[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-240706-105":53,"doc-detail-240706-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","commercial-construction-budget-template-preliminary-construction-budget","Commercial-Construction-Budget-Template - Preliminary Construction Budget","","Preliminary construction budget for a sample commercial project, organized by major scopes: offsite work, sitework, and building shell & core. Offsite items include surveying, erosion/dust control, earthwork/demolition, paving, landscaping, water lines/meters, sewer and storm drain work, bus stop, offsite concrete, and extensive street SCE/TELCO/CATV undergrounding, plus final clean-up. Sitework covers surveying, erosion control, earthwork, paving, utilities, landscaping, fire service, storm drains, decorative concrete, retaining walls, waterproofing, allowances, and construction clean-up, followed by subtotaling to total budget.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/commercial-construction-budget-template-preliminary-construction-budget/240706/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/commercial-construction-budget-template-preliminary-construction-budget/240706.png","ImageObject",442,249,{"name":88,"@type":89},"\tCallum ","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-11-02","2026-09-11",true,{"@type":98,"interactionType":99,"userInteractionCount":45},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"How is the preliminary construction budget organized in the template?","Question",{"text":108,"@type":109},"It is structured into offsite work, sitework, and building shell & core, then rolled up into subtotals and a total budget including general conditions, contingency, liability insurance, and fees.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"Which offsite cost items are included under Offsite work?",{"text":113,"@type":109},"The offsite section lists surveying, erosion/dust control & barricades, earthwork & demolition, A.C. paving, striping/signage, landscaping/irrigation, water lines/meters/detector check, sewer lines, storm drain, bus stop, offsite concrete, construction/final clean-up, and street undergrounding for SCE/TELCO/CATV.",{"name":115,"@type":106,"acceptedAnswer":116},"What are the key exclusions and qualifications for the budget?",{"text":117,"@type":109},"The exclusions specify that permits and fees are excluded; dry/wet utility fees, assessments, and hook-up charges are excluded; architectural/engineering costs are excluded; testing/inspection costs are excluded; hazardous/asbestos removal is excluded; and several offsite or specific T.I. and site security items are excluded or controlled by alternates.