[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-253827-105":53,"doc-detail-253827-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","commercial-private-utilities-inspection-form","Commercial Private Utilities Inspection Form","","This document is a Commercial Private Utilities Inspection Form used to ensure the proper installation of water, sewer, and storm water utilities. It requires completion by a Master Plumber or Engineer, verifying that the utilities have been installed according to approved Civil Plans, meeting material and workmanship standards, and complying with the 2024 I-codes or city-approved plans. The form includes fields for the date, address, permit number, building number, Master Plumber of Record's details (print name, address, license number, signature), and a section for a State of Texas Professional Engineer (print name, signature, and stamp). The Chief Building Official is the recipient of this certification, confirming that the private utilities are installed correctly within 5 feet of the building. This form serves as a crucial record for municipal building inspections and utility compliance.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/commercial-private-utilities-inspection-form/253827/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/commercial-private-utilities-inspection-form/253827.png","ImageObject",442,249,{"name":88,"@type":89},"Rhys","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-25","2026-09-13",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",13,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"Who is responsible for completing the Commercial Private Utilities Inspection Form?","Question",{"text":109,"@type":110},"The form must be completed by a Master Plumber or a State of Texas Professional Engineer.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What utilities does this inspection form cover?",{"text":114,"@type":110},"This form covers the installation of private utilities including water, sewer, and storm water.",{"name":116,"@type":107,"acceptedAnswer":117},"What standards must the utility installation comply with?",{"text":118,"@type":110},"The utility installation must comply with the approved Civil Plans regarding material and workmanship, and adhere to the 2024 I-codes or city-approved plans.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},253827,1790490901,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":4},687207024643,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","Commercial Private Utilities Inspection Form  \n(Please have Master Plumber or Engineer complete letter)  \nDate:   \nAddress:   \nPermit Number:    \nBuilding Number:    \nTo the Chief Building Official:  \nThe Private Utilities at the above location to include water, sewer and storm water have been installed per the approved Civil Plans as to material and workmanship to within 5ft of the building. In addition, the installation of these utilities are in compliance with the 2024 I-codes and/or the city approved plans.  \nMaster Plumber of Record:    \n(Print)  \nAddress:    \nPlumbing License Number:    \nSignature of Master Plumber:    \nState of Texas Professional Engineer    \n(Print)  \n(Signature)  \n(Stamp)","cbCaibeJJXRUBIOb","https://ap.wps.com/l/cbCaibeJJXRUBIOb","pdf",62638,"English","# Commercial Private Utilities Inspection Form\n## To the Chief Building Official","[{\"question\":\"Who is responsible for completing the Commercial Private Utilities Inspection Form?\",\"answer\":\"The form must be completed by a Master Plumber or a State of Texas Professional Engineer.\"},{\"question\":\"What utilities does this inspection form cover?\",\"answer\":\"This form covers the installation of private utilities including water, sewer, and storm water.\"},{\"question\":\"What standards must the utility installation comply with?\",\"answer\":\"The utility installation must comply with the approved Civil Plans regarding material and workmanship, and adhere to the 2024 I-codes or city-approved plans.\"}]","Commercial Private Utilities Inspection Form | PDF",1789270705]