engineering process and the management standards used throughout delivery.\"},{\"question\":\"Who is the intended audience for this document?\",\"answer\":\"The document defines an intended audience for using the plan, focusing on stakeholders who need guidance on project management activities and governance.\"},{\"question\":\"What topics are covered in the change management plan?\",\"answer\":\"The change management plan explains the change management approach, the role of the change control board, change control phases, and how changes are logged and tracked.\"}]","Connected Corridors: I-210 Pilot Integrated Corridor Management System - Project Management Plan - February 10, 2017 | PDF",1789222918,43]