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},240706,1791733539,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":45,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":73},137451211410,"https://ap-avatar.wpscdn.com/avatar/2000bb0a9246f588df?x-image-process=image/resize,m_fixed,w_180,h_180&k=1786362646172706240","Preliminary Construction  \nBudget  \n\n| Project: Sample Project\u003Cbr>Location: Somewhere, CA\u003Cbr>Date: 2007 | Offsite 48,600 SF\u003Cbr>Site 391,500 SF\u003Cbr>Buildings 135,255 SF\u003Cbr>Core 9,850 SF |\n| --- | --- |\n\nA  O F F S I T E  \n\n| NO | DESCRIPTION | REMARKS | COST | S/F COST |\n| --- | --- | --- | --- | --- |\n| 1 | SURVEY |  | 22,650 | 0.43 |\n| 2 | EROSION / DUST CONTROL & BARRICADES |  | 47,634 | 0.91 |\n| 3 | EARTHWORK & DEMOLITION |  | 38,954 | 0.74 |\n| 4 | A.C. PAVING |  | 173,595 | 3.31 |\n| 5 | STRIPING / SIGNAGE |  | 3,700 | 0.07 |\n| 6 | LANDSCAPE / IRRIGATION |  | 77,950 | 1.48 |\n| 7 | WATER LINES / METERS / DETECTOR CHECK |  | 82,000 | 1.56 |\n| 8 | SEWER LINES |  | 8,750 | 0.17 |\n| 9 | STORM DRAIN |  | 20,500 | 0.39 |\n| 10 | BUS STOP |  | 50,000 | 0.95 |\n| 11 | OFFSITE CONCRETE |  | 112,769 | 2.15 |\n| 12 | UNDER-GROUNDING SCE/TELCO/CATV @ STREETS |  | 543,940 | 10.36 |\n| 13 | CONSTRUCTION & FINAL CLEAN-UP |  | 5,000 | 0.10 |\n|  | TOTAL OFFSITE | 15,360 SF | 1,187,441 | 22.62 |\n\nB  S I T E W O R K  \n\n| NO | DESCRIPTION | REMARKS | COST | S/F COST |\n| --- | --- | --- | --- | --- |\n| 1 | SURVEYING |  | 48,760 | 0.14 |\n| 2 | EROSION & DUST CONTROL |  | 76,000 | 0.22 |\n| 3 | EARTHWORK & DEMOLITION |  | 363,230 | 1.03 |\n| 4 | A.C. PAVING |  | 311,135 | 0.88 |\n| 5 | STRIPING / BUMPERS |  | 8,638 | 0.02 |\n| 6 | LANDSCAPE / IRRIGATION |  | 463,000 | 1.32 |\n| 7 | SITE DOMESTIC WATER |  | 19,055 | 0.05 |\n| 8 | SITE SEWER |  | 34,654 | 0.10 |\n| 9 | SITE FIRE SERVICE |  | 69,577 | 0.20 |\n| 10 | SITE STORM DRAIN |  | 48,040 | 0.14 |\n| 11 | DECORATIVE CONCRETE PAVING |  | 157,938 | 0.45 |\n| 12 | SITE CONCRETE |  | 266,499 | 0.76 |\n| 13 | MASONRY RETAINING WALLS |  | 76,537 | 0.22 |\n| 14 | TRASH ENCLOSURES |  | 22,000 | 0.06 |\n| 15 | WATERPROOFING & DRAIN LINES |  | 20,250 | 0.06 |\n| 16 | SITE IMPROVEMENT ALLOWANCES |  | 155,000 | 0.44 |\n| 17 | MONUMENT SIGN ALLOWANCES |  | 60,000 | 0.17 |\n| 18 | SITE FURNISHING ALLOWANCES |  | 15,000 | 0.04 |\n| 19 | BIKE RACKS |  | 3,000 | 0.01 |\n| 20 | SITE ELECT / SCE / TELE / CATV / LIGHTING |  | 323,088 | 0.92 |\n| 21 | WQMP REQUIREMENTS |  | 400,000 | 1.14 |\n| 22 | CONSTRUCTION & FINAL CLEAN-UP |  | 25,000 | 0.07 |\n|  | TOTAL SITEWORK | 351,706 SF | 2,966,401 | 8.43 |\n\nRM Dalton Corp. Cost Summary Page 1 of 3  \nPreliminary Construction  \nBudget  \n\n| Project: Sample Project\u003Cbr>Location: Somewhere, CA\u003Cbr>Date: 2007 | Offsite 48,600 SF\u003Cbr>Site 391,500 SF\u003Cbr>Buildings 135,255 SF\u003Cbr>Core 9,850 SF |\n| --- | --- |\n\nC  B U I L D I N G S H E L L & C O R E :  \n\n| NO | DESCRIPTION | REMARKS | COST | S/F COST |\n| --- | --- | --- | --- | --- |\n| 1\u003Cbr>2 3\u003Cbr>4 5\u003Cbr>6 7\u003Cbr>8 9\u003Cbr>10\u003Cbr>11\u003Cbr>12\u003Cbr>13\u003Cbr>14\u003Cbr>15\u003Cbr>16\u003Cbr>17\u003Cbr>18\u003Cbr>19\u003Cbr>20\u003Cbr>21\u003Cbr>22\u003Cbr>23\u003Cbr>24\u003Cbr>25\u003Cbr>26\u003Cbr>27\u003Cbr>28\u003Cbr>29\u003Cbr>30\u003Cbr>31\u003Cbr>32\u003Cbr>33 | BUILDING CONCRETE / REBAR