[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-393305-105":53,"doc-detail-393305-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","commercial-electrical-required-documents-2023-submittal-checklist","Commercial Electrical Required Documents - 2023 - Submittal Checklist","","Commercial electrical submittal checklist outlining required drawings and calculations for permit review. Specifies legend for lighting and power symbols, electrical site plan with panel and circuit identification, and one-line/riser diagrams showing existing and new service equipment details such as volts, amps, phase, and AIC ratings. Includes grounding and panel schedules, GFCI requirements, interior/exterior lighting and entry/egress controls, low-voltage and communication/emergency/special occupancy systems, and load calculations with motor location and ratings. References FBC Energy Conservation 8th Edition (2023) and NEC 2020 on plans, and notes it is a guidance document for Manatee County Development Services approval.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":51,"@type":70,"position":76},"https://docshare.wps.com/template/general/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/commercial-electrical-required-documents-2023-submittal-checklist/393305/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/commercial-electrical-required-documents-2023-submittal-checklist/393305.png","ImageObject",442,249,{"name":88,"@type":89},"Terk","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-11-03","2026-09-26",true,{"@type":98,"interactionType":99,"userInteractionCount":20},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What plans and diagrams are required in the commercial electrical submittal?","Question",{"text":108,"@type":109},"The checklist requires an electrical site plan, a legend for lighting and power symbols, and an electrical one-line or riser diagram showing all service equipment. The one-line/riser diagram must include existing and new equipment and key electrical ratings such as volts, amps, phase, and AIC rating.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What must be included in panel schedules?",{"text":113,"@type":109},"Panel schedule(s) must list MLO (Main Lug Only) or MCB (Main Circuit Breaker), panel ampacity, NEMA type, voltage, phase, AIC rating, and all overcurrent protection with interrupting rating.",{"name":115,"@type":106,"acceptedAnswer":116},"Which code references and standards must the drawings follow?",{"text":117,"@type":109},"Drawings must be designed to FBC Energy Conservation 8th Edition (2023) and NEC 2020. The document specifies showing NEC 2020 on plans and provides the reference: FBC Building 8th Edition (2023) Section 107.3.5 NEC 2020.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},393305,1791093009,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":50,"category_name":51,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":20,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":4},1099525198933,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","COMMERCIAL ELECTRICAL REQUIRED DOCUMENTS  \n􀂅 Legend showing Lighting and Power symbols used on drawings.  \n􀂅 Electrical site plan required. Panels and service equipment must be identified and located, and all circuits will be designated and identified on plans, Breaker number for everything electrical with size of wire and conduit size.  \n􀂅 Provide Electrical one line or Riser Diagram of all service equipment: (Example: Grounding, Transformer(s), Meter(s), Main Distribution Panel, and Sub Panel(s) with conductor size/type and conduit size/type. (Note the Existing and New Equipment) . Information listed on the equipment should include: Volts, Amps, Phase, and AICRating.  \n􀂅 Show all grounding details.  \n􀂅 Provide Panel Schedule(s) listing: MLO (Main Lug Only) or MCB (Main Circuit Breaker), Ampacity of Panel, NEMA type, Voltage, Phase, AIC rating, show allovercurrent protection with interrupting rating.  \n􀂅 Provide GFCI requirements both inside and outside.  \n􀂅 Provide adequate Lighting Inside and Outside for proper illumination as required within, and at all entry/egress locations within the area outside on building. (provide requirements for occupant censor controls FBC Energy Conservation, Section C405.2.1  \n􀂅 Show all low voltage.  \n􀂅 Show all communication systems.  \n􀂅 Show all emergency systems.  \n􀂅 Show all special occupancies.  \n􀂅 Provide Load Calculations.  \n􀂅 Location, voltage, horsepower, current, of every motor.  \n􀂅 Show all wiring methods and materials.  \n􀂅 All drawings need to be designed to FBC Energy Conservation 8th Edition (2023) .  \n􀂅 Show NEC 2020 on plans.  \nCode Reference: FBC Building 8th Edition (2023) Section 107.3.5 NEC 2020  \nThis document is intended to be a guide and may not contain all requirements needed to obtain permits and approval from Manatee County  \nDevelopment Services Department  \n9000 Town Center Parkway  \nLakewood Ranch, FL 34202  \nPhone: (941) 748-4501  \n[www.mymanatee.org](www.mymanatee.org)","cbCaijQx4hNpUFVp","https://ap.wps.com/l/cbCaijQx4hNpUFVp","pdf",375828,"English","# Required Electrical Submittal Items\n## Drawings, Diagrams, and Plans\n## Panel Schedules and Protection Devices\n## Grounding, GFCI, Lighting, and Systems\n## Calculations and Motor Data\n## Wiring Methods, Code References, and Submission Notes","[{\"question\":\"What plans and diagrams are required in the commercial electrical submittal?\",\"answer\":\"The checklist requires an electrical site plan, a legend for lighting and power symbols, and an electrical one-line or riser diagram showing all service equipment. The one-line/riser diagram must include existing and new equipment and key electrical ratings such as volts, amps, phase, and AIC rating.\"},{\"question\":\"What must be included in panel schedules?\",\"answer\":\"Panel schedule(s) must list MLO (Main Lug Only) or MCB (Main Circuit Breaker), panel ampacity, NEMA type, voltage, phase, AIC rating, and all overcurrent protection with interrupting rating.\"},{\"question\":\"Which code references and standards must the drawings follow?\",\"answer\":\"Drawings must be designed to FBC Energy Conservation 8th Edition (2023) and NEC 2020. The document specifies showing NEC 2020 on plans and provides the reference: FBC Building 8th Edition (2023) Section 107.3.5 NEC 2020.\"}]","Commercial Electrical Required Documents - 2023 - Submittal Checklist | PDF",1790382891]