[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-167074-en":3,"doc-seo-167074-105":30,"detail-sidebar-cat-1-en-105":91},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":11,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":15,"update_tm":28,"read_time":29},167074,962085662650,"Dozel","https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0",1,17,"Forms","COE Growth – Research Lab Renovation – FWH Prequalification Questionnaire","Prequalification questionnaire for general contractors seeking qualification for COE Growth – Research Lab Renovation – FWH at North Carolina State University on Centennial Campus. Collects contractor eligibility details, including company identity and contact information, business type and statewide uniform certifications, ownership and prior operating names, required North Carolina licensing, regular work scopes, and bonding documentation. Includes pass/fail evaluation logic and references to NC prequalification policy and statute, emphasizing that completing the form does not guarantee approval.","Pursuant to the statute, this form gathers information about the contractors seeking to qualify for the work and provides a general format for the prequalification criteria.  Completing this questionnaire does not guarantee prequalification. Evaluation of the submittal shall be performed by the prequalification committee in accordance with 143-135.8 and the State of NC Prequalification Policy (attached).\nContractors are not to use the blank template from the SCO website but to use the project specific form from the Prequalification Committee.\nPREQUALIFICATION DUE DATE/TIME:\n\u000fProject Description: (An in-depth narrative of the details of the project and any unique features, including but not limited to tight site, overtime/nights/weekend work, specialty trades, LEED certification, research lab, medical space, museum space, occupied renovation, residence hall, special equipment, etc.)\nNorth Carolina State University is seeking qualification statements from general contractors for improvements to COE Growth – Research Lab Renovation - FWH located on Centennial Campus.  The project scope includes condensing a teaching lab, renovating a research lab, and reconfiguring spaces to include 3 new driving simulators. Added scope to this project will include renovation of a shell space on the first floor to include two research labs.\nSECTION 1.  GENERAL COMPANY INFORMATION\n1. a. Primary/Main office location (from where the project will be managed)\n_____________________________________________________________________________________\nCompany Name\n________________________________________________________________________________________________________________________________\nPhysical Address\n________________________________________________________________________________________________________________________________\nMailing Address\n________________________________________________________________________________________________________________________________\nCity/State Zip Code + 4\n(______ )_____________________________________   (_____ ) ________________________________________\nPhone number \t\t\t\t\t\t \tFax number\n______________________________________________________________\t________________________________________________________________\nPrimary Contact Name\t\t\t\t\t\tSecondary Contact Name\n______________________________________________________________\t_______________________________________________________________\nPrimary Contact Email Address\t\t\t\t\t\tSecondary Contact Email Address\n[Matrix: Pass/fail. If information provided, then continue with evaluation.  If not, disqualify.]\nOrganization\n1. b. Business type (check box)  ( Corporation  ( Partnership  ( Limited Liability Company  ( Sole Proprietor  ( Joint\nVenture\nIndicate your NC Statewide Uniform Certification:  (check box): ( MBE ( HBE ( AABE  ( AIBE  ( WBE  ( SDB ( DBE\nSee website link for more information: http://www.doa.nc.gov/hub/swuc.htm\n_______________________ Other (specify) ______________________ Certifying Agency/State (specify)\nIs your firm registered with the State of North Carolina to do business?     (  Yes  (  No\nIs your firm owned or controlled by a parent or any other organization?    (  Yes  (  No\nDescribe Ownership if Yes:_______________________________________________________________________\nList all other names your firm has operated as for the past five (5) years: __________________________________\n[Matrix: Pass/fail. If information provided, then continue with evaluation.  If not, disqualify.]\n1. c.  Licensing Information (Please provide all North Carolina professional licenses required for you to perform your services.)\nNC License number/name of licensee \tLicense Limit/Level       State/County/City Privilege License (provide copy)\n_______________________________    _________________     _________________________________________\n_______________________________    _________________     _________________________________________\n_______________________________    _____________","cbCaij29IGOnLZfM","https://ap.wps.com/l/cbCaij29IGOnLZfM","docx",54648,12,"English","en",105,"# Prequalification Due Date/Time\n## Project Description\n# Section 1: General Company Information\n## Primary/Main Office Location and Contacts\n## Business Type and Statewide Uniform Certification\n## Organization Ownership and Operating Names\n## Licensing Information\n## Type of Work Performed\n## Bonding Requirements","[{\"question\":\"Does completing the prequalification questionnaire guarantee qualification?