[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-253843-105":53,"doc-detail-253843-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","commercial-roof-inspection-form-complete","Commercial Roof Inspection Form - Complete","","Commercial roof inspection form for school buildings and similar properties, supporting scheduled assessments of roof sections and materials (EPDM, PVC, TPO, MBM, and others). Captures inspection date, roofing contractor and contact details, last inspection date, leak locations and leak types, and whether emergency repairs were performed. Includes a condition matrix using G/F/P and Y/N to record issues across roof entry, drains, metal edge flashing, base flashing, membrane areas, roof-covering field condition, and exterior wall components, with actions taken.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/commercial-roof-inspection-form-complete/253843/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/commercial-roof-inspection-form-complete/253843.png","ImageObject",442,249,{"name":88,"@type":89},"นรินทร์","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-30","2026-09-13",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",10,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What information is collected during a commercial roof inspection?","Question",{"text":109,"@type":110},"The form records inspection date, roofing contractor identity and phone/address, school building and inspector, date of last inspection, and the location of leaks. It also captures whether leaks were recorded and the leak type, plus whether emergency repairs were performed.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How is roof condition documented on this form?",{"text":114,"@type":110},"Each checklist item uses condition codes G (Good, no action), F (Fair, monitor periodically), and P (Poor, immediate action needed), along with a Y/N indicator. An “Action Taken” column records follow-up results.",{"name":116,"@type":107,"acceptedAnswer":117},"What roof areas and components are included in the checklist?",{"text":118,"@type":110},"The checklist covers roof entry (fixed ladder/stairs), drains (internal drains, strainers/clamping ring, scuppers, gutters), metal edge flashing and coping/caps, base flashing and membrane areas, roof covering condition in the field, and exterior wall elements such as mortar joint deterioration, settlement cracks, and water stains.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},253843,1789270927,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":76,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":126,"read_time":9},2336475104957,"https://ap-avatar.wpscdn.com/avatar/22000c4c6bd8a5076e1?x-image-process=image/resize,m_fixed,w_180,h_180&k=1787554080175789136","MASB-SEG PROPERTY/CASUALTY POOL  \nCOMMERCIAL ROOF INSPECTION FORM  \n| ROOF SECTION |  |\n| --- | --- |\n| Roof Covering: |  |\n| c EPDM c EPDM BALLASTED c | PVC c TPO c MBM |\n| c BUR c FULLY ADHERED cc OTHER: | MECHANICALLY ATTACHED |\n|  |  |\n| Warranty: c YES c NO |  |\n\nYEAR INSTALLED EXPIRATION DATE  \n\n| ROOF SECTION |  |\n| --- | --- |\n| Roof Covering: |  |\n| c EPDM c EPDM BALLASTED c | PVC c TPO c MBM |\n| c BUR c FULLY ADHERED cc OTHER: | MECHANICALLY ATTACHED |\n|  |  |\n| Warranty: c YES c NO |  |\n\nYEAR INSTALLED EXPIRATION DATE  \n\n| ROOF SECTION |  |\n| --- | --- |\n| Roof Covering: |  |\n| c EPDM c EPDM BALLASTED c | PVC c TPO c MBM |\n| c BUR c FULLY ADHERED cc OTHER: | MECHANICALLY ATTACHED |\n|  |  |\n| Warranty: c YES c NO |  |\n\nYEAR INSTALLED EXPIRATION DATE  \n\n| ROOF SECTION |  |\n| --- | --- |\n| Roof Covering: |  |\n| c EPDM c EPDM BALLASTED c | PVC c TPO c MBM |\n| c BUR c FULLY ADHERED cc OTHER: | MECHANICALLY ATTACHED |\n|  |  |\n| Warranty: c YES c NO |  |\n\nYEAR INSTALLED EXPIRATION DATE  \nRoof inspections need to be done twice a year, after a severe weather event, or if outside vendors have been on your roofs. These inspections can help extend roof life expectancy, maintain warranties, and reduce the need for emergency repairs.  \nUse the buddy system and follow ladder safety guidelines when entering/exiting the roof.  \n• Survey the entire roof for hazards before performing your work.  \n• Look for tripping hazards, such as wires, pipes, and roof penetrations.  \n• Check your footing before placing your full weight on the roof surface.  \n• Never step or walk on the roof backwards.  \n_________________________________________________________________________ _____________________________________________________________________________  \nINSPECTION DATE  \nROOFING CONTRACTOR  \nSCHOOL BUILDING  \nINSPECTOR  \nROOFING CONTRACTOR PHONE  \nADDRESS  \nDATE OF LAST INSPECTION  \nLOCATION OF LEAKS  \nHave any leaks been recorded? c YES c NO  \nType of leak: c LIGHT RAIN c HEAVY RAIN c WIND c SPRING THAW  \nEmergency repairs? c YES c NO  \nIf yes, briefly describe previous maintenance and repair work completed:    \n______________________________________________________________________________________________________________________________________________________  \nContinue on next page  \nMASB-SEG PROPERTY/CASUALTY POOL  \nCOMMERCIAL ROOF INSPECTION FORM CONT   \nCONDITION:  \nG = Good, No Action  \nF = Fair, Monitor Periodically  \nP = Poor, Immediate Action Needed Y = Yes  \nN = No  \n|  | G | F | P | Y/N | LOCATION | ACTION TAKEN |\n| --- | --- | --- | --- | --- | --- | --- |\n| ROOF ENTRY |  |  |  |  |  |  |\n| Fixed Ladder/Stairs (Ground) |  |  |  | Y\u003Cbr>N |  |  |\n| Fixed Ladder (Different Roof Levels) |  |  |  | Y\u003Cbr>N |  |  |\n| DRAINS |  |  |  |  |  |  |\n| Internal Drains |  |  |  | Y\u003Cbr>N |  |  |\n| Strainers/Clamping Ring |  |  |  | Y\u003Cbr>N |  |  |\n| Scuppers |  |  |  | Y\u003Cbr>N |  |  |\n| Gutters |  |  |  | Y\u003Cbr>N |  |  |\n| METAL EDGE FLASHING/ COPING/CAPS |  |  |  |  |  |  |\n| Loose/Missing Fasteners |  |  |  | Y\u003Cbr>N |  |  |\n| Open Joints |  |  |  | Y\u003Cbr>N |  |  |\n| Loose/Missing Joint Covers |  |  |  | Y\u003Cbr>N |  |  |\n| Punctures |  |  |  | Y\u003Cbr>N |  |  |\n| Cracked Sealant/Fasteners/Joints |  |  |  | Y\u003Cbr>N |  |  |\n| Membrane Still in Place |  |  |  | Y\u003Cbr>N |  |  |\n| BASE FLASHING (MEMBRANE) |  |  |  |  |  |  |\n| Adhesion/Loose/Wrinkling |  |  |  | Y\u003Cbr>N |  |  |\n| Billowing (Wind) |  |  |  | Y\u003Cbr>N |  |  |\n| Seams/Attachment to Field |  |  |  | Y\u003Cbr>N |  |  |\n| Vertical Laps (Seams) |  |  |  | Y\u003Cbr>N |  |  |\n| Deterioration (Holes) |  |  |  | Y\u003Cbr>N |  |  |\n| Wall Termination Bar/Sealant |  |  |  | Y\u003Cbr>N |  |  |\n\nContinue on next page  \nMASB-SEG PROPERTY/CASUALTY POOL  \nCOMMERCIAL ROOF INSPECTION FORM CONT   \nCONDITION:  \nG = Good, No Action  \nF = Fair, Monitor Periodically  \nP = Poor, Immediate Action Needed Y = Yes  \nN = No  \n|  | G | F | P | Y/N | LOCATION | ACTION TAKEN |\n| --- | --- | --- | --- | --- | --- | --- |\n| ROOF COVERING\u003Cbr>CONDITION ","cbCaiqV6hK8ahjxp","https://ap.wps.com/l/cbCaiqV6hK8ahjxp","pdf",344512,"English","# Inspection Information\n## Roof Covering, Warranty, and Dates\n## Contractor and Building Details\n## Leak and Emergency Repair Notes\n# Condition and Action Checklist\n## Condition Codes (G/F/P) and Yes/No\n## Roof Entry, Drains, and Flashing Components\n## Roof Covering Field Conditions and Exterior Walls","[{\"question\":\"What information is collected during a commercial roof inspection?\",\"answer\":\"The form records inspection date, roofing contractor identity and phone/address, school building and inspector, date of last inspection, and the location of leaks. It also captures whether leaks were recorded and the leak type, plus whether emergency repairs were performed.\"},{\"question\":\"How is roof condition documented on this form?\",\"answer\":\"Each checklist item uses condition codes G (Good, no action), F (Fair, monitor periodically), and P (Poor, immediate action needed), along with a Y/N indicator. An “Action Taken” column records follow-up results.\"},{\"question\":\"What roof areas and components are included in the checklist?\",\"answer\":\"The checklist covers roof entry (fixed ladder/stairs), drains (internal drains, strainers/clamping ring, scuppers, gutters), metal edge flashing and coping/caps, base flashing and membrane areas, roof covering condition in the field, and exterior wall elements such as mortar joint deterioration, settlement cracks, and water stains.\"}]","Commercial Roof Inspection Form - Complete | PDF"]