CONCRETE SEALER\u003Cbr>1 1/2\" LIGHT WEIGHT FILL STRUCTURAL / MISCELLANEOUS STEEL METAL DECKING\u003Cbr>ROUGH CARPENTRY MILLWORK\u003Cbr>GRANITE TOPS WATERPROOFING INSULATION & FIRE SAFEING ROOFING\u003Cbr>SHEET METAL/ROOF SCREENS/METAL ROOF/CANO CAULKING\u003Cbr>DOORS / FRAMES / HARDWARE GLASS / GLAZING\u003Cbr>HARD SHELL CORNICE DRYWALL & METAL STUDS CERAMIC TILE INTERIOR SIMULATED STONE EXTERIOR RESIL FLOOR & CARPET PAINTING\u003Cbr>TOILET PARTITION & ACCESSORIES FIRE EXTINGUISHERS\u003Cbr>KNOX BOX\u003Cbr>MISC SPECIALTIES\u003Cbr>MISC SIGNAGE ELEVATORS PLUMBING FIRE\u003Cbr>HVAC ELECTRICAL FIRE ALARM\u003Cbr>FINAL CLEAN-UP | PY | 1,674,200\u003Cbr>1,190\u003Cbr>94,673 1,931,160\u003Cbr>344,335\u003Cbr>165,723\u003Cbr>13,875 51,600\u003Cbr>8,000 23,866 176,780\u003Cbr>223,805 25,424 103,300\u003Cbr>722,500\u003Cbr>128,275\u003Cbr>306,651 98,444 133,408\u003Cbr>14,080 89,245 44,340\u003Cbr>3,150\u003Cbr>1,000\u003Cbr>2,500\u003Cbr>4,000\u003Cbr>324,000\u003Cbr>248,810\u003Cbr>200,600\u003Cbr>1,184,000\u003Cbr>457,886\u003Cbr>20,800\u003Cbr>44,950 | 13.78\u003Cbr>0.01\u003Cbr>0.78\u003Cbr>15.89\u003Cbr>2.83\u003Cbr>1.36\u003Cbr>0.11\u003Cbr>0.42\u003Cbr>0.07\u003Cbr>0.20\u003Cbr>1.45\u003Cbr>1.84\u003Cbr>0.21\u003Cbr>0.85\u003Cbr>5.95\u003Cbr>1.06\u003Cbr>2.52\u003Cbr>0.81\u003Cbr>1.10\u003Cbr>0.12\u003Cbr>0.73\u003Cbr>0.36\u003Cbr>0.03\u003Cbr>0.01\u003Cbr>0.02\u003Cbr>0.03\u003Cbr>2.67\u003Cbr>2.05\u003Cbr>1.65\u003Cbr>9.74\u003Cbr>3.77\u003Cbr>0.17\u003Cbr>0.37 |\n|  | TOTAL BUILDING SHELL & CORE | 1","cbCaijCzAYFRF5V3","https://ap.wps.com/l/cbCaijCzAYFRF5V3","pdf",63688,6,"English","# Preliminary Construction Budget\n## Offsite\n## Sitework\n## Buildings Shell & Core\n## Totals and Adjustments\n## Alternates and Exclusions & Qualifications","[{\"question\":\"How is the preliminary construction budget organized in the template?\",\"answer\":\"It is structured into offsite work, sitework, and building shell \\u0026 core, then rolled up into subtotals and a total budget including general conditions, contingency, liability insurance, and fees.\"},{\"question\":\"Which offsite cost items are included under Offsite work?\",\"answer\":\"The offsite section lists surveying, erosion/dust control \\u0026 barricades, earthwork \\u0026 demolition, A.C. paving, striping/signage, landscaping/irrigation, water lines/meters/detector check, sewer lines, storm drain, bus stop, offsite concrete, construction/final clean-up, and street undergrounding for SCE/TELCO/CATV.\"},{\"question\":\"What are the key exclusions and qualifications for the budget?\",\"answer\":\"The exclusions specify that permits and fees are excluded; dry/wet utility fees, assessments, and hook-up charges are excluded; architectural/engineering costs are excluded; testing/inspection costs are excluded; hazardous/asbestos removal is excluded; and several offsite or specific T.I. and site security items are excluded or controlled by alternates.\"}]","Commercial-Construction-Budget-Template - Preliminary Construction Budget | PDF",1789164345]