\",\"answer\":\"No. Completing the questionnaire does not guarantee prequalification, and the prequalification committee evaluates submissions under the referenced NC policy.\"},{\"question\":\"What project scope details are requested in the questionnaire?\",\"answer\":\"Contractors are guided to provide an in-depth project description, and the document specifies the COE Growth – Research Lab Renovation – FWH scope, including teaching lab condensation, research lab renovation, and space reconfiguration for new driving simulators.\"},{\"question\":\"What bonding information must the contractor provide?\",\"answer\":\"The contractor must attach a surety letter within the last 30 days verifying willingness to issue payment and performance bonds with appropriate dollar limits, and must answer whether surety funds were expended on the firm’s behalf in the past 10 years.\"}]","COE Growth – Research Lab Renovation – FWH Prequalification Questionnaire | DOCX",1788207682,4,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":14,"keywords":34,"description":15,"schema_data":35,"social_meta":86,"head_meta":88,"extra_data":90,"updated_unix":28},"coe-growth-research-lab-renovation-fwh-prequalification-questionnaire","",{"@graph":36,"@context":85},[37,53,68],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,48,51],{"item":41,"name":42,"@type":43,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":47},"https://docshare.wps.com/template/","Template",2,{"item":49,"name":13,"@type":43,"position":50},"https://docshare.wps.com/template/forms/",3,{"item":52,"name":14,"@type":43,"position":29},"https://docshare.wps.com/template/coe-growth-research-lab-renovation-fwh-prequalification-questionnaire/167074/",{"url":52,"name":14,"@type":54,"author":55,"headline":14,"publisher":57,"fileFormat":60,"inLanguage":23,"description":15,"dateModified":61,"datePublished":62,"encodingFormat":60,"isAccessibleForFree":63,"interactionStatistic":64},"DigitalDocument",{"name":9,"@type":56},"Person",{"url":41,"name":58,"@type":59},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-02","2026-08-31",true,{"@type":65,"interactionType":66,"userInteractionCount":11},"InteractionCounter",{"@type":67},"ViewAction",{"@type":69,"mainEntity":70},"FAQPage",[71,77,81],{"name":72,"@type":73,"acceptedAnswer":74},"Does completing the prequalification questionnaire guarantee qualification?","Question",{"text":75,"@type":76},"No. Completing the questionnaire does not guarantee prequalification, and the prequalification committee evaluates submissions under the referenced NC policy.","Answer",{"name":78,"@type":73,"acceptedAnswer":79},"What project scope details are requested in the questionnaire?",{"text":80,"@type":76},"Contractors are guided to provide an in-depth project description, and the document specifies the COE Growth – Research Lab Renovation – FWH scope, including teaching lab condensation, research lab renovation, and space reconfiguration for new driving simulators.",{"name":82,"@type":73,"acceptedAnswer":83},"What bonding information must the contractor provide?",{"text":84,"@type":76},"The contractor must attach a surety letter within the last 30 days verifying willingness to issue payment and performance bonds with appropriate dollar limits, and must answer whether surety funds were expended on the firm’s behalf in the past 10 years.","https://schema.org",{"og:url":52,"og:type":87,"og:title":14,"og:site_name":58,"og:description":15},"article",{"robots":89,"canonical":52},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":92},[93,98,102,107,112,117,120,125,130],{"id":94,"doc_module":11,"doc_module_name":46,"category_name":95,"show_sort_weight":96,"slug":97},11,"Presentations",90,"presentations",{"id":21,"doc_module":11,"doc_module_name":46,"category_name":99,"show_sort_weight":100,"slug":101},"Resumes",80,"resumes",{"id":103,"doc_module":11,"doc_module_name":46,"category_name":104,"show_sort_weight":105,"slug":106},14,"Invoices",70,"invoices",{"id":108,"doc_module":11,"doc_module_name":46,"category_name":109,"show_sort_weight":110,"slug":111},15,"Posters",60,"posters",{"id":113,"doc_module":11,"doc_module_name":46,"category_name":114,"show_sort_weight":115,"slug":116},16,"Social Media",50,"social-media",{"id":12,"doc_module":11,"doc_module_name":46,"category_name":13,"show_sort_weight":118,"slug":119},40,"forms",{"id":121,"doc_module":11,"doc_module_name":46,"category_name":122,"show_sort_weight":123,"slug":124},18,"Letters",30,"letters",{"id":126,"doc_module":11,"doc_module_name":46,"category_name":127,"show_sort_weight":128,"slug":129},21,"Paper Templates",5,"papers-templates",{"id":131,"doc_module":11,"doc_module_name":46,"category_name":132,"show_sort_weight":4,"slug":133},158,"General","general-158"]